Loading…
Loading…
1,347 results • Best match
Construction of Rain water drain at Rose Compount to Anjugramam bus stant front side in Anjugramam town panchayat
Erection of 1 no 110 kv bus coupler bay equipment at Arani SS including civil and electrical work
Annual and quarterly maintenance in the 230 KV SF6 breakers Isolators LAS CVT CC wave trappers WBCTs wall through bushing, Main bus IV and V PTs and CTs and transfer bus etc at 230 kV Indoor switch yard II of unit IV and V
Cleaning, tightness checking and assisting in MRT Testing works in the 230 KV SF6 breakers, Isolators, LAS, CVT ,CC, Wave traps, Main bus I, II and III, PTs and CTs, wall bushing and Transfer bus etc., at 230 KV Indoor Switchyard I including Quart
Appointment of Consultant for the Consultancy Services for Construction of Bus Terminals at Chengalpattu and Mamallapuram through PPP Mode
MTPS I ES Circle EM I Division Unit IV Annual maintenance works of critical LT modules LT breakers in USSG 4A 4B SSSG 4 N E 4 BMCC 4A 4B VMCC 4A 4B and SBMCC 4 LT buses during the AOH 2020.
MTPSI ES EMI SDI Complete cleaning, tightness checking and checking IR value of 6.6 KV HT bus 1A 1B and its bus ducts and Annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG -1A 1B, SSSG1, NE-1, BMCC-
MTPS-I ES Circle EMI Complete Cleaning, tightness checking and checking IR value of 6.6KV HT bus 2A 2B and its Bus ducts and and Annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG2A 2B, SSSG-2 NE2 BMCC2
Supply of 230 KV , 2000 Amps, Bus Earth Switch without MOM Box and insulator 1 Phase (6 Nos.) (Re-tender)
Supply,Fabrication,Erection of 1 No 230KVABS structure and switch in230KV Auto-III Main Bus Switch at 230KV Udt SS
Supply fabrication erection of steel structure and 110KV ABS WOE in 110KV Ranganathapuram feeder bus switch at 230KV udt SS
imp 3Nos in new 110v dc indoor and breaker and kootutankadu breaker and bus coupler vilathikulam and rural sub division
MTPS I ES Circle EMI SD II Annual maintenance and complete cleaning checking of IR value of 2 Nos. LT buses and its modules in AC plant MCCI and MCCII and replacement of compressor local JB by standard type pillar box during 2024 25
MTPS-1-ES Circle - EM-I - Unit-II-Annual maintenance works of critical LT modules and LT breakers in USSG-2A and 2B, SSSG-2, N E-2, BMCC-2A and 2B, VMCC-2A and 2B, and SBMCC-2 LT buses during the AOH-2020.
Hiring human resource of 04 nos. of HMV Drivers (Heavy Duty) to operate 02 nos. of School buses and 04 nos. of LMV Drivers (Light Duty) to operate 02 nos. of Dog Vans for a period of 06 months (180 working days) on contract basis.
Custom Bid for Services - CPCLV25233 Carrying out Power system studies for shifting of Tie Feeder and Ref- I & II incomer Feeder at CPCL, Manali Similar Category Operation And Maintenance Of Switchyard Operation and Maintenance Power House/Power ... Electrical Buses
Repair and Overhauling Service - REPAIR OF LORRY 3 TON 4X2; REPAIR OF LORRY 3 TON 4X2; Yes; Buyer Premises, Repair and Overhauling Service - REPAIR OF AIRCREW VAN; REPAIR OF AIRCREW VAN; Yes; Buyer Premises, Repair and Overhauling Service - REPAIR OF ... SCHOOL BUS ; ... SCHOOL BUS ; ...
MTPS-I ES Circle EM-I SD-I Complete cleaning, tightness checking and checking IR value of 6.6 KV HT bus 1A 1B and its bus ducts and Annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG -1A 1B, SSSG-1,
MTPS-I ES Circle EM-I SDII Complete cleaning, tightness checking and checking IR value of 6.6KV HT bus 2A 2B and its bus ducts and annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG-2A 2B, SSSG-2, NE-
MTPS-I ES EM-I SD-I Complete cleaning, tightness checking and checking IR value of 6.6 KV HT bus 1A 1B and its bus ducts and Annual maintenance works to be carried out in respect of critical LT modules LT breakers in USSG -1A 1B, SSSG-1, NE-1, BMCC
Construction of New Bus Passenger Shelter in trichy main road near St. Theresa girls higher secondary School in Karur City Municipal Corporation
Supply fabrication and erection of 110KV ABS Structure and 110KV ABS WOE in 110KV Ponnapuram feeder Bus Switch at 230KV Udt SS
Supply fabrication erection of steel structure and 110KV ABS WOE in 110KV Udt Link II feeder Bus Switch at 230KV Udt SS
Construction of Modern Stainless Steel Bus Shulter in Kalavakkam Marg Apartment OMR Road East Side and West Side at Thiruporur Town Panchayat
Supply,Fabrication and Erection of New Steel structure and erection 1 No 230KV ABS WOE in 230KV Aliyar feeder Main Bus switch
Allotment of vacant shops of 18 nos in PT Dr MGR Bus Terminus at Koyambedu Chennai107 for a period of 3 Months
Providing Basement Ventilation System including power supply arrangements in the ongoing project of New Mofussil Bus Terminus at Kilambakkam near Vandalur Chengalpattu District
Widening and Strengthening to Government Roads including Providing Bus Lay Bye and Reconstruction of Culvert in Rasipuram (H) (CandM) Sub Division (SLM-30)
MTPS-I ES Circle EM-I Unit IV Annual maintenance works of critical LT modules and LT breakers in USSG-4A and 4B, SSSG-4, N E-4, BMCC-4A and 4B, VMCC-4A and 4B and SBMCC-4 LT buses during the AOH-2025-2026 in Unit IV
MTPSI ES EM-I SDIV Annual maintenance, checking of IR value of 4Nos LT buses cleaning of its modules in DM plant stage-I and II Erection of 4 way LT open type pillar box, modification, erection of mini pillar box with 250A switch fuse unit for safe
Dismantling loading transporting and unloading of LT spare switch gear panels MS Scrap and Bus bars from ETPS Chennai decommissioned unit to TTPS Tuticorin
ET 200S POSITIONING MODULE (Q3), SINAMICS S120 SENSOR MODULE SMC20 (Q3), Signal module for 3 SSI Encoders (Q3), PROFIBUS BUS CONNECTOR FASTCONNECT & PG (Q3)
MTPSI ES Circle EMI Division Annual maintenance works to be carried out in respect of critical LT modules and LT breakers in USSG 2A and 2B,SSSG - 2, NE 2, BMCC 2A and 2B, VMCC 2A and 2B and SBMCC 2 LT buses during the AOH 2023 in Unit II
Hiring human resource of total 08 nos. of Drivers (04 nos. of HMV drivers to operate 02 School buses of Zone XV and 04 nos. of LMV drivers to operate 02 nos. of Dog catcher vehicles of Zones XII and XV) for a period of 08 months (240 working days)
Strengthening, including Curve Improvement, Providing Bus Lay Bye and Reconstruction of Drain works in the Government roads of Thiruppathur (Highways) CandM Sub-Division(MDU-037)
Allotment of vacant 15 Nos of Service Shops and 12 Nos of Travel Agent office on rental basis in Chennai Contract Carriage Bus Terminus (CCCBT)
Providing Ventilation and Air Condition Facility to the Main Terminal Building of the Proposed New Mofussil Bus Terminus at Kuthambakkam Village Near Thirumazhisai Thiruvallur District
Custom Bid for Services - CPCLV25229 Availing Professional Services of a Registered Power Trader at Energy Exchange(s) of India, for purchase of Power through open access from IEX for CPCL Desalination Plant Similar Category Operation and Maintenance ... Electrical Buses
Civil Work for bus Section breaker along with supply of materials under PSDF Scheme in 230kv kavanoor ss of kavanoor operation division under Madurai Operation Circle
Allotment of vacant 4 Nos of General shops 1 No of Pharmacy and 1 No Clinic on rental basis in Madhavaram Mofussil Bus Terminus at Madhavaram
Improvements to Riding Quality and Reconstruction of culverts and Providing Bus lay bye on Government roads in Vellore (H), C and M, Sub Division - TVM-21
Providing Road Furniture Bus Lay By Repairs to the Damaged Metal Crash Barrier and Thermoplastic Painting Works in Chengalpattu H CandM Sub Division Jurisdiction. CHN 051
Implementation of Road Safety measures by providing centre median, bus lay bay and drain cum footpath in Vandalore- Mambakkam - Kelambakkam Road Km 0/0-18/6
Supply Installation Testing and Commissioning of CCTV and Integrated Building Management System in the ongoing project of new Mofussil Bus Terminus at Kilambakkam near Vandalur Chengalpattu District
Hiring of 05 Nos. of private Drivers for operating school bus in Zone 2 and 3 Lorry Stations for a period of 180 Days on Contract Basis
Strengthening of 230 Bus in the Existing aged conductor and Jumpers, clamps by New One - under PSDF DPR - II scheme at Arani 230/110 KV Sub Station
C18M250091 8411080111 USB ANNUNCIATOR/NUMERIC KEYBOARD, P/N: P0924WV, SCHNEIDER ITEM TEXT, 8411211293 FOUNDATION FIELD BUS MODULE-FBM228 4 PORT FOUNDATION FIELDBUS H1 MODULE P/N: P0922QS
Widening from Two Lane to Two Lane with paved shoulders and Strengthening Incl Bus lay bay Work in Govt Roads in Kangayam H CandM Sub Division TPR 088
Widening, Strengthening to Government Roads including Providing Bus Lay Bye, Construction of Retaining Wall, Drain and Reconstruction of Pipe Culvert in Rasipuram (H) (CandM) Sub Division (SLM-89)
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening and Bus Lay Bay Work in Government Roads in Kangayam H CandM Sub Division TPR 052