Loading…
Loading…
2,254 results • Best match
Laying of one no. of pipe range of 6 inch dia in 9 no. sump.
(Job 1.) Relocation of 2 span 6.6 KV OHTL by dismantling of 2 span and erection of 3 span power line of Ganga pump at Quarry -1 (Job 2.) Erection of second feeder, 4 spans, 3.3 KV O/H Line from site of TSS 4205 to Quarry-1 Sump of PPR Patch (Route
Water supply pipe line, external work
Seal Kit Lift Cylinder, Seal Kit Till Cylinder, Lubricating Oil Filter, Hose Sump to Pump, Hose
Fencing around the transformer near RKS talab and sump no.04 in Respect of Rohini project.
Shifting of two nos. 1000 GPM pump in sump no. 01 in respect of Rohini Project.
Construction / maintenance of buildings
Shifting and re-organisation of three ranges from 5 no. to 4 no. sump area in AADOCM
Construction of 10 nos tank foundations and associated work for placingof water tank for contingent arrangement of firefighting system for Main and Extended CHP.
1) Top and Bottom water tank opening and refitting. 2) All tubes cleaning by gagging with Hcl Acid 3) Leakage tube repairing. 4) Testing.
1) Top and Bottom water tank opening and refitting. 2) All tubes cleaning by gagging with Hcl Acid 3) Leakage tube repairing. 4) Testing.
1) Top and Bottom water tank opening and refitting. 2) All tubes cleaning by gagging with Hcl Acid 3) Leakage tube repairing. 4) Testing.
For cutting, dismantling and transporting of an old and damaged water tank structure fabrication by iron steel materials at 10 pit of Loyabad Colliery.
Erection and Dismantle of Tubular Poles and lights for illumination purpose at sump no.-04 under Rohini Project.
C/o IIIT campus at Sanga Village Kanke, Ranchi Phase-I SH: C/o Academic Building (G 5), Administrative Building (LG G 2), Boys Hostel (G 5), Girls Hostel (G 2), Director Residence (G 1), Registrar Residence (G 1), Faculty Residence (G 2), Electrical ... Fans, Overhead Tank , ...
Rearrangement of 6 inch and 4 inch pipeline in old Sump for monsoon preparation at TSOCP under Hazaribagh area
Shifting of 1000 GPM Slurry Pump to deepest coal face in sump no.-01 in Respect of Rohini project.
Shifting of 1000 GPM slurry pump including erection of pipeline in sump no. 01 in respect of Rohini Project.
C/o IIIT Campus at Sanga, Village, Kanke, Ranchi(Phase-I)(SH:C/o Academic Building (G 5), Administrative Building (LG G 2), Boys Hostel (G 5), Girls Hostel (G 2), Director Residence (G 1), Registrar Residence (G 1), Faculty Residence (G 2), ... Fans, Overhead Tank , ...
C/o of IIIT Campus at Sanga Village kanke, Ranchi (Phase-I). (SH: C/o Academic building (G to 5), Administrative building (LG plus G plus 2), boys hostel (G plus 5), girls Hostel (G plus 2) , director residence (G plus 1), registrar residence (G plus ... Fans, Overhead tank , ...
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; 110; 2
Laying, erection of one no of pipe-range of 8 inch dia from 9 no main sump to Joriya Nallah.
Second shifting of all three pumps including associated pipe line with accessories at departmental sump of Kabribad Mie, GRD Project
Laying, fitting of 8 inch, 6 inch MS, GI pipe at 3P sump area of SDOCM for dewatering in SDOCM.
Providing and fixing 30 (Thirty)Nos. of PVC water storage Tank at different quarters of Moonidih, Township, Moonidih Officers Club etc. under WJ Area
Shifting of 1000 GPM DSW-6 pump to deepest coal face area in sump no.-01 in respect of Rohini Project.
Dismantling laying and extension of 6 inch and 8 inch dia pipes at 4-5 no. sump under AADOCM, Dhori area
1- Both of Water tank opening, cleaning repairing of Radiator 2- All Tubes of Radiator cleaning by gagging with Hcl Acid, K. Oil 3- New Steam joint changing.
1- Both of Water tank opening, cleaning repairing of Radiator 2- All Tubes of Radiator cleaning by gagging with Hcl Acid, K. Oil 3- New Steam joint changing.
Development and Bulk Services for CTC ITBP Campus village Banjirka and Bera Pass Tehsil Ramgarh Alwar Raj Internal road cross drainage and storm water drain along the road including Co 3 Nos STP Sewer line water supply line tube well and under ground ... ground sump and ...
Water Supply Pipe Line external work
1. Both side of water tank opening, cleaning and repairing of radiator. 2. All tubes of radiator cleaning by gagging with acid, K oil. 3. New stream joint changing.
For Trench cutting 6 inch MS Pipe grounding, laying etc. from Loyabad 5 pit to R/S Loyabad and samp (water tank) collection etc. of LBC under Sijua Area
Repairing of 160kVA, 3.3kV/440V transformer, make-Hiredustom Power Transformer, SL. NO.-10823 installed at Sump-04 in respect of Rohini Project.
Extension of 3.3 kV OH line for power feeding to 900 GPM pump at sump no.-01 in respect of Rohini Project.
Extension of pipeline 6 inch dia pipe and installation of 1000 GPM pump in sump no-01 in respect of Rohini Project
Repairing/Reconditioning of DOL starter 440 V SL No. RH/EnM/02 installed at sump no. 01 in respect of Rohini Project.
Erection of 3.3 kV OH line for power feeding to 1000 GPM pump at sump no.- 01 in respect of Rohini Project.
Making of 02 set. of gun metal bush bearing for 01 no.of 1000GPM pump installed at 3P sump in respect of SDOCM.
1. Top and bottom water tank opening and refitting by soldering of radiator . 2. All Tubes cleaning by gagging with HCL acid of radiator. 3. Damaged tube repairing of radiator.
Maintenance of the area of sump and drain along the path of C16/17 belt conveyor in all three shifts at RJML CHP
Re-arrangement of Lighting Line with supply and fixing of LED Fixture from filling point to intermediate Sump and deep Mining Pump House.
Maintenance of the area of sump and drain along the path of C16/17 belt conveyor in all three shifts at RJML CHP
Repair and maintenance of sump pumps and maintenance zone of plough feeder in Ground bunker tunnel in all three shifts at RJML CHP
Laying and Fixing of second delivery line of 110 meter length for 1000 GPM pump in Sump-04 in respect of Rohini Project.
Repairing of N.R. and Sluice Valve of installed in delivery line of pumps in Sump-01 in respect of Rohini Project, NK Area.
Repair and maintenance of sump pumps and maintenance zone of plough feeder in Ground bunker tunnel in all three shifts at RJML CHP
construction of A type (two section) school building (G plus 2) 4 Nos.T-II qtrs (Gplus 1) 01 no T- V qtrs canteen elec substation pump room ug sump boundary walls along with gates and guard room ic w supply s.i drainage for Kendriya Vidyala at ... ug sump boundary ...
ALTERNATOR ASSEMBLY, CLUTCH RELEASE BEARING, SPEEDOMETER CABLE, ASSEMBLY AUXILIARY WATER TANK, COIL IGNITION, WIPER BLADE, RAM ASSEMBLY, CLUTCH MASTER CYLINDER ASSEMBLY, REPAIR KIT BRAKE CHAMBER, WATER PUMP, ACTUATOR SPRING BRAKE, PLUNGER DETENT
Erection and dismantling of 3.3kV OH line for power feeding to 1000 GPM pump at sump no. 04 in respect of Rohini Project, N.K Area.