Loading…
Loading…
752 results • Best match
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Basuapada of Erada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Gobindabindha of Aruha G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Mulagaon of Betada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Langudi of Haripur G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Lunia of Khaparpada G.P under Dhamnagar Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kiapada of Arandua G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kantada of Padhani G.P under Dhamnagar Block
Repair and Renovation of 03 nos. Qtrs in 01 block and Repair and Renovation of water supply Pipe line upto cow sheds and boring of tube well near OHT at CCBF,chiplima,Sambalpur
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Uteipur of Anandapur G.P under Dhamnagar Block
Up keeping of VGS, Indoor Plants and Central Garden for a period of 2 years through deployment of skilled manpower (Gardener) and also the water arrangement for plants by laying down pipe network and placing up roof top water tank in GM office, Kanih
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles for 3 years (341 running days in each year) for Bharatpur OCP, Bharatpur Area.
Fabrication and supply of 09 nos. steel stand 3.0 mtr high for installation of Fog canon- 100mtr throw and 04 nos. of steel stand 4 mtr high for plastic water tank 2000 ltr for dust suppression at different location of Kulda OCP Basundhara Area
Custom Bid for Services - Hiring of one 01 no of 10 wheel truck chassis mounted mist blower fog cannon along with min 25 KVA DG Set and min 12 KL Water Tank and suitable no of nozzles on monthly basis for Dulanga Coal Mining Project
Set of Purg-O-Mat Automatic float air vent valve with shut-off Valve having Thread BSP 3/8" = Qty-1 No. and Vacuum Valve G-1/2" = Qty-2 Nos. for roof water tank to RCF Drg No. LW 63150, Alt-e. Item N
Set of Air Vent Valve for Roof Water Tank and Vacuum Valve (1) Air Vent Valve to RCF Drg. No. LW63150 Alt-e, Item No. 4, Qty/Kit-01 No. (2) Vacuum Valve G-1/2" to RCF Drg. No. LW63150 Alt-e, Item No
Design, Supply, Fabrication, Erection, Testing and Commissioning of 3x600 MT Mounded Type Pressure Vessels for LPG storage and 3 nosx18M Dia x 13.5M High Cone roof vertical tanks for fire water storage at LPG Bottling Plant Project
Civil Work
Implementation of 24x7 water supply-under Sujala at Kharavela Nagar area in Ward No.41 of BMC, Bhubaneswar (Connection of the sump with the rising mains of Palasuni and Naraj Source and inside H.L. Tank)
Retrofitting of Rural Piped Water Supply Scheme to Village Banitia including laying of distribution pipe line construction of pump house boundary wall OHT and Internal Electrification etc of Banitia G P under Bhadrak Block
Retrofitting of Rural Piped WaterSupply Scheme toVillage Bhagabanpur including laying of pipe line construction of pump house, boundary wal OHT and Internal Electrification and commissioning of Pump and Motor of Bhagabanpur G.P underDhamnagar Block
Dismantling, laying and jointing of 10 inch dia, 8 inch dia and 6 inch dia jetting hose and shifting of HT and LT pontoon inside mine sump at Hingula OCP for a period of one year.
Compound wall heightening, plaster, color, repair of gate, repair of W.B. room, electrification and repair of office building (Old), costn of fire hydrant sump, security room, costn of QC room, costn of labourshed at SWC Dumerpani
Constn of fire hydrant sump, security room, barbed wire fencing and electrification work, repair of w.b. room, compound wall painting, repair of floor, verandah, shutter, ventilator, office grading, plastering, godown painting work at SWC A-Katapali
M3248950000, M3249890000, M3253790000, M3253440000, M3253800006, M3253800007, M3253800008, M3253800009, M3253800013, M3253800015, M3253800016, M3253800019, M3253800020, M3253800021, M3253800022, M3253800023, M3253800033, M3253790046, M3253790047, M3253790048, M3253790049, M3253790053, M3253790055, M3253790056, M3253790059, M3253790060, M3253790061, M3253790062, M3253790063, M3253790071, M3253790073, M3253440001, M3253440002, M3253440003, M3253440004, M3253440005, M3253440006, M3253440007, M3253440008, M3253440009, M3253440010, M3253440011, M3253440013, M3253440014, M3253440015, M3253440016, M3253440017, M3253440018, M3253440019, M3253440020, M3253440022, M3253440026, M3253440027, M3253440032, M3253440036, M3253440037, M3253440039, M3253440046, M3253440047, M3253780006, M3253780007, M3253780008, M3253780009, M3253780011, M3253780013, M3253780015, M3253780016, M3253780019, M3253780020, M3253780021, M3253780022, M3253780023, M3253780031, M3253780033 Bid Number ( ) : GEM/2025/B/6140864 Dated : 30-04-2025 Bid Document 1/53
Construction of elevated water tank of Genetics division at ICAR-CIFA, Kausalyaganga.
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Dhanaghar in Bonth Block Chhanchina and Kanti in B.Pokhari Block
Transportation, Installation and commissioning of H.T. pump set on pontoon, making of new pontoon,pipeline work, surface leveling and dismantling of MS pipe line for monsoon preparation for dewatering of sump water at NQ of Bharatpur OCP.
Construction of PQC road from in-motion weighbridge no. 01 to mid-sump (OB side) and other different connecting road (in 05 patches) like weighbridges, coal stocks to main road inside mines under KOCP of Basundhara Area.
Providing and fixing barbed wire fencing around central sump,Balanda Quarry-1 near coal stock no-5,coal stock no-10 and some vacant land inside balanda colony and Jagannath Colony of Jagannath colliery under Jagannath Area.
Construction of Additional 100000 ltrs capacity over head tank and laying of pipe line connecting with existing rising main, OHT and distribution pipe for RPWS to village Risigaon under Khariar Block in the District of Nuapada
Shifting installation commissioning pump set as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of Bharatpur OCp for One year
REPAIR TO CUPBOARDS TILING JOINERIES AND PLUMBING FITTINGS FIXTURES OF CERTAIN MD OFFRS ACCN IN ZONE A AND REPAIR MAINTENANCE OF DISINFECTION SYSTEM CLEANING OF OVERHEAD RESERVOIR AND UG SUMP INCLUDING CERTAIN REPAIR WORKS AT WATER SUPPLY INSTALLATIO
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles.Max. 2500 KM per month run in non rainy season and Max.1500 KM per month run in rainy season.
Hiring 03 no. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles (2500 KM/month non-rainy season n 1500 KM/month rainy season) 24hrs/ day duty 03 yrs KOCP Basundhara Area
Hiring 02 no. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles (2500 KM/month non-rainy season n 1500 KM/month rainy season) 24hrs/day duty 03 yrs GOCP Basundhara Area
Construction of 30,000 LTR CAPACITY ELEVATED STORAGE RESORVOIR WITH 10MTR STAGING including supplying fitting and fixing of GI Pipe AND ANCILARY ITEMS in connection with RPWS TO VILLAGE KUMULSING,GP KUMULSING, UNDER RAYAGADA BLOCK.
Retrofitting of Rural Piped Water Supply Scheme to Village Khadipada including laying of pipe line, construction of pump house, boundary wall, OHT and Internal Electrification and commissioning of Pump and Motor of Khadipada G.P nder Dhamnagar Block
Retrofitting of Rural Piped Water Supply Scheme to Village Katasahi including laying of pipe line, construction of pump house, boundary wall, OHT and Internal Electrification and commissioning of Pump and Motor of Katasahi G.P. under Dhamnagar Block
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 50000 Ltr. RCC OHT of 15 mtrs staging for Piped Water Supply Scheme to Village PALKIDANG of Ramanaguda block in Rayagada District
Laying of pipe line, Construction of Valve chamber, House connection and Construction of 50,000 Ltr. RCC OHT of 15 mtr staging for retrofitting of Piped Water Supply Scheme to Village TELENGAPADAR of Muniguda block in Rayagada District
Retrofitting of Rural Piped Water Supply Scheme to Village Arjunpur including laying of pipe line, construction of pump house, boundary wall, OHT and Internal Electrification and commissioning of Pump and Motor of Arjunpur G.P. under Dhamnagar Block
Transportation, Installation and commissioning of H.T. pump set on pontoon, new pontoon, shifting of MS pipe with flange welding including earth cutting and dismantling of MS pipe line for monsoon prep for dewatering of sump water at NQ,BOCP
Laying of 8 inch dia MS pipeline from Quarry 2 sump to discharge point ( near tiffin point Q2) and to provide supply of water for fire fighting to new coal stock BPL 5 at Belphar OCM, Lakhanpur Area, MCL.
Cleaning of existing high drains ,making kuchha drain at OSL patch , weigh bridge No. -04 to karadei sump culvert , heightening of earth embankment of existing embankment near inlet culvert of Hingula temple and periphery mines at Hingula OCP Unde
Cleaning of existing high drains making kuchha drain at OSL patch, weigh bridge No.04 to Karadei sump, heightening of earth embankment of existing pond near wheel washing point and periphery at Mines at Hingula OCP under Hingula Area.
Retrofitting of Rural Piped Water Supply Scheme to Village Korkora including laying of pipe line, construction of pump house, boundary wall, OHT and Internal Electrification and commissioning of Pump and Motor etc of Korkora G.P. under Bhadrak Block
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rainy season and Max.1500 KM/month run in rainy season for 03 years
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles .Max. 2500 KM per month run in non rainy season and Max.1500 KM per month run in rainy season.
Hiring of 01No. truck chassis mounted mist blower fog cannon along with min25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles(Max2500 KM/month run in non rainy n Max1500 KM/month run in rainy season)for 24hrs/day for 3 yrs Basundhara Area(C)