Loading…
Loading…
2,180 results • Best match
Handpump Sub-Assemblies (Deepwell Hand Pumps
Handpump Sub-Assemblies (Deepwell Hand Pumps
Handpump Sub-Assemblies (Deepwell Hand Pumps
Handpump Sub-Assemblies (Deepwell Hand Pumps
Handpump Sub-Assemblies (Deepwell Hand Pumps
Handpump Sub-Assemblies (Deepwell Hand Pumps
Maintenance of electrical installation and fans including running maintenance of water supply pump set at Income Tax Department office and Quarters Aurangabad for year 2025 2026 Sub Head Electrical renovation up gradation in Income Tax Aurangabad
A/R & M/O E&M installation and operation of pump sets at central revenue colony, Salimpur Dumraha Patna. (SH - Replacement of street light/ flood light, supply of fan & light fitting and cable jointing work for service connection cable at CR colony Salimpur Dumraha, Patna)
BMC FOR ASH SLURRY PUMPS, ASH WATER PUMPS,INSTRUMENT AIR COMPRESSOR,SCREW COMPRESSOR,BOTTOM ASH HANDLING SYSTEM AND ASH BRICK MAKING MACHINEAT BARH STPP STG- I and II
GENERAL HOUSEKEEPING OF EQUIPMENT AND CIVIL MAINTENANCE WORK AT ERPL BARAUNI PUMP STATION
Renovation works of Group-A Valve operating platform at ERPL Barauni Pump Station
Replacement of a Section of Peripheral Boundary Wall at BKPL Barauni Pump Station.
INSTALLATION OF FIXED MEFG WITH FOAM TANK AT ERPL BKPL BARAUNI PUMP STATION
MISCELLANEOUS PUMPS HORIZONTAL FOR NPGC NABINAGAR FGD and BRBCL NABINAGAR FGD project
MOEI & fans and operation of pump set at CPWD Residential Colony and office Campus Punaichak Patna for the year 2026-27. (SH - Replacement of SMF type batteries for 10 KVA UPS installed at CPWD office Punaichak Patna.)
Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6417927 Dated : 10-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Repairing and Maintenance of old buildings and storage sheds at ERPL Patna Pump Station
Custom Bid for Services - Annual maintenance contract of Air compressor LPG vapor compressor Security air compressor Air dryer Jockey pump Cooling water pumps Cooling tower LPG pumps and all equipment installed at Inhouse STP Plant at Indane Bottling.. Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Supply of IPN Dosing Pumps and its Spares
SPECIAL REPAIR OF MAIN CABLE FROM POWER HOUSE TO PUMP HOUSE AND FROM POWER HOUSE TO OFFICERS ENCLAVE OF SIRSA AT KATIHAR MIL STN UNDER AGE(I) KATIHARSTATION UNDER AGE (I) KATIHAR
Dewatering Pumps as per IS 10001 (Q3)
Procurement of spares of KBL Make Pumps
PROCUREMENT OF KBL MAKE PUMPS CAPITAL SPARES
Spare of russian pumps(BAP and FAP)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Supply of AXGA164-CBD and OWS PUMPS
PROCUREMENT OF DOSING PUMPS AND ITS SPARES
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Dewatering Pumps as per IS 10001 (Q3)
Procurement of Dewatering Pumps for NTPC Kahalgaon
MOEI and fans i/c RMO Lift and water supply pump sets in Residential accommodation for Income Tax at Khajpura Phase-I & II, Patna SH:- Operation & maintenance through Outsourcing and Routine maintenance of 1 no. 30 KVA DG Set in residential and office building at Khajpura, Patna.
15 HP MONOBLOCK MOTOR (Q3), 7.5 HP SUBMERSIBLE PUMP (Q3)
Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6468371 Dated : 21-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reciprocating Pump (with motor) test rig ac motor & cone pulley, Experimental Set up for Porter Governor with motor/H. P. and reduction gear arrangement, BRAKING SYSTEM, DYNAMO METER (Prony, Rope and Brake), Multiple Plate Clutch, Multi stage ... stage Centrifugal pump Experience ...
EMERGENCY HYDRAULIC PUMP ASSEMBLY OEM:PH Part No:4P22 OR 4P24 MAKE PHOOLTAS OR EATON OR DENFOSS OR CAT PUMPS OR EQUIVALENT BRAND SUITABLE FOR PHOOLTAS MAKE UTV MACHINE