Execution of Electrical Installation work for providing power of 11KV Line-96 KM, 25KVA Plinth Mounted DT-1 No., SC-10 Mtr for the proposed RWSS point at BRAHAMANAKHANDI for PWS to BRAHMANAKHANDI under NIMAPARA Block.
Execution of Electrical Installation work for providing power supply to 11KV Line-0.01KM, 25KVA PSC Pole Mounted DT-1No, SC-10 Mtr for the proposed RWSS Point at EKCHALIA for PWS to EKCHALIA under PIPILI Block.
Construction of 500 meter 11KV line using 3c 300 sqmm XLPE UG cable with one no line DP with 90 degree cutpoint for power supply to plot no 48A 48B 48C 48D 48E at IE chandaka
CONSTRUCTION OF 11KV LINE WITH 55SQMM AAAC CONVERSION OF 11KV OVER HEAD LINE TO UG CABLE FOR CONSTRUCTION OF BRIDGE OVER SAMAKOI NALLAH ON NUTHIRAPASI TO RAJDANGA VIA SIARIMALIA DANGAPAL ROAD AT KHAMAR UNDER RWES ANGUL
Day to day HT n LT overhead line work (colony LT lines , 3.3 KV ,11KV, 33KV HT line) under Regional Substation, Kalinagar under Orient Area for a period of 02 year/ 730 days
Shifting and reconstruction of LT HT line with SS of Chhatia Salepur road from26.00 km to 27.613 km due to widening and strengthening of road under Chhatia Electrical section of Barachana Sub-Division
Shifting and reconstruction of LT HT line substation due to impvt such as widening and strengthening to Tangi Bye pass road from 0.00 km to 1.400 km Tangi in the district of Cuttack
CONSTRUCTION OF NEW 11KV LINE (MAJHAGAON TO RUPAIM) TO PROVIDE THE POWER SUPPLY TO SUNABEDA AREA DURING THE SHIFTING OF EXISTING LINE and C0NSTRUCTION OF CHERICHUAN TO JAMGAON ROAD (S.E. NO-53/23-24 OF TPWODL, NUAPADA)
Execution of Electrical Installation work for providing power supply to 11KV Line-0.9 KM, 25KVA Plinth Mounted DT-1 No., SC-15 Mtr for the proposed RWSS Point at UCHHUPUR for PWS to BRAHMANAKHANDI under NIMAPARA Block.
Supply, Installation, Testing and Commissioning of 1 no.100KVA, 11/0.4KV Plinth mounted S/S, 11KV 4pole structure ,11KV line DP with 3Cx35 sqmm 11KV XLPE cable for Power Supply to Boys Hostel at Govt. Polytechnic, Bolangir.
Shifting of 11KV and LT Line for improvement and widening of Road from Sai Temple square to Jagannath Temple Square and infront of HIG1 to VIIM123 FR Block 7 to 67
Shifting of TPWODL LT line near Bhainsalpara and heightening of 11KV overhead line at the Kiripsira parking stand under Hemgir section for smooth and safe working at Garjanbahal OCP, Basundhara Area.
Shifting of existing 11KV, LT line and Sub-station for widening and strengthening of Khariar to Sinapali Road (from0/00Km to 26/00Km) under Nuapada District for the year 2024-25.
AMC for erection of LT line at Departmental OB patch and various other locations of mines on as and when required basis for a period of 1 year at Bharatpur OCP.
Shifting of LT Line crossing the canal alignment in the village Dhamanagadia at RD 102.290Km, Village- Ranagundi at RD 107.009Km And 107.287Km of Left Bank Canal under Pkg. No-D I
Shifting of 11 KV and LT line near RCC drain on peripheral road in C.S Pur to Sailashree Vihar from 0.745 KM to 1.555 KM Labour stand for Sai Mandir Junction.
Shifting and Erection of 3Ph 3W 11KV, 3p4w LT line and Sub-station due to widening and strengthening of Parsumal Kishorenagar road from 0.0Km to 22.0km fot the year 2025-26.
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Erection of 11KV line with insulated conductor LT line with AB Cable and commissioning of SS for power supply to Cluster Shallow Tube well projects with installation of motor starter and its energisation including supply of all materials
Execution of Electrical Installation work for providing power supply to 11KV Line-0.7 KM, 25KVA Plinth Mounted DT-1 No., SC-10 Mtr for the proposed RWSS Point at NUASANTHA for PWS to NUASANTHA-II under NIMAPARA Block.
Execution of Electrical Installation work for providing power supply to 11KV Line-0.23 KM, 25KVA Pole Mounted DT-1 No., SC-10 Mtr for the proposed RWSS Point at TAMAPLO for PWS TO CHADEIGAON-I under NIMAPARA Block.
Widening and Strengthening to Damapada-Talabasta road from 0/000 Km to 16/525 Km in the district of Cuttack under State Plan Such as Re-Construction an Shifting of existing 11KV Line from Jatamunda to Kalaranta Chhaka.
Execution of Electrical Installation work for providing power supply to 25KVA Plinth Mounted DT-1 No., 11KV Line-0.45, Guarding-20 Mtrs., SC-10 Mtr for the proposed RWSS Point at SANKHUA (BADATARA-Z-II) under GOP Block.
Execution of Electrical Installation work for providing power supply to 11KV Line-0.78 KM, 25KVA Plinth Mounted DT-1 No., SC-15 Mtr for the proposed RWSS Point at SALANGA for PWS to BHANTIGRAM-I under NIMAPARA Block.
Construction of 33KV line by laying 33KV grade 3core 400sqmm XLPE UG cable with construction of 4-pole structure and 33KV Bay to extended power supply to the 1600KW GPS load of Multi Utility Complex and PG Students Hostel at SVPPGIP, Cuttack
Construction of 3p3w 11KV, 3p 5w LT line due to Widening and Strengthening of Hinjagula Kadalibereni Via Ganjada Dandasinga (Laxmanpur to Kadalibereni ) in the district of Angul for the year 2024-25.
Construction of 11KV, LT line and S/S due to strengthening and widening of Barihapur Basoi Kanakili Sanda road from 0/00 km to 6/00 km in the District of Dhenkanal.
Shifting and construction of 11KV 3ph3w line , LT line and Sub Station from Banapur main cannal to Antrakiari Road at Banapur, Dist Khordha for road widening work under RW Electrical Section, Bhubaneswar
Construction, erection of 11 kV LT line and installation of DTRs for power supply to R and R Colony at Garmunda and Solpali under ESO No.-II, Hirakud (Phase- I and II)
Construction of 11 KV, LT Line and S/S due to Improvement of NH -149 (Kulei) Manikamara-Jaka Road from 0/0 Km to 10/420 Km in the District of Dhenkanal
Shifting and Erection of 3ph 3w 11kv, 3p4w LT line and sub-station due to widening and strengthening of Handapa patrapada Road from 0.0km to 20.0 km for the year 2025-26.
Construction of 11KV, LT line under Pallahara Electrical Section due to Widening of Haripur Udayapur Road from 0km to 2.086km and 2.6km to 3.885km in Angul District for the year 2025-26
Execution of electrical Installation of 25 KVA 11/0.4 KV S/S along with HT line for power supply to the proposed RWSS Point at - RATHAPURUSOTTAMPUR (ZONE-A) under Electrical Section Satasankha under PIPILI block.
Shifting of 11KV HT Line (Telipali Feeder) Crossing over the left approach of the newly constructed H.L. Bridge (Under PMGSY pakage Number OR-29-163)5/380KM on Kardapal to Kenjheriapali Road Under ESO Birmaharajpur
Power Supply
Road work (Electrical shifting)
Execution of Electrical Installation work for providing power supply to 11KV Line-0.5 KM, 25KVA, 11/0.4 KV, DT-1 No. and SC-10 Mtr for the proposed RWSS Point at Kausalyapur for PWS to KAUSALYAPUR under PIPILI Block.
Execution of Electrical Installation work for providing power supply to 11KV Line-0.97 KM, Guarding -2 Nos (15 Mtr each), 25KVA Plinth Mounted DT-1 No., SC-10 Mtr for the proposed RWSS Point at PATELLIA under GOP Block.
Supply, installation, testing and commissioning of 11 0.4KV, 250KVA plinth mounted substation, 11KV DP on 11 mtr joist pole, 11KV line DP along with Construction of 3 phase 4 wire AB cable for Power Supply to GCPE, Kulundi, Sambalpur
Shifting and Erection of 3ph 3W 11KV, 3p4w LT line and Sub-Station due to widening and strengthening of Thakurgarha to Raniakata from 0/0km to 24/560km in the district of Angul
Construction of 3ph 3w 11kv, 3p4w LT line due to widening and strengthening of Badakera Maidharpur road from 15.0km to 23.732km (Beda chhak to Kansara) in Angul district for the year 2025-26.