1,347 results • Best match
PACKAGE 84 Improvements, Improvements to Riding Quality, Curve widening, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Kumbakonam H CandM Subdivision
Design, Manufacture, Supply, erection and commissioning of 3 Nos 500 MVA ICTs along with replacement of bay equipments, RCC Gantry s and Strengthening of strung bus in existing 400 230 110 kV Sriperumbudur SS Civil work
Widening from Two Lane to Four Lane and Strengthening at km 8/8 - 11/4 of Kancheepuram - Thiruvathipuram road including Reconstruction and Widening of Culverts, Construction of Drain, Providing bus lay bay and paver blocks - TVM 103
Supply of SubStation Structure materials Bus Scheme materials Cables Safety Equipments Tools and Plants for introduction of 110 33KV System at 110 11 KV Irugur Sub Station 110 KV side in Coimbatore operation Circle of Coimbatore Region.
Widening from Two Lane to Four Lane and Strengthening at 9/8 - 14/6 of Arcot - Tindivanam Road (SH-5) including Reconstruction and Widening of Culverts, Providing Junction Improvements, Bus Lay bye and Center Median- TVM-91
Widening, Strengthening and Improvements to Riding Quality including Reconstruction of Pipe culvert and Reconstruction of Box Culvert and Bus Lay bye works in the Government Roads of Vathalagundu and Athoor (H) C M Sub Divisions (MDU 013)
Widening from Two Lane to Four Lane and Strengthening at km 45/4 - 54/4 of Arcot-Tindivanam road including Reconstruction and Widening of Culverts, Construction of Drain, Providing bus lay bay and paver blocks- TVM 102
Supply, Fabrication and Erection of steel structures, erection of equipments, strung bus, Supply and erection of station auxiliries etc., for introduction of 110/33 KV ratio with 1x16 MVA Power Transformer at Kadalangudy 110/11 KV SS.
Supply Fabrication and erection of Structures, providing Earth bore and earthmat, erection of equipments, , for 110KV Bus coupler breaker and providing cable duct, foundation for WC Column erection of Wc Tower with boom at Mettur 230 KVSS
Package 42 Widening Improvements to Riding Quality Construction of Retaining WallPaver block Bus lay bay including CD works to Government Roads in Ambasamudram H C and M Sub Division including upkeeping for a period of 60 months
Widening from Four Lane to Four Lane with Paved Shoulders and Strengthening at km 198/0 - 199/6 of Cuddalore - Chittoor Road including widening of culvert at Km 198/6 and providing bus lay bye -TVM-107
Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Bus Lay Bye, Pipe Culvert and up keeping the roads for a period of 60 months in Valapady C and M Sub Division (Package-13)
Supply, Fabrication and Erection of Steel Structures, Earth mat, Earth bore, Equipments, Panels, Strung bus, Cabling, Wiring and Station auxiliaries etc., for Enhancement of auto Transformer capacity from 2x100 MVA to 3x100 MVA at Thanjavur 230 KV SS
PACKAGE 93 Widening and improvements, Improvements to Riding Quality, Junction Improvements, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thanjavur H, CandM Subdivisio
PACKAGE 89 Widening and improvements, Improvements to Riding Quality, Junction Improvements, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Orathanadu H, CandM Subdivisi
Widening from Two lane to Four lane and Strengthening at Km.21 6 24 2 of Aruppukottai Perunali Sayalkudi Kadugusandai Mariyur Valinokkam road including Reconstruction of CD works Construction of Retaining wall, Centre Median, Bus lay bay Junc
PACKAGE 90 Widening and improvements, Improvements to Riding Quality, Bus lay bye, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Pattukottai and Peravurani H, CandM Subdivision
Widening from Two Lane to Four Lane and Strengthening at Km 22/4-29/8 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur Road (SH-60) including Reconstruction of Box Culverts, Construction of Box Culvert, Retaining Wall, Drain, Bus Lay Bye
Widening from Two Lane to Four Lane and Strengthening at Km 6/4-12/4 of Ariyalur-Muthuvanchery-Sirupuranthan-Karaikurichi Road including reconstruction of culverts, construction of drain, retaining wall, centre median and bus lay-bye-VPM-127
Widening from Two lane with Paved Shoulders to Four Lane at Km 0/8 2/5 of Madurai Palamedu road including Construction of CD Works, Drain, Retaining wall Centre median, Bus lay bye, Junction Improvements and Paver Blocks.
Package 40 Improvements to Riding Quality Widening the Curves Construction of Retaining Wall Paver block Bus lay bay including CD works to Government Roads in Ambasamudram H C and M Sub Division including upkeeping for a period of
Wdg and Impts IRQP Providing Centre Median Providing Bus Lay Byes Constn of Retaining Walls and including Up Keeping for a period of 60 mths on Govt Roads in Avinashi H C M Sub Dn Pac No 41
Urban Improvements - Widening from Four Lane to Four Lane with Paved Shoulders and Strengthening at km 196/8-198/0 of Cuddalore-Chittoor Road including Widening of Culvert, Providing Paver block, Bus Bay and Construction of Drain-TVM-4
Impts Impts to Riding Quality Constn of CD Works Providing Bus Lay Bye Providing Footpath Works and Incl Up Keeping for a period of 60 months on Govt Roads in Karur H C M Sub Dn Pkg No 66
Urban Improvements- Widening from Multi Lane to Four Lane and Strengthening at Km 105/900 - 106/500 of Pondy-Krishnagiri Road including Construction of Centre Median, Drain and Construction of Culverts, Bus Lay Bay and Paver Blocks -TVM-26
Widening from Two Lane to Four Lane and Strengthening at Km 4 0 by 17 4 of Palani Dharapuram Road SH8) including widening of culvert construction of culvert Centre median Junction Improvement Bus lay bye and Retaining wall Mdu136
Widening from Two Lane to Two Lane with Paved Shoulders and Strengthening Strengthening Reconstruction Of Box Culvert Construction Of Retaining Wall Junction Improvements and Bus Lay bye Works In Government Roads In Avinashi H CandM Sub dn TPR 053
Urban Improvements - Widening from Four Lane to Four Lane with Paved Shoulders and Strengthening at km 196/1-196/8 of Cuddalore-Chittoor Road including Widening of Culvert, Providing Paver block, Bus Bay and Construction of Drain-TVM-3
Wdg Two Lane Paver shoulders to four lane and Stg at km 7/8 - 10/0 of Thiruvalam - Katpadi - Venkatagirikottah Road including reconstruction of culvert Construction of Drain and Paver Block Providing Bus Lay Bye and Junc Imp-TVM-7
Wdg and Impts Impts and Providing Center Median Constn of Bus lay byes Wdg of Pipe Culvert and including Up Keeping for a period of 60 Months on Govt Roads in Kangayam H C M Sub-Divison Pac No 42
Wdg from Two L to Two L with Paved Shoulders and Impts at km 22 by 2 to 22 by 9 28 by 2 to 30 by 60 of Erode to Dpm road Incl bus lay bay including CD works
Widening from Two lane with Paved shoulder to Four Lane and Strengthening at km 3/0 - 7/0 of Kannamangalam - Arni Road including Reconstruction and Widening of Culverts, Construction of Drain, Center Median and Providing Bus lay bays -TVM-183
MTPS-I ES Circle EM-II Division SD-III Cleaning of the main busbars, vertical bus droppers, LT breakers panels, LT breakers and LT modules of LT switchgear, Auxiliary control panel and Electronic control panels at ESP Unit I to IV
MTPSI ES Circle EMI UnitII Providing shorting bars across the 15.75 KV bus in Unit-II for Turbo Generator testing during trial run after completion of capital overhaul 2024 and purging and filling of H2 gas in the Generator casing
Dismantling of existing damaged RCC Structures and Provision of 3 Nos of 230 KV AB Switch (WOE) Plinth for Providing New Steel Structures in 230 KV OKM,230 KV Udumalpet Link-I and Udumalpet Link-II feeders of Bus-I Isolators
Urban Improvements to widening End to End and Strengthening at Km 2 by 8 to 3 by 6 of Erode Perundurai Kangayam road including bus lay by at Km 3 by 2 4 and Construction of Storm water drain with footpath
Supplying, Loading and Transporting of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, etc. for provision of 110 KV bus coupler towards erection of 3rd 160 MVA, 230/110 KV Auto Tr. at Hosur 230 KV SS
MTPSI ES Circle EMII Division Cleaning of the Main busbars Vertical bus droppers LT Breaker panels LT breakers and LT modules of LT switch gear Auxiliary control panel Electronic control panels at ESP Unit II III during the respective Unit AOH2021
E-Tender for Supply ,fabrication and Erection of new steel structure and Dismantling ,Erection of existing defective 230 KV AB Switch(WOE) by new Switch in 230 KV Myvadi-Ponnapuram-III feeder of Bus-I under Improvement Scheme by works contract
18/2020-21 of SE GCC CBE
MTPS-I - ES Circle EMII SD-III Cleaning of the main busbars, vertical bus droppers, LT breaker panels, LT breakers and LT modules of LT switchgear, Auxiliary control panel and Electronic control panels at ESP Unit I ,II,III IV during the respectiv
MTPS-I ES EM-I Division Unit-I Dismantling of HT LT Terminal links of Generator Transformer-I, UAT IA UAT IB for conducting statutory testing of TG GT-I and internal cleaning, checking tightness healthiness of supporting insulators in 15.75 KV Bus
MTPSI ES EM-II SD-II - Replacement of existing 1 set of 230KV SF6 breaker having electro pneumatic type tripping and closing mechanism by new SF6 breaker having complete spring closing and tripping mechanism in transfer bus bay at 230KV switchyard i
Widening from Multi Lane to Four Lane and Improvements at km 0/0 - 4/0 4/9 - 7/8 10/0 - 11/0 of Thiruvalam - Katpadi - Venkatagirikottah Road including construction of center median, bus lay bye and reconstruction of culverts- TVM-68
SSE works, erection of earth raisers, equipments, etc., dismantling of exist.110kV bus, Supply and erection of 110kV cable accessories and laying of 110kV cable, for enhance. of existing 230 KV ICT cap. from 2x100 into 3x100 MVA at Ambattur 230 KV SS
Widening and Improvements Improvements to Riding Quality Construction of CD Works Protective Walls Junction Improvements Providing Bus lay bye and including Up Keeping for a period of 60 months on Govt Roads in Erode H C and M Sub Division Pkg 5
Widening from Four Lane to Four Lane with Paved Shoulders and Strengthening at km 199/6 - 201/0 of Cuddalore - Chittoor Road including Widening of culvert at Km 199/10, 200/4 and 200/6 and providing bus lay bye -TVM-108
1.Upgradation the Balaji Nagar Road Km 0/0-0/500 2.Upgradation the Aasai Nagar Road Km 0/0-0/210 3.Renewal the road from Perichipalayam (Bus Shelder) to to Mangacholipalayam road Via old AD colony Km 0/0-1/570
SSE works and Supply and erection of 230kV cable accessories and laying of 230kV cable etc., for enhancement of 400kV ICT Capacity from 2X315 MVA to 2x315 MVA with 1x500 MVA and Strengthening of the existing 230kV Bus at Thiruvalam 400kV SS.
MTPS-I ES Circle EM-II SD-III Cleaning of the main busbars, vertical bus dropppers, LT breaker panels, LT breakers and LT modules of LT switchgear at AHPH Units - I, II, IV during respective Unit AOH COH for the year 2025-26