Loading…
Loading…
1,347 results • Best match
Widening from Two Lane to Two Lane with Paved Shoulder and Strengthening Works Bus Lay Bay Work in Government Roads in Aravakurichi H CandM Sub Division TPR 004
Improvements to Riding Quality Providing Bus lay bye Junction Improvement Reconstruction of Cross Drainage Works in Government Roads of Karur Highways C and M Sub Division TPR 014
Appointment of consultant for Preparation of Project Report and Bid documents for Revenue Augmentation from Hoardings, Bus Shelters, Street Lamps, Parks Playgrounds other assets for Greater Chennai Corporation
BD-FM0GEN/9/ MTC - TERMINUS / DEPOT Development/2023/1
Widening from Two Lane to Four Lane and Strengthening including Construction of Centre Median, Construction of Drain, Reconstruction of Culvert, Providing Bus Lay Bye and Paver blocks- TVM-30
Package81 Strengthening Government roads in Vadipatti H C and M Sub-Division including bus lay bye construction of Centre media and drain including Upkeeping for a period of 60 Months
WIDENING FROM TWO LANE TO FOUR LANE AND IMPROVEMENTS AT KM 16by8 to 24by8 OF PALLADAM to DHARAPURAM ROAD INCLUDING CD WORKS, BUS LAY BY DRAIN AND PROVIDING CENTER MEDIAN
Package No. 112 Improvement works including upkeeping for a period of 60 months, Providing Bus lay bye and Junction improvement works in Cheyyar (H) C and M Sub Division Jurisdiction
PACKAGE 53 Improvements, Improvements to Riding Quality, Providing Bus Lay bye including up keeping for a period of 60 months in Govt. Roads in respect of Mayiladuthurai H CandM Subdivision.
Package No. 111 Widening and Improvement works including upkeeping for a period of 60 months, Providing Bus lay bye and CD works in Arni (H) C and M Sub Division Jurisdiction
Widening, Improvements and Improvements to Riding Quality to Government Roads including Providing Bus Lay Bye, Construction and Reconstruction of Pipe culvert, Construction of Retaining wall and well Protective wall Package 48
Widening and Improvements to Government Roads including CD Works, Construction of Bus Lay Bye, Retaining Wall and Storm Water Drain, Widening of Culvert in Valapady (H) CandM Sub Division (SLM-63)
Improvement Improvements to riding Quality including Reconstruction of Slab Culvert Construction of Curve Improvements and Providing Bus lay bye works in the Government roads of Uthamapalayam Highways C and M SubDivision MDU009
Construction of UG Stations at Kolathur Junction, Srinivasa Nagar, Villivakkam Suburban Station , Villivakkam Bus Terminus and Nathamuni with Entry/Exit,Ventilation shafts,Plumbing, Earthmat,Architectural finishes, Signages etc incl Twin Bored Tunnel
EM I Laying of 3C X 95 Sqmm new aluminium armoured PVC insulated LT power cable for the provision of standby supply in Hydrogen Plant I and II from ACWPH LT BUS I
Widening, Improvements, Improvements to Riding Quality including Reconstruction of Culvert, Junction Improvement and Bus lay bye works in Govt. Roads in respect of Thanjavur and Tiruvaiyaru H C AND M Subdivision TRY 27
Widening, Improvements, Providing Bus Lay Bye, Improvements to Riding Quality to Government Roads including CD and Construction Works and Upkeeping for a period of 60 months in Pennagaram (H) Sub Division (Package-85)
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-OKM feeder Bus-I at 230 KV Switching Station Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-OKM feeder Bus-II at 230 KV Switching Station Myvadi
for Supply ,fabrication and Erection of new steel structure and Dismantling ,Erection of existing defective 230 KV AB Switch(WOE) by new Switch in 230 KV Myvadi-Kadamparai-I feeder of Bus-I
Widening, Strengthening, Urban Improvements, Paver block, paved shoulder, Construction of Retaining wall , drain , Center median, Protective works , CD works , Reconstruction of Culvert, Junction impts and Bus lay bye works in the Govt MDU069
Providing 230KV breaker plinth foundation for AH towers and erection of 230 KV strung bus structures and allied civil works for providing additional 1no 100 MVA transformer at Siruseri 230 110 KV SS
Widening, Improvements and Improvements to Riding Quality to Government Roads including Bus Lay Bye and Construction works and Up keeping for a period of 60 months in Omalur (H) Sub Division (Package-37)
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Ponnapuram-III feeder Bus-II at 230 KV Switching Station Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Kadamparai-I feeder Bus-II at 230 KV Switching Station Myvadi
Improvements Improvements to riding Quality including Junction Improvement Widening the culvert Construction of Retaining wall and Providing Bus lay bye works in the Government roads of Uthamapalayam Highways C and M Sub Division MDU010
PACKAGE 91 Widening and improvements, Improvements to Riding Quality, Bus lay bye and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Pattukottai H CandM Subdivision
Labour charges for Dismantling and Erection of 2 Nos. New 110 KV SF6 Breaker for 110 KV Marudhur Feeder and 110 KV Bus coupler Breaker at 230 110KV SS Thudialur, in Coimbatore Operation circle.
Widening Strengthening Providing Junction Improvement including Widening the Pipe Culvert and Slab Culvert Bus Lay bye Geometric Improvement and Centre Median Works in the Government roads of Bodinayakanur Highways C M Sub Division MDU 003
SSE works and dismantling of existing 230kV bus, Supply and erection of 110kV cable accessories and laying of 110kV cable etc., for enhance. of exist. ICT capacity from 2x100 into 3x100MVA at Siruseri 230KV SS.
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Udumalpet Link-II feeder Bus-II at 230 KV Switching Station Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Udumalpet Link-II feeder Bus-I at 230 KV Switching Station Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Udumalpet Link-I feeder Bus-I at 230 KV Switching Station Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Udumalpet Link-I feeder Bus-II at 230 KV Switching Station Myvadi
Strengthening, Improvements to Riding Quality, Reconstruction of Culvert, Bus lay bye and Construction of Minor Bridge, Pipe Culvert, Culvert, Box Culvert, Retaining wall and Providing Road Safety works in the Government roads of Peraiyur Highways
Widening and Strengthening, Improvements to Riding Quality including Reconstruction of Culvert, Construction of Protective wall, Construction of Drain and Bus lay bye works in Govt. Road in respect of Thuraiyur H, CandM Subdivision TRY-07
Widening from Two Lane to Four Lane and Improvements to Karur Town limit Widening Box Culvert Providing Bus lay bye and Centre Median Works in Government Roads of Karur Highways CandM Sub Division TPR 051
PACKAGE 78 Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivision
Wdg and ImptsImptsConstn of Rtg Wall Constn of Drain Dip Raising Bus Lay Bye and Including Upkeeping for Period of 60 Months on Govt Roads in Aravakurichi Highways C M Sub Division Package No 27
PACKAGE 79 Widening and improvements, Junction Improvements, Drain, Bus Lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivision
Widening with Paved Shoulders and Strengthening,Widening and Strengthening, Reconstruction of culverts, construction of Drain, Providing Bus lay bye and construction of retaining wall on Government roads in Vellore (H), CandM, Sub Division - TVM-2
Replacement of 400kV and 230kV Isolators, providing earth mat, jumpers and droppers and strengthening of 230kV strung bus etc., for enhancement of 400kV ICT capacity from 3x315 MVA to 3x500 MVA at Sriperumbudur 400kV SS.
Package 41 Widening Improvements to Riding Quality Junction Improvements Widening Curves Construction of Retaining Wall Paver block, Bus lay bay including CD works to Government Roads in Ambasamudram H C and M Sub Division including
Development of Park in 6 acres including Landscaping Pond with Channel Walking Track Stone Sculptures Fountains Mediterrean Park with Civil Electrical and Plumbing works inside the New Mofussil Bus Terminus at Kilambakkam near Vandalu, Chengalpattu
Improvements Improvements to riding Quality including Raising the concrete shoulder, Re construction of Box Culvert Construction of Retaining wall Drain and Providing Paver Block Bus lay bye works in the Government roads of Uthamapalayam Highways C
Supply of SubStation Structure materials Bus Scheme material Cables Safety Equipments Tools and Plants for introduction of 110 33KV System at 110 11 KV Irugur Sub Station 33 KV side in Coimbatore operation Circle of Coimbatore
Providing Paver Block road and Construction of storm water drain at ward no.15 Jothi nagar cross street, New Bus sand Opposite cross street and Patel street second cross street North South in Sivagiri Town Panchayat
Widening from Two lane to Four lane and strengthening at Km 26/600 - 36/680 of Arcot - Tindivanam Road including Reconstruction and Widening of Culverts, Providing Junction improvements, Bus lay Bye and Centre Median- TVM-82
Supply Installation Commissioning and 5 years Comprehensive maintenance of Grid connected Solar Photovoltaic PSV power plant for cumulative capacity of 250KWp to achieve net zero carbon emission in the Mofussil Bus Terminus at Madhavaram Ch-110
Widening from Two Lane to Four Lane and Strengthening at km 77/8 - 81/9 of Arcot-Tindivanam road including Reconstruction and Widening of Culverts, Construction of Retaining Wall and Providing Bus Lay Bay- TVM 104