Loading…
Loading…
5,870 results • Best match
For Shifting of 33 KV Line from Manduadih Thana to Modaila Tiraha, Varanasi under Deposit Scheme
Work for attending and rectification of faulty 33/11/LT Line and pole to resume supply interrupted due to natural calamities ( Cyclone, heavy rain etc) in coming summer in the area of SDO-1, EDD-1, Jaunpur.
REPAIR /MAINT OF EXTERNAL ELECT SUPPLY/ DISTRIBUTION SYSTEM OF LT LINE AND ALLIED WORKS, DG SET IN SG UNIT AREA SARSAWA UNDER GE AF SARSAWA
Shifting of HT/LT line and laying of underground cable for giving clearance for over bridge construct by UP State Setu Nigam Ltd. in the area of EDSD Daurala, under EDD-2 Meerut
Work related to transfer of 33KV line.
supply of 33kV line and bus isolator
Construction of 33 KV Interlink Line from SUBSTATION Maharajganj Tehsil to SUBSTATION Maharajganj Gramin and Pole insertion in 33 KV Line Harchandpur Distt Raebareli and Pole insertion in 33 KV Line Takiya Distt Unnao Under Business Plan 2024 25
Strengthing of Additional Source 33 KV Line between SS Sharda Nagar and Dhakerwa andReplacenment of Old Damage Conductor and Broken Poles of 33 KV Line of Mitauli Rural SS in area of EDD Mitauli Lakhimpur Under BP 24 25
Antarrastriya cricket stadium ganjari ke sameep Rohania se Gangapur Marg 5.680 KM ke chaudikaran avam sudridikaran karya hetu vidyut pole/LT/HT Line avam parivartak etc ke shifting ka karya.
Work of Cutting and Chopping of Tree Branches in Contact on LT/HT Line (As Per BOQ) in O and M Head under jurisdiction of EE, EUDD, Gomtinagar, LESA, Lucknow
Work of Estimate No 324, Fasing, Earthing, Plinth, Capacity form 100 KVA to 250 KVA, ABC Conductor, LT Line, HT Line, Connection of Indus tower at Village Sambhahera Un S/d Jansath.
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/S Bhunda to 33/11 KV S/S Barawan and 132 KV S/S Meja Road to 33/11 KV S/S Meja Tahasil Dist. Prayagraj in Business Plan 2024-25 on Semi Turnkey Basis under EDC-I Praya
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/S Babaganj to 33/11 KV S/S Dhahilamau 132 KV S/S Bhupiamau to 33/11 KV S/S Rupapur and 132 KV S/S Badalapur Jaunpur to 33/11 KV S/S Dhakwa Dist. Pratapgarh in Business
Work of 33 KV AND 11 KV Line repair and Maintenance Under EDD-Chitrakoot
BP 25-26 33 KV with 11 KV Line construction work under EDD Kaushambi
work of 33 KV AND 11 KV Line repair and Maintenance Under EDD-Rajapur
Construction of 1x5 MVA Ss. and associated 33-11 KV line in Distt.-Mainpuri.
33 KV and 11 KV Line shifting due to Road widening in Distt.-Etawah.
Dismantling of 33KV line from 132 KV S/S Boner to 33/11 KV S / S Quarsi, Ramghat Road, Aligarh against Estimate No. 75/2020-21 sanctioned under Business Plan in the area of EUDD-II, Aligarh
Construction of HT LT line and 250 KVA substation at 11 KV Faizullaganj against Business plan package No 125,126 127 area of EUDD Sitapur road Transgomti LESA Lucknow
Construction of LT line, S/F of LED street lights and construction of 1 no. mini boring with submersible pump at SMY Kemri (Mandi Samiti Bilaspur) District Rampur
Under EDD-II, Mughalsarai, under the jurisdiction of EDSD-I, Chandhasi, HT / LT line, spacer, damaged insulator, replacement of crossarms, replacement of dilapidated ABC and dilapidated guarding works
Other miscellaneous works under Business Plan 2024-25 under EDD-Ist, Chandauli, LT Line (work of replacement of damaged wire, cable, damaged VCB) (on semi turn-key basis)
For Replacement of old and damaged bare conductor of LT line into ABC and installed new pole in long span near Reserve Police line at Kalli Paschim Lucknow
For HT/LT Line Maintenance Work to Avoid Any Electrical Accident and Ensure Protective Measures Before Shivratri Mela (Kawad Yatra-2022), Under Electricity Urban Distribution Division-V, Meerut.
For HT/LT Line Maintenance Work to Avoid Any Electrical Accident and Ensure Protective Measures Before Shivratri Mela (Kawad Yatra-2022), Under Electricity Urban Distribution Division-IV, Meerut.
Other miscellaneous works under Business Plan 2024-25 under EDD-IIIrd, Sakaldiha, LT Line (work of replacement of damaged wire, cable, damaged VCB) (on semi turn-key basis)
REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND of Ratanpura and semarijamalpur S/S under EDD 2nd Mau.
Quantum of work involved in replacement of damaged pole and HT/LT line (Due to Daiveey Aapada) in the area of under E.D.S.D.-I, EDD-III, Purwa, Unnao
REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND IN THE AREA OF EDSD-Muhammadabad UNDER EDD-2nd MAU
REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND IN THE AREA OF EDSD-Madhuban UNDER EDD-3rd Ghosi
REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND OF HALDHDHARPUR AND AILAKH S/S UNDER EDD-2ND MAU
For HT/LT Line Maintenance Work to Avoid Any Electrical Accident and Ensure Protective Measures Before Shivratri Mela (Kawad Yatra-2022), Under Electricity Urban Distribution Division-I, Meerut.
Repairing of 3 No 16 Mtrs High Mast Light Replace of LED fitting on place of sodium fitting Repairing of LT Line and cabling work at NMY Jangipur
Under the deposit scheme the Work of shifting 33 KV, 11 KV, LT line and transformer due to proposed over bridge at Jhingaura railway crossing under EDD-Mirzapur
WORK FOR REPLACEMENT OF JARJAR AB CABEL/JARJAR TAR OF LT LINE UNDER JURISDICTION OF EDD II GOPIGANJ BHADOHI IN AVAILABILITY OF ADITIONAL FUND IN B.P. 2023-24
Work of shifting the LT line coming in the road widening route from village Chandrapura to main road Garautha road under 33/11 KV power sub-station Garautha
For HT/LT Line Maintenance Work to Avoid Any Electrical Accident and Ensure Protective Measures Before Shivratri Mela (Kawad Yatra-2022), Under Electricity Urban Distribution Division-III, Meerut.
For Maintenance work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-V and VI, Under EUDD-III, Meerut.
Under EDD-II, Mughalsarai, under the jurisdiction of EDSD-II, Padao, HT / LT line, spacer, damaged insulator, replacement of crossarms, replacement of dilapidated ABC and dilapidated guarding works
Other miscellaneous works under Business Plan 2024-25 under EDD-IInd, Mughalsarai, LT Line (work of replacement of damaged wire, cable, damaged VCB) (on semi turn-key basis)
REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND IN THE AREA OF EDSD-Doharighat UNDER EDD-3rd Ghosi
Construction/repair work of damage wire, pol and transformer due to storm to 33 KV, 33/11 KV S/S of HT/LT Line under EDD-I, Ghazipur
Construction work of new LT Line at 87 places under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis (under 20 crore work plan)
For releasing of new connection and construction of HT/LT line Applied in Jhatpat/Nivesh Mitra Portal consumer in the area of EDSD-II UNDER EDD-3 MEERUT
work of replacement of dilapidated AB cable/ dilapidated wire/ installation of pole/ additional circuit on the LT line in the area of EDD Muradnagar on semi-turnkey basis.
For HT/LT Line Maintenance Work to Avoid Any Electrical Accident and Ensure Protective Measures Before Shivratri Mela (Kawad Yatra-2022),Under Electricity Urban Distribution Division-II, Meerut.
WORK OF bifurcation of 11 KV overload feeder and strengthening of LT Line in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.
Construction/repair work of damage wire, pol and transformer due to storm to 33 KV, 33/11 KV S/S of HT/LT Line under EDD-III, Saidpur
For Shifting of 11 KV, LT line from Bhitari Mod Lahartara to Kameshwar Mahadev Mandir, Bhitari, Varanasi (Part-I) under Deposit Scheme (With GST) under UECD-I, Varanasi