Loading…
Loading…
2,254 results • Best match
Work of 8 inch dia MS/GI pipe with dismantling, laying, fixing, pipe cutting and joint bend making etc work with providing reqd spares from 32 No. sump to Dhupgada Nala for operation of 2000 GPM Pump (Approx length 750 M) under Dakra Project,NK Area
Lowering of 02nos of HT 4000gpm pump of Muraidih Jharna sump due to decreasing of water level and diversion of 10inch by 8inch dia MS pipe line of 4000gpm pump supplying water to SOCP filter plant near view point due to safety purpose of Muraidih und
A)Fabrication of bed plate structure for operation of 2000 GPM, Make- Flowmore pump at face sump under Dakra Project. B) Providing and fixing of CI N.R Valve 8 INC Dia for installation of 2000 GPM flowmore pump at coal face under Dakra Project C)Prov
A. Erection of 3.3 kV OH Electric Line from KSML camp to dept. sump of Konar Exp. OCP, BnK Area, (BOQ 1-15) B. Establishing Complete Earth continuity of Mines and installing Switchgears along With AB switch for operation of 3 nos of 3.3 KV 2000GPM Mo
A. re-organization/Extention of 8inch dia pipelines for shifting of 1000 GPM pump at new location for dewatering of Mines Sump to outside of the Mine (BOQ 1-13), B. laying of 8inch dia pipelines and installation of one 2000GPM pump at new location f
Welding of flange on 6 inch dia meter pipe, transporting of pipe from surface to u/g and laying, installation and jointing of 6 inch diameter of length 300m M.S pipe line from 2 WL 2dip sump to 6EL 2 Dip of Kharkharee Colliery, under Govindpur Area
Day-to-day repair-maintenance of 3.3kV OHTL by dismantling, erection, extension for supplying power to Shovel No. 03, 05 and pump at 32 No. sump for a period of 06 months as and when required as per advancement of mines under Dakra OCP, NK Area.
Refixing of pipeline of 6inch dia of Water Tanker Point with del. pipeline 2000GPM at dis. point with 10in. dia Sluice valve at Jehlitand and lay. and fix. of 10in.,8in. and 6in. dia for starting of pumps at Coal face sump at Jehlitand mine under KDH
Dismantling and withdrawal of 02 nos of 4000GPM pump motor set from the damaged pontoon and installation on the ground level of SOCP coal face sump and shifting of 4000GPM pump of 3rd patch and diversion of its pipe line due to dumping of OB and main
A.Re-organisation of pipeline with shifting of two nos. of 2000GPM pumps six times for dewatering near CREW patch Sump to outside of the Mine (BOQ 1-13), B. Repair and maint of 8inch dia pipeline and shifting of 2000 GPM pump three times at CREW min
1) Lowering and shifting of 4000 GPM and 2000 GPM pump alongwith delivery and suction 2) Suction extension 4000 GPM, 2000 GPM coal sump and 2000 GPM C-patch two times 3) Assembly of 2nd 4000 GPM 10UPH8 pump at RRWS stand of tanker fitting point etc
Shifting, diversion cum extension of 6 inch dia G.I. pipes required for shifting of 500 G.P.M. Pump and 1000 GPM pump at the Coal Face and main sump, due to displacement of water accumulation area and dismantling of one range 6inch and 4 inch dia pip
Shifting of HT 2000 GPM Pump motor set 02 times in another side of the sump along with diversion of its 8 inch dia MS pipe line due to advancement of mining activity and other miscellaneous mechanical works at Old Ghutway Patch-3 of Damoda Colliery.
shifting of 2nd pump of 1000 GPM, Make - Kirloskar oil engines Itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also Laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Providing and fixing of lightening arrestor for 3.3kv OHTL at start point and end point in pump feeder and preparation of 05 Nos. of earth pit at 32 No. Sump for grounding two nos. of Motor and Starter and lightening arrestor under Dakra OCP, NK Area
a) Realignment/extension of 14 inch dia ms pipe line from Lalghutwa sump to Lalmatia filter plant for installation of main pump for dewatering sump in Lohandia patch in Rajmahal OCP
Construction of IIIT campus at sanga village kanke ranchi phase I SH academic building administrative building boys hostel girls hostel director residence registrar residence faculty residence electrical sub station internal water supply sanitary ... fans overhead tank sewage ...
C/o IIIT Campus at Sanga Village Kanke, Ranchi (Phase-I) (SH: C/o Academic Building , Administrative Building , Boys Hostle , Girls Hostel , Director Residence , Faculty Residence , Electrical Sub-Station i/c Internal Water supply, Sanitary ... Fans, overhead Tank , ...
Repairing of FIP pump and gear box overhauling water tank No BHG 1040 at Kankanee Colliery under Sijua Area.
For damaged water Tank No. 01 and 02 to be repair (CISF W/T) at SAW under Sijua Area
A) Laying of 8 inch dia 200Mtr. MS pipe line at Sump and 3inch dia GI pipe 400 Mtr. to deal with spontaneous heating of Coal at Coal Stock no.26 and internal coal stock and B Repairing and dismantling of pipeline at another location under Ashok Proje
Work of Pipeline delivery ranges for inst. of pumps at Sarna patch, face and at Sump No. 02 and laying, extn and dismant of pipelines at Coal Stock No. 3,7 and 9 for firefighting purpose and dismantling of old range near crusher at QNo.1 at PND OCP
(A) laying and jointing of 8in dia New pipe line from middle coal face ABOCP to Box cut-III Sump near rail line through east high wall side. (B) shifting of 10UPH8 4000 GPM 2000 Mtr and 2000 GPM pump motor set along with delivery and suction at Deco
Work dismantling of 10 inch dia and 8 inch dia existing pipeline each of 200 mtr with required earth work and laying 10 inch dia and 8 inch dia pipeline each of length 50 Mtr. For shifting of pump to another location at quarry - 2 sump under Ashok OC
Different types of pumping and pipe line wok lowering of 4000GPM pump of SOCP and MOCP coal face sump replacing of BD 4000GPM pump and BD 2000GPM MS pipe line on the top bench of MOCP coal face extension of 6inch dia MS pipe line near CISF check post
Transporting assembling and installation of one set of box pontoon and one set of drum pontoon set from MOCP pumping face to 3rd patch sump and shifting of 2 nos of 4000gpm pump of 3rd patch from ground level to the pontoon and lowering of 2nos of 20
(A) Dismantling of 3 ranges, 1100 Mtr length each 8 inch dia pipeline from Quarry 2 to Quarry 1 Piparwar patch (B) Laying of 02 ranges of 8 inch dia pipeline each of approx. length 1350 Mtr from sump at Quarry No. 2 to Mangardaha Nalla under Ashok OC
Laying of 3 Nos. of 10 inch dia pipeline of approx. 900 Mtr. Length (Each) and laying of 1 No. 8 inch dia pipeline of approx. 900 Mtr. from proposed Sump to the connecting Nalla of RITES and dismantling of existing 03 Nos. of pipeline of 900 Mtr.
Providing and welding of 8inch dia MS flanges in 8inch dia MS pipe and fabrication and making of MS bend and MS tapper pipe for the further erection of pipe range and shifting of 2000gpm pump motor set in lower side of the sump due to decreasing of w
Carrying laying and joining of 6 inch dia MS Pipe. A delivery range of Kujama Quarry sump to G-Patch (Approx.-1200 Mtrs) full length pipes 200 Nos. Bends 14 Nos. and Short piece pipe 10 Nos. and installation of 1000 GPM pump set for dewatering work o
Erection of 6.6 KV D/L Feeder dismantling of 6.6 KV D/L feeder clear the area for OB dumping power supply shovel and 4000 GPM pump JOCP Patch B) Dismantling repairing Erection of 220 V L.T Line clear the area OB dumping lighting main sump 4000 GPM
Repairing of 2 nos. Induction motors. A. 110KW, 3.3KV, 1490RPM, Marathon make induction motor installed at Karipani main sump B. 160KW, 3.3KV, 1485RPM, Marathon make induction motor installed at Karipani main sump of SDOCM.
C/o IIIT campus at Sanga Village Kanke, Ranchi(Phase-I) (SH: C/o Academic Building (G to 3), Administrative Building (LG G 2), Boys Hostel(G 1), Faculty Residence (G 2), Electrical Sub-station i/c Internal Water Supply, Sanitary Installation, ... Fans, Overhead Tank , ...
Repairing/replacement of damage pipe line including pump set from Crusher pit-3 to main water tank at Rajmahal CHP
Renovation ladies and gents water closet, septic tank and water tank at SLG siding at South Govindpur under Govindpur Area
Unloading of 1000 GPM pump set with electrical from south side of sump at Patch A to north side sump and installing these with loading, transporting, unloading, laying and fitting of pipeline at Tarmi OCP.
C/o IIIT Campus at Sanga, Village , kanke, Ranchi(Phase-I). (SH: C/o Academic building , Administrative Building , Boys Hostel, Girls Hostel, Director Residence, Registrar Residence, Faculty Residence, Electrical Sub-Station i/c Internal water ... Fans, overhead Tank , ...
Diversion of existing pipe line size 8 inch and 6inch for de-watering from the middle sump of GVP Ph-II OCP. Work to be done for pipe line dismantle of both side of existing and lying the same for the proposed pipe line for de-watering of GVP Ph-II
(PART-A) 1000 GPM pump, Make - kirloskar oil engines Itd. from one place to other place within 30 meters radius with 6 inch dia. 24 mtrs. welding near delivery side of pump, due to decreased water level at CS-34 sump and new pipes of 6 inch dia. 70 m
Daytoday rep. and main. of 3.3 kv OHTL by dismant, ere, ext, branch ext and repositioning of pole and 3.3 kv OHTL for supplying power to Shovel No. 03and05 and pump at 32 No. Sump as and when required as per the adv of mine during the f.y. 2021-22
(1) Re-erection of 14 span 440v OH lighting line at departmental dumping near coal stock G-11 (2) Relocation of 7 span 230v OH lighting line along Q-2 main sump and (3) Extension of 5 span 230v OH lighting line in OB dumping of PPR patch under Ashok
Shifting of 02 nos of 4000GPM pump of MOCP pumping face and 01 nos of 4000GPM pump of SOCP coal face sump and diversion of its pipe line for floor coal extraction replacing of 02 nos of BD HT pump of MOCP pumping face 4000GPM pump of 3rd patch and 40
Supply and fixing of 3/41/2 GI pipe 3/4 and 1/2union socket 1/2 socket and 3/4 and 1/2 wheel valve etc for completing cooling system of KBL make pump model MLA discharge 300 cubic metre/hour head 240 mtr. running at Jehlitand sump under KDH
Provn of 04 x Toilet Block for Covid Wards for Covid 19 patients consisting of 02 x WCM 02 x IWC algongwith OHT Separate Soakage Well with Geyser facilities between T22 and T23 Covid Ward V and VI and near Bldg No T 31 Covid 19 Isolation Ward Dhobi
Any Civil Work
Diversion of 8 inch dia MS pipeline for road crossing near Bhawanipur Sump and erection of a filling point at Girja Sump by laying and joining 6 inch MS pipe under Chitra Colliery SP Mines Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Pipelines, Erection Realignment of different pipeline pump situated in Lohandia Sump and deep mine sump of Rajmahal OCP pumping plan by pass the intermediat..
1. Top and Bottom water tank opening and refitting. 2. All tubes cleaning by gagging. 3. Leakage tube repairing. 4. Testing.
1) Top and Bottom water tank opening and refitting. 2) All tubes cleaning by gagging. 3) Leakage tube repairing. 4) Testing
Renovation shed at quarter guard, water tank and different civil work at newly shifted CISF barrack at NAKC under Govindpur Area