Loading…
Loading…
2,253 results • Best match
Installation of 6 UP3 pump set for the purpose of stage pumping from ST Sump (near ST work shop) to Golden Pahari Colony along with joining of suction and delivery range (Approx-60 Mtrs) under Amal.NT-ST-JG Project.
Installation of 4 Nos. SP-5 pump and 1 nos. sump pump after dismantling of existing pumps along with base strengthening, suction pipe repairing etc. for unit 1201 (1,2) and 1202(1,2) at pump house of Moonidih Coal Washery.
Supplying laying of 150 dia, 100mm dia D.I. pipe from Latma Hill to New Vidhayak Awas sump with all special fitting air valves, sluice valve, valve chamber etc. for water supply to newly constructed Vidhayak Awas situate at Kute
(A)EXTENSION OF 6INCH PIPE SADBHAW DELIVERY TO EAST CISF POST SIDE FOR FIRE FIGHTING - 300 METER AKWMC OCP AND (B) DISMANTLING, TRANSPORTATION OF 6INCH DIA PIPE DELIVERY AT WEST SUMP - 250 METER AT AKWMC OCP UNDER KATRAS AREA
Laying and fixing of Pipelines with all the associated materials like valves, nut-bolts, etc., for operation of two nos. 1000GPM and one 500GPM pump for dewatering at Sump-04 and new expansion patch in respect of Rohini Project.
DISMANTLING AN DIVERSION OF 6.6KV OVER HEAD LINE NEAR 05 SEAM O/B DUMPING AT AKWMC, OCP UNDER KATRAS AREA.(2) DIVERSION AND ERECTION JOB OF 6.6 KV GRADE POWER LINE AT WEST SIDE OF AMPL SIDE WATER SUMP
Injector, bracket cover, Tappet cover opening and fitting,repair of failed greasing system, fabrication of engine sump protective guard and repair of transmission line steel tubes and rep. of hydraulic tank and RHS mudguard of D/10352 of AKKOCP.
Shifting of 2nos of HT pump motor set in another side of MOCP Jharna sump along with diversion of its 8inch dia and 10inch dia MS pipe range due to gradual decreasing of water level at Muraidih AMP Colliery
Repairing and replacement of worn out spare of Loading section sump pump, repairing and replacement of snub drum 1404 and repairing and replacement of 1406 discharge chute at Loading section at Madhuban Coal Washery under Block-II Area, BCCL .
Erection of 3 span, 6.6 kV Overhead Line from TSS 4202 to existing 3.3 kV OHTL of Ashok sump OH line including painting of poles and Fixing of Danger Notice Board etc. as required under Ashok OCP, Piparwar area.
Complete rewinding repairing of starter and rotor of 250KW 6point6KV 1491rpm Marathon Electric make Motor Sl No 3F660208 5 for operation of HT pump of coal face sump for dewatering of mine of water of Muraidih under AMP Colliery
Laying and Commissioning of 8 inch dia MS pipeline from Jehlitand Pump dewatering pipeline and interconnecting with Main Sumps Pump pipeline for discharge of Water from Jehlitand Sump to Settling Tank behind HEMM Workshop of KDH OCP, NK Area
Fabrication and commissioning of 0ne (01) no PVC drum pontoon for one (01) no of pump capacity 1000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Tapin OCP under Hazaribagh Area.
Different type of pumping and pipeline work i.e shifting and installation of 3200 GPM and 2000 GPM pump and shifting of 10 and a pipe at MCP main sump for De-Watering of ABOCP Mine under Block-II Area
Different type of pumping and pipeline work i.e. breakdown pumps dismantling, pumps repair, and assembling work at RR Workshop and pipeline shifting, dismantling (10 inch / 8 inch) dia MS pipe at Departmental Coal (main sump) under ABOCP Mine, Block-
Dismantling of 8 inch delivery pipeline in departmental sump
Dismantling and withdrawal of BD 4000 gpm pump motor set from pontoon of main patch sump and transporting the pump to the feeder breaker for necessary repairing and after repairing transporting and installation of the existing 4000gpm pump motor set
Replacing of B/D 4000GPM pump motor set by another 4000GPM pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at Muraidih, AMP Colliery.
Repairing of 6nos of air breaker switch and repair and maintenance of 6point6 KV overhead line to uninterrupted power supply to domestic water supply pump motor set of Jharna face sump and other miscellaneous electrical works of Muraidih section of A
Work of MS/GI pipeline with dismantling, laying, cutting, jointing, fabrication of bends etc for pump shifting at coal face, No. Sump incl. repairing of old damaged delivery pipelines as when where required as per advancement of mine under Dakra OCP.
Matching of 01 nos. motor pump set with base frame fabrication/modification followed by supplying and fixing tyre coupling set R-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at main sump
Matching of 02 nos. motor pump set with base frame fabrication/modification followed by supplying and fixing tire coupling set R-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Lowering three 4000GPM pump of Jharna face 02times, extension suction pipe, diversion of pipe line of 4000GPM and 2000GPM pump of 3rd patch and extension delivery and maintenance two pump of 3rd patch and three pump of Jharna sump,Muraidih,AMPC.
Shifting of 3000GPM Pump motor set of Jarlahi coal sump from damaged pontoon and installation on ground level and maintenance of pump and reorganise its pipeline and transporting of damage pontoon set to the F/B for repairing at Phularitand,AMPC.
Matching of 01 nos. motor pump set with base frame fabrication/modification followed by supplying and fixing tyre coupling set R-140, base frame foot bolt, suction and delivery nipple fabrication and fitting to install additional pump at face sump
complete repairing and full overhauling with spares of FIVE Nos MnP/WILO make, 1000 GPM multistage and Split case pump assemblies required for 3P Sump and Face pumping considering upcoming monsoon season 2025 in respect of SDOCM, Dhori Area against a
(A)DIVERSION OF POWER FEEDER OF 6.6 KV GRADES TO PASS THROUGH ANGARPATHRA BASTEE IN ORDER TO EXTEND POWER LINE FOR PUMPING AT WEST SIDE SUMP OF AKWMC. (B) DISMANTLING AND ERECTION OF 440 VOLT OVER HEAD LINE SAFTY PURPOSE
Complete repairing rewinding of stator of 75KW, 3 Phase, 415V Motor, 1480 RPM, Make Crompton Greaves, Sl. No. ARL 531 installed at main Sump and Repairing rewinding of 02 Nos. of stator of 22KW, 415V, 38A, 1465 RPM Induction Motor
Dismantling and transporting of 440KW motor from Jarlahi sump to feeder breaker premises and alignment with 2000gpm volcan pump and transporting of one set of pontoon from feeder breaker to main patch along with 2000gpm volcan pump motor set and fitt
Lowering two HT pump of main sump, maint.of pump and pipeline, erection of 6inchdia Pipeline of fire quenching range and diver./exten.of its pipeline in OB and coal face and installation of two Dieselpump and its maint.in CK patch,Muraidih,AMPC.
Shifting, diversion, reorganisation and extension of 6inch dia and 8 inch dia MS G.I. pipe required for shifting of 1000 GPM and 2000 GPM pump at the Coal Face and main sump, due to displacement of water accumulation area bokaro Colliery
Dismantling, extension and diversion of 6.6KV O/H line in different location i.e.Purba face,Jharna face sump and Silo side for uninterrupted power supply to domestic water supply pump and advancement of OB face in Silo side under Muraidih, AMPC.
Providing, fixing, commissioning and testing of 8 inch dia. PVC helical hose pipe (HD) and short pieces making with clamp fittings etc. required for regular shifting and installation of pump aw when as required at mines sump of AKKOCP under BnK
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of NR valve and foot valve for operation of 1300 GPM and 2000 GPM pump at Jehlitand Sump under KDH OCP, NK Area
Erection of additional 8/6 inch , 400 mtr pipe line , dismantling of 1 st and 2 nd pipe line uptp 150 mtr and re erection to new site for shifting of 2000/100 gpm pump at departmental sump, kabribad mine
Laying of new 8 inch dia pipeline (Second range) from coal face sump to Dhupgraha Nala and shifting of 2000 GPM pump as and when required under Dakra Project (Approx total length of new pipeline 1000 Mtr and shifting 200 Mtr.).
(A)02times marching of pontoon with 2000GPM pump motor set from existing position to the another lower side of the sump and leakage repairing of its delivery range and (B) maintenance of above pump at main patch of Phularitand, AMP Colliery.
Dismantling/withdrawal of damaged drum pontoon main patch sump and trans.to F/B for repair and trans.of another Pontoon fromF/B to mainpatch and installation/commission of 4000GPM pump on pontoon and diversion its pipe line at main patch, AMPC.
Shifting of 1000GPM Pump motor set in upper side of Albion OCP sump and 6 inch dia. M.S. Pipe range repairing from Albion OCP to Albion filter plant by replacing of damaged flange and damaged portion of pipes at Damoda Colliery.
Extension of 3.3 KV Overhead line for installation of domestic water supply pump nearby abundant sump to provide 3.3 KV supply for operating motor and installation of 3.3 KV/220Volt Lighting Transformer for Lighting arrangement of Pump site of Amal.N
JOB 1, Diversion of 6 MS pipeline to Sedimentation/Settling tank at main sump, Barmuri OCP, JOB 2, Extension of 6 MS Pipe 102Mtr Horizontal(17 Nos.) laying from Pumping sub-station to New constructed shed and 24 Mtr. Ver
Construction of Random rubble masonry toe wall at water filling point (north-west direction) to improve capacity of sump and check dam, pump foundation and parapet wall at inlet and outlet point of triple row hume pipe culvert near intermediate s
(A) 02times marching of pontoon with 3000GPM pump motor set from existing position to the another lower side of the sump and leakage repairing of its delivery range and (B) maintenance of above pump at main patch of Phularitand, AMP Colliery.
Dismantling of 10/8 inch dia pipe line Deco main sump to Box-III due to rusted and damaged of pipes and after necessary repairing and welding re-laying in safe suitable route at exiting site under Block-II Area
Construction of Transformer room, pump starter room, Guard room, Pump foundation and its covering with GI sheet, fencing its boundary with barbed wire fencing and Construction of permanent roof for water sump at Sijua -3 pit at Mudidih colliery under
welding and supply of 8inch and 10inch dia M S flange with 8inch and 10inch M S pipe for mines sump dewatering preparedness like reorganization , laying and maintenance of 8inch and 10inch M S pipeline w.r.t to konar exp ,BNK Area
Transporting assembling and installation of one set of pontoon 4small box and 1big box on 3rd patch sump and assembling transporting and installation of 4000 GPM pump motor set on the pontoon and jointing its delivery with the existing range transpor
Shifting of all existed pipeline 8 inch, 10 inch about 600M 3x200M from present place of dewatering to other side of the sump to clean the coal face for better approach and coal extraction at quarry no. 03 of kathara colliery.
DISMANTLING OF 800 GPM 6 inch DELIVERY KUMARI JORE FOR HAUL ROAD MAKING AND RE-ERECTION OF THE DELIVERY WITH 8 inch ND 6 inch PIPES AFTER HAUL ROAD COMPLETION AT WEST SUMP 180 MTRS. AKWMC OCP UNDER KATRAS AREA
Extension of LT OH line for providing proper illumination at Departmental and SAINIK Mining working face and the transport road near face sump area after increasing number of wires on the existing overhead line for load distribution under Ashok OCP