Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 200Kl/18M), D/S, Rising Main work, Boundary Wall, SQ, in RAKAULI GRAM PANCHAYAT Water Supply Scheme Under J.J.M
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 200Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in SURAJPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 150Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in HAZIPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 150Kl/16M), D/S, Rising Main work, Boundary Wall, SQ, in CHATTARPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 200Kl/12M), D/S, Rising Main work, Boundary Wall, SQ, in NASIRPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 100Kl/12M), D/S, Rising Main work, Boundary Wall, SQ, in SEMRAJPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 175Kl/12M), D/S, Rising Main work, Boundary Wall, SQ, in ARAILA GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
REPAIR / MAINTENANCE OF CI / GI / DI PIPE LINES OF VARIOUS SIZES AND CLEANING OF OHT ALONG WITH CONNECTED ITEMS AT TECH AREA AT AF STN BAREILLY UNDER GE(AF) BAREILLY
REPAIR / MAINTENANCE OF CI / GI / DI PIPE LINES OF VARIOUS SIZES AND CLEANING OF OHT ALONG WITH CONNECTED ITEMS AT DOMESTIC AREA AT AF STN BAREILLY UNDER GE(AF) BAREILLY
Strengthening of Water Supply (S/F of L. T. Panel, Automatic Starter and Making Lighting Arrangement of Compound at OHT and UGR in Sector-50, 50(B) and 51), Noida.
CONSTRUCTION WORK OF RAIN WATER HARVESTING IN WATER TANK
Establishment of Grid Connected Solar photovoltaic Power plant at ICMR-NARFBR campus. SH: SITC of Motor pumpset for lifting treated water from ETP to OHT s make up water for Cooling Tower Subwork/Packages: Establishment of Grid connected Solar ... to OHT as ...
PROVISION OF SUMP WITH HIGH CAPACITY PUMPING SYSTEM AT 29 END, PUMPING SYSTEM TO DRAIN OUT RAIN WATER AT VIJAY VIHAR AND SPECIAL REPAIR OF CERTAIN COOLING APPLIANCES AT AF STN GORKHPUR
Servicing of Risers butterfly valve 700NB Repairing of sump screen and servicing of Gate Cleaning of cold water basin etc of cooling tower during overhauling of Unit 5 2x250 MW PTPP Parichha
Interconnection of Existing Common Inlet Chamber To Existing New Sump by Laying Sewer including Construction of Screen Chamber and other Appurtenant Works in Alopibagh Sewage Pumping Station Campus in Municipal Corporation Prayagraj
Construction of Civil works For Installation of One No. Additional Sump Pump And Construction of Drain For Sort Out The Problem related to Water Loging At 132 K.V. Sub Station Morta, Ghaziabad.
Laying, jointing and dismantling of 200 250 300 MM diameter MS pipeline in Turra Main and North Sumps and Purewa Bottom Sump as and when required during Monsoon 2026 at Bina Project
Cleaning and removal of silt from Coalyard no. 2 to CHP receiving pit, main entry haul road drain and west sump including CHP, Coal Workshop, nallah, siltation area etc. at Khadia Project
Tender for laying of 160mm dia pvc pipe line (sewage-drainage line) for Cantt Board dhobi ghat to northern sewage pump sump well of railway Agra Cantt 2020 21 Cantonment Board Agra
2. npp sandila ward no.20 me 162 mtr gangeshwar mahadev mandir se suresh gupta ke makan tak rcc covered drain nirman with sump sedimentation chamber for water recycling at pasojan drain
Cleaning and removal of silt from Coalyard no. 2 to CHP receiving pit, main entry haul road drain and west sump including CHP, Coal Workshop nallah, siltation area etc. at Khadia Project
Ward No.03 Sadar Bazar me Ashfak ke makan se ambedkar park ke peeche tak RCC covered Drain Nirman with sump chamber for drain water Recycling at digiya Pond Hetu Nirman Karya.
PROVN OF OVERHEAD WATER FILLING POINT AT PUMP HOUSE NO 3 AND STATIC WATER TANK AT AJITHNATH VIHAR, FIRE RETARDANT/RESISTANT FALSE CEILING IN AFNET ROOM,SHED FOR LOGISTIC STORE, 05XSHED FOR GARBAGE BINS, SUBMERSIBLE PUMP MOTOR SET AT 7 AFH
Under (NCAP) Construction of side patri from C.C. Interlocking Tiles and repair work of Hotmix road from Main road located on Sambhal Road to Gastar Overseas via Over head water tank with comprehensive O and M period of five years
water truck cabin truck with water tank Water Truck Cabin Truck With Water Tank ( 11 ) Technical Specifications Specification Specification Name Values Allowed Values Generic Parameters Engine Capacity (cc) 5675.0 - Water Tanker Capacity (Litres) ... of water tank (Litres) ... with water Tank : ... of water tank to ...
REPAIR TO ROOFS, WALL OF DISTRESSED OH WATER TANKS INCL OTHER DISTRESSED RCC STRUCTURES UNDER GE(AF) SARSAWA
Demolishing of existing old damaged OHT and construction of 2.25 lakh litre capacity New RCC over head water storage tank with 30 mtre staging at Residential Complex, GC, CRPF, Chandrayangutta, Hyderabad. Subwork/Packages: Attending the defects like ... of OHT by ...
M/o Water Supply (Two Years Annual Cleaning and Repairing of OHT and UGR of Network-55, 56, 66, 67, 68, 74, 78, 112, 113, 115, 118, 121 and 122) Noida.
Construction of OHT, TW, Staff quarter, boundary wall, site development, Risingmain including material, labour complete in all respect including commissioning testing, trail and run, defect liabilities and handing over to UPEIDA
M/o Water Supply (Two Years Annual Cleaning and Repairing of OHT and UGR of Network-55, 56, 66, 67, 68, 74, 78, 112, 113, 115, 118, 121 and 122) Noida.
Line-up Security Agency for Security Services / Patrolling of Keetham Refinery Water Pipeline, Two OHT lines, Koyla water Pipeline, KoyalaPump House, IBP Terminal, Parking regulation and LndT yard area at MR
Provision of 225 KL RCC OHT with plumbing pipe, pump house with bore in lieu of steel tank at HW in the jurisdiction of ADEN/HW. (Est. no. 36/2025 Capital)
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 300Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in MANIKPUR ASANA GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 150Kl/16M), D/S, Rising Main work, Boundary Wall, SQ, in PILKHI BARUNA GRAM PANCHAYAT Water Supply Scheme Under J.J.M
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 150Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in ITAULIMATH MAHESH GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 300Kl/18M), D/S, Rising Main work, Boundary Wall, SQ, in SIPAH IBRAHIMABAD GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 150Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in CHORPA KHURD GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 175Kl/14M), D/S, Rising Main work, Boundary Wall, SQ, in KAMTHARI NOORPUR GRAM PANCHAYAT Water Supply Scheme Under J.J.M.
Construction work of Pump House, (T.W.- 1 No), OHT(1 No.- 175Kl/16M), D/S, Rising Main work, Boundary Wall, SQ, in ZAMIN CHAURADIH GRAM PANCHAYAT Water Supply Scheme Under J.J.M
M/o W/s (Two Year Cleaning of UGR and OHT in Different Network) (Sector-62, 63, 64, 65, Village-Chhajjarsi, Bahlolpur, Sector-119, 120 and Sector-151 to 154) Noida
Strengthening of G.Jal (Providing and Laying 400 mm dia D.I. G.Jal line from 80 Cusec Gangajal Existing Line Near Hyde Park Sector-78 to Jal Division UGR/OHT Sector-78) Noida.
ANNUAL MAINTENANCE TO WALL TOILET, KITCHEN FLOORING, BATHROOM SANITARY FITTINGS PVC OHT AND OTHER MISC REPAIR IN MD ACCN IN SRC LINE UNDER AGE BR I OF GE NORTH MEERUT CANTT
Provision of 225 KL RCC OHT with plumbing pipe, pump house with bore in lieu of steel tank at HW in the jurisdiction of ADEN/HW. (Est. no. 36/2025 Capital)
work is carried out in front of B-154 in Suryanagar and B-25, B-17, B-16, D-22 in Suryanagar and in front of the water tank and near the dhaba and the area near the bridge post and Radisson Hotel.
The work of shifting 11 KV power line and LT lines and changes under the Purna deposit scheme under the work of widening DDG from Mussoorie Flyover Bridge to Piplara Water Tank in the workspace of Electricity Distribution Sub Division-3, Murdnagar un
Supply/ SITC/ Item of Works, on urgent basis for the works of Conversion of 2 Floor existing room in TOR U.G Tank, Syntax water tank, Road and External drainage, Refurbishment of HVAC System Installed for Making Function Etc. at DCBO Colaba.2nd cal
Const. of 02No.Gate and Gate Pillars, External Nala, 01 No Public Toilet, water tank, pond, Remaining part of CC Road Infront of 12 Nos B Type F,v shops, Const. and rep. of R.C.C. boundary wall, Internal drain, etc. at S.M.Y. Sasni.
Maintenance of Street Light on road between F and G block and Challera Sabzi Mandi, Road between sector-44 and 96, road between sector-96 and 45 , road between sector-44 and Amarpali group housing pocket upto water tank sadarpur colony, road between
Zone 1, Ward No. 96 (Dhankot) CC flooring and drain construction/repair work in Dhankot (covering the small and large Fabbara areas)extending from the water tank near Mughal Vatika, passing by Asal shop, up to House No. 26/17, including the lan
Set of Air Vent Valve for Roof Water Tank and Vacuum Valve. (1) Air Vent Valve to RCF Drg. No. LW63150, Alt. e, Item No. 4, Qty. / Kit - 01 No. (2) Vacuum Valve G 1/2 " to RCF Drg. No. LW63150, Alt. e