Loading…
Loading…
2,254 results • Best match
Diversion of 3point3KV overhead line feeding power to 4000gpm pump motor set at 4th patch due to shifting of pump another side of the sump dismantling of 3point3KV overhead line due to advancement of OB face of 541 shovel and idle overhead line of co
Dewatering (Pumping out water) of slurry pond no. 4 and sump pump of 1201 pump house by mechanical means in order to facilitate removal of slurry from this pond and enable smooth operation of 1201-1 and 1202-2 pumps at Moonidih Coal Washery.
Extension cum Erection of 6.6 KV OHL required for supplying power to DHD Excavators 18211and18212 machines of Sarna Patch at Quarry No. 02 as and when required in next 6 months and dismantling of 6.6 KV OHL of Sump No. 04 (face pump) under Purnadih
Diversion of 1st range of 10/8 inch dia pipe line from Drag line coal face sump to high wall side out sourcing cutting area due to water level increase of mine water and installation of 2000GPM pump of ABOCP Mine under Block-II Area
A) fabrication and commissioning of one (01) PVC drum pontoon for a 1000 GPM pump, along with B) repair of one (01) existing 72-drum pontoon used for a 2000 GPM pump, for deployment in the quarry sump to ensure efficient dewatering during the upcomin
(A) Dismantling of 1000GPM pump from karipani sump west side to karipani main pumping station along with laying reorganisation of 6 dia GI MS pipe line in ro SDOCM. (B) Dismantling lying of 6 dia GI MS pipe line along with shifting installation of 0
Shifting of 4000GPM and 2000 GPM pump motor set in lower side of SOCP coal face sump due to decreasing of water level and assembling installation and commissioning of one 2000 GPM pump motor set on 3rd patch and erection its delivery and assembling i
Dismantling and erection of 3point6KV overhead line to feed power to 4000gpm pump motor set and marian shovel due to shifting of existing pump motor set in another safe side of the sump and advancement of SOCP OB face under Muraidih under AMP Collier
REP CLEANING OF WS OH WATER TK SEMI UG SUMP AND CHEMICAL DOSING EQPT AND CERTAIN CONNECTED WK AT NAMKUM KHOJATOLI AND REPL REP OF DAMAGE AND BROKEN ASBESTOR ROOF SHEETS WITH GALVALUME SHEETS AND ASSOCIATED WK AT VEER LINE AND REZANGLA LINE GE RANCHI
Erection of Two (02) new 3.3 KV O/H line Feeder from K.T.Jeenagora to the abandoned water sump at Jeenagora Mines covering an Approx. length of (6450 Mtrs/2541.300 Kgs) to maintain an uninterrupted water supply of Amal. NT-ST-JG Colliery under Lodna
Shifting of 4000gpm pump motor set from the damaged drum pontoon to ground level of the sump of 3rd patch and transporting the damaged drum pontoon set to feeder breaker for repairing and shifting of another 4000gpm pump motor set with box pontoon se
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of DG/service van and cutting set for delivery ranges of pumps installed at BKB old sump and Quarry 2 under As
Erection of HT OH 3.3 KV OH lines in order to separate 02 nos. pumps of main sump from 1.6 MVA field feeders to 2.5 MVA Field feeders including the dismantling of 5 spans in the 2.5 MVA feeders at JOCP under Hzb Area.
Reorganization of 3.3kV HT both overhead feeders near EKG shovels to supply one shovel from the 1.6 MVA feeder for load optimization, along with erection of two OH line spans near the eastern sump to power a 2000 GPM pump-motor set and dismantling of
Transporting assembling and installation of one set of drum pontoon set in MOCP Jharna face sump and shifting of a 4000gpm pump motor set from ground level to the pontoon and transporting and installation of a 2000gpm pump motor set on east side of 3
Erection of 20 span N dismantling of 10 span 220 V phase to phase lighting line in mine premises to illuminate haul road, working place of HEMM, Sump area, OB dumping area, installation of 10 KVA Transformer, 11 KV grade GOAB switch at Tapin North
Rearrangement in 220 V lighting line in mine premises to illuminate haul road working place of HEMM Sump area and OB dumping area installation of 10 KVA Transformer 11 KV grade GOAB switch and Horn Gap Fuse at Tapin North OCP under Hazaribagh Area.
Shifting of 2000 GPM and 4000 GPM pump 200 Mtr head in the lower side of coal face sump along with diversion and extension of 10/8in dia delivery range from Deco middle coal face to Box cut-III top bench of ABOCP mine
(1) Jointing/ Welding of 8IN pipes 160 Pc. jointed long pipes 120 Pc. of 02 nos /03 nos/04nos AND 80 Pc. flanges welding for use in 5th AND 6th new delivery ranges for dewatering of main sump of AMPL patch 2. Jointing/welding
(A)Lowering of 4000 GPM pump motor set of Jarlahi sump and diversion its pipe line (B) Replacing B/D 4000 GPM pump motor set of Drum pontoon (C) Leakage repairing in 6inch dia MS pipe line supplying water to Phularitand workers colony under AMPC.
(A)Welding of flange in 10inch dia M.S. Pipe, fabrication of 10inch and 8inch dia bend, short piece and tapper pipes (b) extension of delivery of two 4000GPM pump installed on the pontoon at Jarlahi patch sump and maintenance of above pump at AMPC.
Transporting and installation of HT 2000GPM Pump, motor set at old Ghutway patch-3 and 02times shifting of HT2000GPM pump, motor set in the lower side of the sump and other misc.pumping and pipe line works at Old Ghutway Patch-3 of Damoda Colliery.
REP CLEANING OF WS OH WATER TK SEMI UG SUMP AND CHEMICAL DOSING EQPT AND CERTAIN CONNECTED WK AT NAMKUM KHOJATOLI AND REPL REP OF DAMAGE AND BROKEN ASBESTOR ROOF SHEETS WITH GALVALUME SHEETS AND ASSOCIATED WK AT VEER LINE AND REZANGLE LINE GE RANCHI
Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 GPM each to run in the Main sump and Repairing, painting of Base frame and starter Shed for quick dewatering in the upcoming monsoon 2025-26
Complete repairing/overhauling of Agitator over floculator tank by cleaning of water tank at CPP, Moonidih,W.J.A
Construction of PCC Road from Water Tank to Bargarha At Village Pahad Tudurma At Village Pahad Tudurma
Water supply pipe line external work
Special Repair to Fresh Group Bldg T 29 at 48 I SUP PL ASC Provn of shed at Furniture Yard Provn of Parking space for Clerk Staff near Bldg No P 530 at Stn HQ Provn of Parking shed Near T 16 ICU at MH and Spl Repair of Static Water Tank of 500 KL C
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others
Annual Maintenance service-AIR CONDITIONER
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Others
Annual Maintenance service-AIR CONDITIONER
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Part- I 1. Both side of water tank opening, cleaning repairing of radiator. 2. All tubes of radiator cleaning by gagging with HCL acid, K. oil. Part- II 1. Top and Bottom water tank opening and refitting. 2. All tubes cleaning by gagging.
Repairing fabrication of Water Tank leakage proof plate changing of BRY 3178 Water Tanker of Dhori (K) Colliery
Erection of 8 inch, 6 inch dia and 4 inch dia pipe line of firefighting from 6 no sump to active fire point in view of engaging of shovel and road making for coal production for a period of 90 days wrt AADOCM of Dhori Area.
(A) One new 4 inch dia MS pipe Line Laying of 4 inch dia approx.780 Mtrs domestic water supply to Tilaya bani basti from 9 No.Siding(B) Diversion of existing 6 inch dia pipeline range from sump through a different route approx.1 KM with installation
Erection of 3.3 Kv overhead line about 350 mtr from Kopa to Out Source sump mine main road junction and partial rearrangement of existing line for supply of 3.3 kv power from 3 MVA, 11/3.3 KV MINE CKT for mine dewatering purpose, kabribad Mine, GRD
(a) Making an arrangement to deal with spontaneous heating of coal stock No. 42 an 47 (b) Laying one range of pipe line from the sump of departmental working area to the departmental coal stock (c) Re-arrangement of part of 290 Meter..... at Ashok OC
Lowering and Re-installation at new place 4000 GPM 1 No.Pump - Motor set with extension of delivery range in lower site 10 inch dia 8 Nos.of pipes due to decreasing of quarry water level at B - Patch sump of Amal.NT-ST-JG Colliery under Lodna Area
Cleaning of Jungle near check post near Old substation and Cleaning of Jungle , garbage drain of Workshop KDH OCP and Bush cutting on both side of road from new substation to pit office KDH Patch and Cleaning of drain near main sump of KDH Mine and
Lowering of three 4000gpm pump motor set of Jharna face sump and extension of 3rd range of Jharna face from purba face to Khodo river and replacing of BD 2000gpm pump motor set of Muraidih river side with a turbine pump and other maintenance of domes
Re-handling of spilled coal/slime from 4 to 9 no. bunker of A side and 4 to 9 no. bunker of B side including sump near exhaust fan of Pre-washery section and rehandling of power coal surrounding bunker where electrical cables are passing at KW
PART-A shifting of two number pumps of 1000 GPM, Make - kirloskar oil engines Itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Dismantling and transporting from B Patch NT-ST and re-joining at Kujama Quarry G Patch to Chatkari Jore(Approx 580 Mtrs)full length pipes 10 Nos bends and 18 Nos. short piece pipe and installation of 2000 GPM pump set for dewatering of sump water
Dismantling of the 8 inch dia MS pipe range No1 and 8inch dia MS pipe range No2 from the south east drain side and shifting of the ranges towards the Khatalpatti sump and installation of the 8by8 DME 2000 GPM pump motor set with electrical and 4000GP
(1) (A) 120 HP PUMP MOTOR BED PLATE DISMANTLING AND TRANSPORTING FROM NO.2 PIT SUMP TO K.C.C OFFICE CAMPUS AND STOKING .(B) FABRICATION OF 01 BED PLATE FOR 65 HP PUMP SET AT W.T.P AGKCC.and (2) LIFTING AND LOWERING OF 175 HP SUBMERSIBLE PUMP MOTOR SE
Dismantling of 10inch dia and 8inch dia MS pipe from SOCP old coal face range and 3rd patch old range and transporting of SOCP attendance room premises for necessary repairing and erection of one 10inch by 8inch dia MS pipe line from 4th patch sump t
Erection of 10inch 8inch MS pipe line from MOCP coal face sump to chitahi road for discharge mine water to chitahi nalla by jointing the proposed range with the existing delivery and installation of 6point 6 KV 4000 GPM pump on the ground level of MO