Loading…
Loading…
2,962 results • Best match
Maintenance of Junction Improvement opposite to Mee-Seva santosh nagar to water tank santosh nagar and opposite St moses school in Santosh nagar Div-39, Santosh Nagar Circle-7, W-17, GHMC. (Reserved for Individual ST Contractors proprietor firms / Partnership firms) (Recall)
Providing Rubber Speed Breakers to prevent accidents at Idare Milliya Masjid ,Model Market,race Course ,Reliance Digital and Agriculture officer and Old Water Tank, Kalagadda Road Maharaja Hotel, hitech Function Hall and Teegalaguda in Old Malakpet Div-26,GHMC (Recall) (Rs. 6.00 Lakhs)
Supply, delivery and laying of HDPE/PVC pipeline in place of existing damaged GI pipeline from service water tank of Phase-I Stage-I 205 MLD WTP to various units in the premises of Kodandapur under SD.No.I of O&M Div.No.XI, Sahebnagar.
Drilling of Bore well along with Supply, Delivery and Fixing of 1-HP Submersible Pump Set with all accessories and providing and construction of Mini water tank at H/o. Singoor Ramesh at 8th Ward in Sadasivpet Municipality, Under S.F.C. 2016-17.
Engage of Vehicles for Dismantling of structures from peerlagutta water tank road to opposite dargah & link roads in ward no7(peerla gutta) and from dargah to Jangala guttaa & link roads in shanthinagar colony in ward no8 under Pattana pragathi funds in Wanaparthy Municipality
Filling of pot holes with gravel and stone dust and arrangements of barricading, sand bags at Manakondur new point Mission Bhageeratha water tank on occasion of bathukamma festival 2025 Est. cost of Rs. 1.10 Lakhs under MGF (Reserved for SC Societies/Individual)
Laying of CC Road from H.No 16-9-427/A/2/1 Quadri tower to H.No: 16-9-437/A/2 Bismillah Hotel,RJ Function Hall,Water tank road, Old Malakpet, Divi-26, Circle-6, CRZ, GHMC. Rs. 11.00 Lakhs (1st Recall)
Providing High Mast with LED Flood Lights at a) Chakali Veedi , b) Gangarapu Laxmaiah House and Side Lighting from Veg Market to Water tank near Laxmi Talkies in Ward No.14 in Kosgi Municipality under 15th FC/PP Grants Est.cost.15.00 Lakhs.
Re-aligning of the exisiting 30 mts wide Master Plan Road Passing through the middle of the TGIIC land in Sy.No.30 of Osmannagar village starting from Y junction upto Village water Tank in Osmannagar (V), RC puram (M), Sanga Reddy District
Laying of 300mm Dia SWG pipe from Water tank to Aishwarya ICON apartments and Padmasri lines to H No.9-32-4/3 in Pardhasaradhi colony, Muthangi, Muthangi Ward no-265, Patancheru Circle-46, SLP Zone CMC (Rs.41.00 Lakhs) (2026-27)
REP TO LEAKAGE/SEEPAGE TO SUNKEN FLOOR,JOINERY, PLUMBING, FLOORING, SANITARY FITTING, CLEARING OF SERVICE WATER TANK AND OTHER ALLIED WORKS INCLUDING PERIODICAL SERVICES, WEL MAINT IN OTM, MD ACCN AT DGQA AREA UNDER AGE B/R (S) NO. IIOFGE(S) SECBAD
Fixing of water meter with strainer on 200mm dia main at near Tapping point or Sump or ELSR premises at Raviryala under Thukkuguda Section, sub Division No.II, O and M Division No. XX.
KTPS-V Stage-Civil-O&M-I- laying of Hume pipe for diversion of back waste water of KTPS-V Stage clarifier to back wash sump at PTP area of KTPS-VI Stage.
Fixing of water meter with strainer on 150mm dia main at near Tapping point or Sump or ELSR premises at Raviryala under Thukkuguda Section, sub Division No.II, O and M Division No. XX.
Providing safety fencing with chain linked wire mesh including RCC poles and Iron gates around earmarked site at 300KL sump ear Bachupally School under Bachupally Section, Sub Division-II O&M Division XXIII
Formation of Road with Gravel and Wet mix from Bypass road to Municipal Sump cum Pump House near Velugu Office in Sangareddy Municipality Under Natural Calamities from 30th August to 2nd September 2024
Repair to Transformers at Devarakonda ULB Sump, Gagillapur IPS, Pendlipakala WTP ,Kodandapur WTP Filter Bed ,PD Pally WTP and PD Pally Intakewell of AKBR Segment with an Estimate cost of Rs: 50.00 Lakhs
Construction of Sump cum Pump house including pumping equipment and accessories, Staff Room, Store room, Wash rooms, Compound wall, drilling of 6 1/2" Bore well and Relocation of Transformers at Bowenpally junction
Supplying, Laying and Jointing of 450 mm dia. DI Pipe Line (Length: 5500 m) from PVK 5B Incline sump to proposed new filter beds at Gowthampur Colony, Kothagudem Area, Bhadradri Kothagudem Dist., T.S.
Replacement of damage Existing MS Pipe line with new 50 mm dia C class heavy duty MS Pipe from Vishnu Pushkarani area (Main sump) to the Auto stand at Ghat road up hills
Laying of 110mm HDPE pipeline from Libra Colony Water Sump to B. Chander House in Dwaraka Nagar in Ward No 6 of Badan Municipality under Municipal general funds for the year 2018-19
Construction of Office building to the re-organized O/o Manager (E), Yellammabanda section at KL Sump and ELSR reservoir premises under Yellammabanda Section, Sub Div No-I, O&M Div-IX Kukatpally
Providing arrangements for temporary sump for immersion of Bathukammas on the eve of Bathukamma Festival - 2025 in various locations of ward no 130 , Quthbullapur Circle- 25, GHMC (AS 2025-26) (ITem No. 02)
Construction of water Sump and Tool Room at under LB Nagar flyover, LB Nagar Junction in ward no 15 Vanasthalipuram of L B Nagar, Circle 4,GHMC.(A.S.DATE:20.09.2025, BUDGET YEAR 2025-26)
Construction of Sump, Reconstruction of Meeting Hall with staff Quarter, Shifting of /Reinstallation of Existing 40KW Solar Plant and Relocation of Transformers at Balamrai - Near Paradise of Secunderabad Cantonment board on NH 44
Special repairs to Non-Residential building of Survey of India, Uppal, Hyderabad during 2023-24. SH: Repair of Fire sump and sewerage line from MT Section to Main line and other miscellaneous work.
Renovation of School roof, toilets and Drinking water tank etc
Laying, dismantling of 33kv and below OHT lines and erection of substation switchgear at STPP, Jaipur, Mancherial, Telangana as and when required for a period of two years on value contract basis.
Outsourcing of pre-monsoon inspection and cutting tree branches and bushes underneath and above OHT lines under the jurisdiction of AWS Manuguru for a period of 03 years on rate contract basis.
Painting to electrical switch gears and electrical rail poles etc., with smoke grey and silver paint in all 33KV/3.3KV Substation & LT OHT lines in P.V.Township, Manuguru Area, Bhadradri Kothagudem(DT), T.S.
Comprehensive maintenance civil, Plumbing, Electrical, carpentry and servicing of 02 Nos DG Set and water pumps, transformer and cleaning of OHT, Sumps and PVC RCC water storage tank at GC, CRPF, Hyderabad
Laying of approach cc road from water sump to dwakra building and from existing cc main road to PHC near GP Office in Gagillapur village in Dundial Municiplality under municipal general funds 2018-19
Laying of SW Pipe Drain from Water sump in Green Rich Colony to H.No.16-61/14 in Sai Raghavendra Homes Colony in ward No.1 in Badangpet Municipality under General Funds 2018-19
Construction of Sump, Laying of Children Play Area and Providing Sprinklers to the Lawn area in Buddha Nagar park in Ward No.12 in Peerzadiguda Municipal Corporation under Municipal General Funds/SMG 2021-22.
Fixing of water meter with strainer on 100mm dia main at near Sump of ELSR premises at RCI Colony in Raviryala G.P under Thukkuguda Section, sub Division No.II, O and M Division No. XX
Construction of Compound Wall for ELSR,ELBR,Sump and Construction of Staff Room and Reairing to Generator and Construction of Shed for Generator near Tahasildar Office in Metpally Municipality under 15th FC Tied Grants
Laying CC road With Rmc on Earthern Road in From Sai Samrat sump pipes Industries Ltd to 7-4-153/4 at Gaganphad in Ward-59 Mailardevpally Div in Rajendranagar Circle. (Rs.49.50 Lakhs)
Construction of Compound Wall and Sump for Municipal Open Space at Sudharshan Nagar Back Side of Plot No. 17 Sy No.78,79&80 Ward No. 02 in Peerzadiguda Municipal Corporation under General Funds2020-21
Laying of HDPE Water Pipe line at Budagajangala basthi in Gummadidala , Raghavareddy(H) to High School in Bonthapalli and Rajasekar H to School Sump in Domadugu areas in Gummadidala Municipality under MGF 2025-26.
Laying of HDPE Pipe Line from OHSR Tank to Sump and OHSR Tank to Gurampally Sathaiah in Ward No.16 of Shamshabad Municipality under Municipal General Funds 2019-20 (Reserved for SC Community/Individual).
KTPS-VII Stage - Civil - O and M-I - SD-I - Providing thrust blocks to pressure evacuation lines at ESP area, arresting leakages to ash slurry sump and attending other miscellaneous works in boiler area
Supply delivery and fixing of 300mm dia DI/DF non-return valve MS specials to the pumping man at No.1 sump, Pragathi Nagar under Pragathi Nagar Section, EAM Cell, O&M Division No.XXIII
Removal of accumulated silt, clay mixed with sand from intake well sump in front of pump chambers area below the beam grids (Area between C2-C4 & G2 -G4) at Intake pump house of BTPS
TGGENCO-KTPP-1*600MW-CAM-Extension and re-routing of Stage-II drain sump water to ash recovery clarifier and other related miscellaneous mechanical works etc of ZERO discharge system of KTPP Stage-II
Sump cleaning and PVC tanks cleaning in Minister Quarter No. 01 to 30, Watch towers, House, Building and main security complex at Ministers Residential Quarters at Road No. 12, Banjara Hills, Hyderabad. (Quarterly Cleaning)
Providing of flooring, construction of Sump, repairs to existing toilets and construction of additional toilets for GHMCcommunity hall SR Nagar main road Bapu Nagar, SR Nagar in 98-Ameerpet Division, , Circle 17, KZ, GHMC
Providing H Guarders (Beam) V Channel, 5mm & 8mm Chaked Plaate to remove and errection of 3 No's 50HP Motors at 150 KL OHBR Clear Water Sump of Alisagar Filterbed (New) of Nizamabad Municipal Corporation.
Construction of sump and fire hydrant system at 220 KV and 132 KV Sub stations in Khammam circle ( 220 KV SS Budidampadu, 220 KV SS Seetharampatnam and 132 KV SS Khammam) in Warangal Zone
Construction of Water sump, connected water supply pipe lines, flooring in the premises of building and Fixing of MS grills on Compound wall at Aungunwadi building at Annojiguda in Pocharam Municipality under general fund
TGGENCO-KTPP-1*600MW-CAM-Extension and re-routing of Stage-II drain sump water to ash recovery clarifier and other related miscellaneous mechanical works etc of ZERO discharge system of KTPP Stage-II