2,254 results • Best match
Supply, commissioning and testing of 6 inch dia Jetting Hose Pipe and laying of 6 inch dia G.I. Pipes required for lowering of two nos. of 500 G.P.M. Pumps at the Coal face and the main Sump in respect of Bokaro Colliery
Part shifting and extension of FD No - 2 (3.3 kV) HT OH line and diversion of 230 Volts LT OH line for providing power to the pump sets and proper illumination of pump house near proposed sump of Ashok OCP, Piparwar Area.
Diversion an extension of 3point KV overhead line to the main patch sump to feed power to 4000gpm and 2000gpm pump motor set and extended up to the 541shovel face due to advancement of OB face at SOCP patch Muraidih under AMP Colliery
Assembling transporting and installation of 4000gpm pump motor set in 3rd patch coal face sump and diversion of its delivery for safe and smooth pumping and pipe line operation for the purpose of domestic water supply to chitahi and Barora basti unde
Dismantling, repairing and installation of 2 nos. Sump pumps (at each unit) and their discharge pipelines in tunnel of unit 501-A and tunnel of unit 105 belt conveyors along with cleaning of spilled coal around their sumps at Moonidih Coal Washery.
A.re organisation of 8 dia pipeline with dismantling and shifting of 2000GPM pump two times for dewatering near main sump patch to outside of the Mine, w.r.t. konar exp.OCP, BnK Area, B.Re organization Extension of 8 dia pipeline and 1000 GPM pump
Installation of 2000GPM pump of main coal face sump and erection its delivery to Barora Durga Mandir and jointing with the existing range to Barora village and Chitahi Basti as well as supplying of water to Barora workers colony of Muraidih, AMPC.
Replacing of BD 4000gpm pump motor set of Jharna face and 3rd patch sump and dismantling and transporting of 10inch dia and 8inch dia damaged MS pipe from different place of mine and transporting to attendance room premises for fabrication of bend sh
Shifting of 2000GPM pump, motor set in another side of the sump along with diversion of its 8inch dia M.S. pipe line due advancement of mining activity and maintenance of 2000GPM pump at Old Ghutway Patch -3 of Damoda Colliery under Barora Area.
Complete repairing/reconditioning of (1) 11KV, 400 Amp VCB make Andrew Yule, Sl. No. 154 installed at Dakra Colony (2) 3.3KV, 400 Amp VCB make Electrotechnika used as control of the circuit at 32 No. main sump under Dakra Project, NK Area
Dismantling and withdrawal of 2set of damaged drum pontoon along with their pump motor set from jarlahi sump and transporting the same to the feeder breaker for necessary repairing and alignment of one 2000gpm EST model pump with 660KW motor at feede
Fabrication of One (01) No. 36 Drum (6x6) Pontoon for 1000 GPM Pump Motor Foundation with Two (02) Nos. 10 Drum (2x5) Pontoons for Operational Movement Near Sump Banks, and Maintenance of the one (01) No. existing 36 Drum Pontoon Supporting Pump Moto
Dismantling and transporting of 4000gpm pump motor set from its existing position to safe place at Jarlahi sump for safety purpose due to heavy rain and transporting of one set of new pontoon from feeder breaker to jarlahi section and fitting of pont
PV-3 PUMP MOTOR SET COMPLETE WITH ELECTRICAL AND MECHANICAL SHITING WATER LEVEL DRAIN UPPER SIDE AT EAST SIDE OF OCP SUMP AND REINSTALLATION AND ITS DELIVERY RANGE 6 INCH DIA APPROX - 452 MTR. DISMANTLING SHIFTING AND RE- I NSTALLATION WMC OCP AKWM
Dewatering (Pumping out water) of slurry pond no.4 and sump of 1201 pump house by mechanical means in order to facilitate removal of slurry from this pond and enable smooth operation of 1201-1 and 1202-2 pump at Moonidih Coal Washery.
Diversion of 6point6KV overhead line to feed power to domestic water supply pump motor set of MOCP Jharna sump for safety of overhead line due to dumping of OB and other miscellaneous electrical works of SOCP patch under Muraidih under AMP Colliery
Dismantling of 3.3KV overhead line at Jarlahi and erection of 3point3 KV overhead line at new Jarlahi sump and extension of 220V overhead line of lighting line at Jarlahi patch and erection of lighting line at Phularitand main patch and shifting of 3
Dismantling laying pipe cutting jointing (Welding) etc of 6 Inch-300 mtr 8 Inch dia-200 mtr 4 Inch- 150 Mtr. Pipeline for shifting of pumps at Main sump firefighting locations and others as and whenever required Under TTK OCP Rajhara Area
Lowering of 4000GPM pump motorset of Jharnaface and Purba face pump and extension of their suction due to gradual decreasing of water level of the sump and other miscellaneous pumping and pipe line work of SOCP and MOCP Patch under AMP Colliery.
Work of 8 inch MS/GI pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 No. Sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
STRINGING, JOINING OF 10 INCH PIPES FOR 4000 GPM PUMP AT WEST SUMP (TO BE JOINED WITH LAKARKA DELIVERY OF 800 GPM PUMP) 150 METER - 25 PIPES AND MANUAL TRANSPORTRATION, PULLING, LOADING, UNLOADING , STACKING OF 8 INCH PIPES EASTSADBHAW TO AMPL VIEWPO
Fabrication of 8 inch 120 and 90 degree M S bend with providing 8 inch table D type flange for laying and maintenance of 8 inch pipeline for dewatering middle sump to out side mines premises w.r,t Konar Exp,BnK Area.
Dismantling and transporting of B/D 4000GPM pump set from main patch to Feeder Breaker for repair and after repair transporting and installation the pump set on the ground level of Jarlahi patch sump with erection of its pipe line at AMP Colliery.
(A) Hoisting burnt submersible pump with cable at VTC borehole and lowering repaired pump with cable (B) Replacing B/D 1000 GPM Turbine pump of river side sump with 2000GPM pump (C) Other misc.jobs related to pumping and pipe line at Muraidih,AMPC.
Dis., trans.,shifting and installation 2000GPM pump in another place of sump, shifting 2000GPM pump in lower side and providing and fitting of 8inch dia NRV, fully maint. 2000GPM pump and other misc. works at Old Ghutway patch 3 of Damoda Colliery.
Lowering of 4000GPM pump motor set of Sadbhavna face for 03times with gradual decreasing of water level of sump and maintenance of the above pump and its pipe line for smooth supply of water to workers colony and nearby village under AMP Colliery.
Erection of chain linked GI wire metal fencing from CIP chowk towards Semer Toli, CIP Chowk towards Churi tola & laying and connecting newly installed boring to nearest sump with GI pipes and fittings for water supply for the campus of CIP Kanke Ranchi
PAINTING OF EXTERNAL SERVICES, MAINT OF DAMAGED BROKEN ROOF SHEET, FLOOR TILE, KOTA STONE AND REPAIR MAINT OF WATER SUPPLY PUMP AND MOTOR, WATER SUPPLY DISTRIBUTION PIPE LINE GI PIPE LINE AND PERIODIC CLEANING OF UG SUMP AND OVERHEAD WATER SUPPLY T
8inch M.S/G.I Pipeline work with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 No. Sump including repairing of old damaged delivery pipelines as when where required as per advancement of mine for FY
(A) Diversion of 220V O/H Line supplying lighting line Power to the abandoned sump of North Tisra Section (B) Diversion of lighting line 220V O/H Line at the departmental Patch D1 of Amal. NT-ST-Kujama Colliery Under Lodna Area.
Water Supply Pipe Line External Work
ITEM SL NO 1, ITEM SL NO 2, ITEM SL NO 3, ITEM SL NO 4, ITEM SL NO 5, ITEM SL NO 6, ITEM SL NO 7, ITEM SL NO 8
Diversion of 6point 6KV overhead line to feeding power to new installed 4000 GPM pump motor set in another side of the SOCP coal face sump and changing of damaged conductors and poles of 440V overhead line of different places and workers coloney of S
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of DG/service van and cutting set for delivery ranges of pump installed at BKB old sump and quarry 2 under Ask OC
1) ERECTION OF 3.3 KV OVER HEAD LINE INSTALLATION OF 3000 GPM PUMP AT AMPL SUMP FOR FIRE FIGHTING OF AMPL COAL DUMP AKWMC,OCP KATRAS AREA.(2) DISMANTLING AND DIVERSION OF 6.6 KV POWER FEEDER FOR PLACEMENT OF ELECTRICAL DRILL AT OCP OF AKWMC
Dismantling of idle 8 inch dia MS pipelines from Pit Office to new sub-station and extension of 6 inch and 8 inch dia MS pipelines at Sump no. 03, Jehlitanr for operation of mine dewatering pumps on pontoon under KDH OCP, NK Area.
Dismantling Shifting of filling point , Laying of 40 mtr 6 inch dia pipeline at kundi mines and Chamatu mines in each same process at two different sites near sump area at water filling point and dust suppression works under Magadh OCP, M- S Area
Laying and fixing two range of 8 inch dia MS/GI pipe for running minimum two nos. of 1000 GPM pump and laying, fixing, dismantling and pipe joint of 8 inch / 6 inch dia pipe in Sump No. 04 under Rohini Project, NK Area
(A) erection of a 10inch dia MS pipeline (5th range) from Jarlahi sump to viewpoint Nalla and (B) shifting of 4000GPM pump motor set from ground level to a drum pontoon and diversion of its pipeline due to extraction of coal of Jarlahi patch, AMPC.
Construction of 1.00 Lakh Gallon having capacity RCC sump near Existing ESR and Connection by 200mm dia MS pipe in Existing 200mm dia DI Pipe at D.W. and S. Sub Division Office Tower Campus RIMS Bariyatu, Ranchi under DW and S Division, Gonda, Ranchi
Dismantling and withdrawal of 2nd 4000GPM pump motor set with drum pontoon set along with its 10inch dia MS Pipe line from Jarlahi patch sump and transporting the same to the F/B for necessary repairing and keep in safe place at Phularitand, AMPC.
Extension of 6.6 KV OHL to feed power in HT pump motor 6.6 KV at west direction of Sump No. 02 of Quarry No. 01 mines and dismantling of 6.6 KV OHL tenancy land at Quarry No. 01 mines under Purnadih Project, NK Area
Different type of work i.e. 2000/4000GPM pump shifting, pipe line shifting and B.D. rectification work at D/L coal face sump and Box cut-III O/S. cutting area, B.D. 4000GPM 10UPH8 pumps dismantling and assembling after repair at RRWS of ABOCP Mine
Lower down and re-installation of 02 Nos.pump motor set (4000 GPM and 2000 GPM) with extension of both delivery range in lower site due to rapidly decreasing of quarry water level at B - Patch sump of Amal.NT-ST-JG Colliery under Lodna Area
Shifting of 2nos of HT 4000gpm pump at upper side of 3rd patch and main patch sump due to increasing of water level shifting of cable during marching of HEMM machine and other miscellaneous pumping and pipe line work at Muraidih under AMP Colliery
(A)Dismantling and transporting 02Nos.4000GPM pump motor set and 10/8inch dia MS Pipes from idle delivery range of coal face sump to attendance room (B) replacing B/D turbine pump motor set of Muraidih river side pump(C)other misc.jobs under AMPC.
Construction of 10 Nos. Retaining wall along 8th WL from Main Dip to 10th Dip of 5 and 5A Inc. for diversion the rain water/seepage water flow through Main Dip of 5 and 5A Inc. to main sump of 31 Inc. at Badjna Colliery.
Work of 8 inch and 6 inch MS/GI pipeline work with dismantling, laying, pipe cutting, jointing, fabrication of bends etc work for pump shifting at coal face as well as 32 No. Sump including repairing of old damaged delivery pipelines under Dakra OCP
Repairing miscellaneous work related to shifting of pump motor set 2000GPM(MnP)/3200GPM with diversion and extension of delivery range 10in/8in dia MS pipe as per new position at Deco main Sump (drag line coal face) of ABOCP mine under Block-II Area
Shifting, diversion, new laying and reorganisation and extension of 6 inch dia and 8 inch dia MS G.I. pipe required for shifting of 1000 GPM and 2000 GPM pump at the Coal Face and main sump in monsoon at DD mines under Bokaro Colliery