Loading…
Loading…
752 results • Best match
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rainy season and Max.1500 KM/month run in rainy season) for a period
Hiring of 01 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rainy season, Max.1500 KM/month run in rainy season) for 3 years at KOCP
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non rainy season, Max.1500 KM/month run in rainy season) 03 yrs GOCP BA
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM per month run in non-rainy season and Max.1500 KM per month run in rainy season)
Hiring of 01 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rainy season and Max.1500 KM/month run in rainy season) for a period
Hiring of 01No. truck chassis mounted mist blower fog cannon along with min25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles(Max2500 KM/month run in non rainy n Max1500 KM/month run in rainy season)for 24hrs/day for 3 yrs Basundhara Area(B)
Hiring of 01No. truck chassis mounted mist blower fog cannon along with min25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles(Max2500 KM/month run in non rainy n Max1500 KM/month run in rainy season)for 24hrs/day for 3 yrs Basundhara Area(A)
Cleaning of existing high drains, making kuchha drain at OSL patch , weigh bridge No. -04 to karadei sump culvert and coal corridor road both side RCC drain (Zero point to mallibandha under pass , heightening of earth embankment of existing embankm
Construction of temporary coal transportation road from seam-III to seam-II , approach road to mine sump, strengthening of road from seam-IV to seam-III and diversion road near Rakash village junction at Jagannath colliery under JA(Monsoon activity).
Dismantling, laying and fitiing of 6inch dia and 8inch dia pipelines at various surface locations like OSL Chowk, Time office sump. Siding-5 etc of AOCP including installation and dismantling of HT Pumps along with other related works at AOCP, JA
REPAIR REPLACEMENT OF SLUICE VALVE PPR PIPE LINES GATE VALVE ATTENDING DAY TO DAY WS COMPLAINTS CLEANING OF UG SUMP RESERVOIR MOTOR BREAK DOWN COMPLAINTS, REPAIR TO ROOF SHEET FALSE CEILING ELECTRICAL FITTINGS FIXTURES OF DAD UG CABLE PANEL BOARD SWI
SUBMERSIBLE DEWATERING PUMP# 9 & 10., SUBMERSIBLE PORTABLE SUMP PUMP
MISC REPAIRS TO RCC JALLI DRAINS FOOT PATH AND COMPOUND WALL IN MOHAN NAGAR AND PRAKASH NAGAR UNDER AGE BR I CHANDIPUR AND REPAIRS TO CERTAIN MISC BR WORKS OF EM INSTALLATION AND OHT UNDER AGE BR I CHANDIPUR
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 100000 Ltr. RCC OHT ( shaft type) of 15 mtrs staging for Piped Water Supply Scheme to Village JEERA of padmapur block in Rayagada District
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 100000 Ltr. RCC OHT ( shaft type) of 15 mtrs staging for Piped Water Supply Scheme to Village Rayalpadar of padmapur block in Rayagada Dst
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 100000 Ltr. RCC OHT (shaft type) of 15 mtrs staging for Piped Water Supply Scheme to Village PANDRAJHOLI of Ramanaguda block in Rayagada District
Repair of cement work like repair of water tanks,Flooring work,courtyard boundary wall,plastering etc. in Residential Quarters in Electrical Colony of RHEP,Rengali
SUPPLY, DISMANTLING AND ERECTION OF EMERGENCY WATER TANK FOR INDUCTION FURNACES AS PER PR 300001096
Hiring of 02 No. 10 wheel truck with carrying capacity 16 te and GVW 25 te chassis mounted mist blower fog cannon with min 40 mtr radial throw with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rai
Hiring of 02 No. 10 wheel truck with carrying capacity 16 te and GVW 25 te chassis mounted mist blower fog cannon with min 40 mtr radial throw with min. 25 KVA DG Set and 12 KL Water Tank and suitable no. of nozzles (Max. 2500 KM/month run in non-rai
Hiring of 01 No.10 wheel truck chassis mounted mist blower fog cannon along with min.25 KVA DG Set and 12 KL Water Tank, suitable no. of nozzles(Max.2500 KM/month run in non-rainy season and Max.1500 KM/month run in rainy season) 03 years B(W)OCP MLA
Hiring of 1 No. 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set n 12 KL Water Tank n suitable no. of nozzles (Max 2500 km/month run in non-rainy n max 1500 km/month run in rainy season) for 3 yr at Lingraj Area
Repairing and modification in AMC building and coating lab shed of AMT Dept, Provision of paver tile above front right side area and approach road of Slurry pilot pant of DandPE Dept, Provision of sump for RandD work etc. at IMMT, BBSR
Making of new Pontoon size(5.652 Mtr x 3.624 Mtr-01no)-05 sets(10nos), Repairing of HT pontoons(8 sets), repairing of LT Pontoons(03nos) recovered from mines sump, and making of new Service Pontoons (size 2.850mtr x 2.950mtr) 05 Nos.) at HingulaOCP
Construction of Polytechnic Building in MANUU Satellite Campus at Cuttack including Internal Water Supply, Sanitary Installation, Drainage, Internal Road, U.G. Sump, STP Tank, Internal Electrical Installation and External Electric Services, Fire Fighting works etc. (SH: Providing additional power point in different laboratories).
Rearing tanks RCC 24nos (32nos x 12 m2) with platform drainage truss structure with galvanizes sheet roofing, electrical and water supply system, overhead tank with bio-filter for Ornamental unit at ICAR-CIFA, Kausalyaganga.
AS PER DTCN
Works
Operation And Maintenance Of Other Machines And Plants - Maintenance of 33KV OHT line from Four pole structure near Himanshu Dhaba to 33KV RLS sub station yard bus bar other electrical equipment like CT PT MOCB Transformers LA etc 440V OH line stree..
A) Maintenance of colony water supply pumps like filter pumps, STP pumps and Booster pumps near Bharatpur CHP. B) Making of 36 nos. drum and 12 nos. drum pontoon, change of pontoon and other misc. work at South Balanda Sump for water supply etc
Making of pipeline range for Coal Stocks and making of one range pipeline from Water loading point near mines canteen of JNC to OSL Chowk Sump and shifting of 5nos Fog Canon and dismantling of pipeline and laying of pipeline for Fog Canons at AOCP
Construction of stair from Dam top to Gallery adit and upto Dam Top of Earth Dam, Hand rail in stairs of adit, PVC pipes in porous drain, drain width, gap filling near sump and rise of Rim of foundation gallery of Rukura Irrigation Project.
AS PER DTCN
Brick work, cement concreting work, RCC Work, plastering, other civil works etc.
Brick work, cement concreting work, RCC Work, plastering, other civil works etc.
PWS to Matiaburai under Sanakhemundi Block (OHT of 40K ltr Capacity )
Laying of 4 inch and 6 inch dia M.S. pipe line over metallic post and providing and fitting of sprinklers for dust suppression at OB Haul road (common for both BGR and VPR outsourcing company) from MGR rail crossing to BOCM 5 sump at LKPOCP,LKPA
Auto Hydrulic Sweeper Machine, Water Tank 200 Ltr, Dust Collection Bucket 200 Ltr, Water Pump, Water Spray Nozzle
Civil work
Contract for laying of additional 500NB MS AWRS Pipeline from Ash Dyketo Ash water sump.
Laying and fixing of 4 inch dia main pipe line.
RPWS WORK
Renovation of Water Supply Pipeline of service water tank (Type-II/Type-III/Type-IV) at ICAR-CIFA Residential Colony, Kausalyaganga, Bhubaneswar
PWS to B.Kainchapur under Ganjam Block (OHT of 40K ltr Capacity, UGR 100K ltr Capacity )
Upgradation of Ekalavya Model Residential school (EMRS) Nuapada , Dist.Nuapada, Odisha. Sh:Construction of 1 nos. smart class room and , 0.80 Lakh litres Under ground sump and pump house, Six Nos. Type-III Qtrs, Qtrs forty bedded Boys Hostel, Forty bedded Girls Hostel , Basketball courts, Providing 25 KVA X 1 No. DG Set for Girls Hostel.
Construction of ESR
Works
Ref. Enquiry Cum Offer and BoQ
Upgradation of Ekalavya Model Residential Schools (EMRS) at Gidhibas, Dist-Keonjhar, Odisha. SH: Construction of 1.00 lakh litres RCC sump and Pump house with 2 Nos Bore well, Providing Concertina Coil Fencing over the existing compound wall of Girls Hostel, Construction of 1 No. e-Library, Multipurpose Hall, 2 Nos. Type-II Quarters and Providing IEI & Fans, DG sets.
Construction of Boundary wall of height 3.60 metre of baffle firing range and construction of 02 nos of training stores at KRTC, CISF, Mundali, Cuttack. SH: Renovation of Baffle Firing Range including Construction of drainage, butt wall at the end of ... of sump beside ...