Loading…
Loading…
2,584 results • Best match
SUPPLY and LAYING NEW DISTRIBUTION LINES AND PROVIDING FHTCS IN ZONE VII (GLSR FROM KANAMALA), ZONE VII(a) (BP Tank at Kanamala), Construction of 0.55 L Ltr BP tank at Kanamala_Pipeline Work
JJM WSS toDevikulam and Chinnakanal Panchayath iIdukki District Supply and Laying Gravity Mains Construction of GLSR at various zones Providing Distribution System and Providing FHTC to various zones Seetha Devi LakeZonePackage IIGeneralCivilwork
The items included in this estimate are patch plastering , painting, multi wood for cupboard, FRP shutters, , I sheet roof, PVC water tank, etc
Annual Plan-Atholi GP 2023-2024 Demolishing water tank in panchayath office and installation of new tank-Pro.No.342/24- General Civil Work
Annual Plan-Pulpally GP-2025-26-Proj.no.250 Construction of water tank pipe line and motor for various drinking water project in panchayath
Construction of ESIC dispensary, RDD Office (North zone), SRO Office and sub store in RCC framed structure (G plus 3 and basement) including Internal Water supply, Sanitary Installations, UG sump for general purposes, fire fighting and rain water harvesting, septic tank, compound wall with gates and storm water drains etc. at Chalappuram, Kozhikode, Kerala.
JJM WSS to Chakkupallam Vandanmedu Karunapuram and Vandiperiyar Panchayats in Idukki District Construction of 5.6 LL sump pump house at 3rd mile 11.1 LL sump pump house at Market Supply laying of CWPM to 3rd mile and Market -Package -5-Genera
Maintanance of Well and Toilet
PWD WORKS
civil work
Refer tender document
TANK STAND
Providing FHTC to Thariyode Grama Panchayath (WTP sump) by Laying new Distribution system - Zone 2 and 3
AMRUT 2016-17- Construction of 17LL OHSR and 2.5LL SUMP at Pachalam Electrification work General Electrical Work
Block A Classroom Block, Sump tank, Septic tank for 50 users, external water supply and Electrical works
Construction of Academic block 1, RCC Retaining wall, Sump and External water supply, Septic tank, Electrical works
Academic Block 1, Auditorium Block, Compound wall, Sump tank, Septic tank, external water supply and Electrical works
Civil station kasaragod--REPAIR OF EXG. SUMP TANK PIPE LINE CONNECTION AND OTHER MAINTENANCE WORKS-Composite Work
HS Academic Block 2- New construction, Compound wall, Sump, Septic Tank, External water supply and Electrical works
Clearing jungle, cleaning of sump and tank,fixing drainage top grill and providing roof for waste pit
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
State plan 2018-19 RWSS to Aryancodu Chemboor Chilambarareplacement of 300 mm AC Distribution line from Nedinjikunnu GLSR to Mylachal road for a length of 425 meter using 300 mm DI K9 pipe
Jal Jeevan Mission (JJM)-(2021-2024) Phase11- ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages- -Design, Supply, Erection and commissioning of Pump sets in Raw water Pump House at Karapuzha and to Arivayal GLSR
Jal Jeevan Mission (JJM)-Kannur District-Mayyil Panchayath - WSS to kolachery and adjoining panchayaths - Phase III - Reappropriation work - Laying Distribution System and providing FHTCs, Construction of 14LL GLSR tank at Padikunnu. -Pipeline Work
(1)Supply and laying of DI transmission main from the Vettipparambu (2)Construction of OHSR and GLSR (3)Distribution networks in the Thidanadu Panchayath and Providing FHTCs (4) Pumpsets, (5) Road Restoration etc.
Construction of IT Building (Phase-2) in SEZ at KINFRA Film and Video Park, Kazhkuttom including Internal Electrical Installations, External Services, Roads, Rain water Harvesting, UG Sump, OH Tank, Drains, Pump Room, Substation, DG Set, FireFighting System, Automatic Fire Alarm System, Lift, HVAC, Grid Interactive Solar PV power Generation System etc. SH. Providing Office Assistance. Subwork/Packages: Single
The items included in this estimate are compound wall plastering dimantling floor PCC floor tile plastering EWC FRP door frame FRP shutter water tank
The components of the detailed estimate mainly include the construction of the RCC well, water tank, pump room, check dam and side protection works.
Construction of ESIC Dispensary , RDD Office ( North Zone) ,SRO Office and Sub store including internal water supply, Sanitary installations, UG Sump for General Purposes, Fire Fighjting & rain water harvesting, Septic tank, Compound wall with gates and Storm water drains etc. at Chalappuram, Kozhikode, Kerala .SH: Providing services of skilled staff under Calicut Electrical Division, CPWD, Calicut
Construction of the 760 Capacity New Girls Hostel for NIT Kozhikode including internal SI,WS,Drainage, UG sump, IEI,UPS, Lifts, Firefighting with down comer system, manual fire alarm system, ongrid solar PV system, Solar water heating system, CCTV,Networking system and 150 KLD modular STP etc. SH: Providing services of Skilled staff under Calicut Electrical Division, CPWD, Calicut.
Construction of new building, Sump tank, Septic tank, internal and external water supply, sanitary works and Electrical works.
Deposit work-WSS to PTM Govt.College Hostel -Laying distribution from OH Tank Pathaikkara to Sump at Hostel compound
LAC ADS Providing dedicated line to Govt.College Nadapuram-Laying pipe line,Construction of sump and providing water connection
Deposit work of Goivt Secretariat providing water connection to fire station sump near North block inside Government Secretariat
Construction of 15 LL Capacity O.H.S.R at Iritty H.S. Gravity Main from GLSR at Chavasseryparamba to Iritty H.S.S,Supplying and Laying Pumping Main to Manjakunnu , Construction of 3L.L G.L.S.R at Manjakunnu and Road reformation
AS PER BOQ AND TENDER DOCUMENTS
Refer tender document
Others
In this estimate items such as mobilization of all necessary plant and equipment, setting up of boring ring, boring with power rotary drilling equipment for all type of soil, rock etc. including
DRAIN
Civil works
Civil works
The construction of platform for water tank (7 m height) and laying of distribution line (using 63 mm 6kgf/cm2) is proposed in this project.
The items included in this estimste are PCC,Random rubble masonary,solid block work,Rcc belt,GI tube work,plastering,providing SS water tank etc
(1)Supply laying of 200 or 150mm DI transmission main from the GLSR at Kayoor, (2) Construction of GLSRs at Athirupara,Peruppara, (3) Distribution networks in the Thalappalam panchayath for the 597 nos of FHTCs.
Construction of Intake well cum pump house, Raw Water Pumping main, 10MLD treatment plant ,Clear Water Pumping mains,10 LL OHSR-2Nos., 9.0LL OHSR, 10000L GLSR-2Nos.,Raw water and clear water pump sets, Transformers