Loading…
Loading…
5,870 results • Best match
Maintenance of 33/11 KV line at 33/11 KV S/S Khushalipur
Re-construction of 11 KV Line at 33/11 KV S/S Khushalipur
construtionc of 11 kv line and replacement of jurjur wire and other works
Work of Shifting and Guarding and replacement of old and damaged 11KV line of Primary school and Junior High School under Naveen Zila Vidhyut Vikas Nidhi Yojna under Electricity Distribution Circle Sambhal.
CONSTRUCTION OF A-TYPE KENDRIYA VIDYALAYA AT BHADOHI, UP (SH : CONSTRUCTION OF INTERNAL BOUNDARY WALL FOR RESIDENTIAL BLOCK AREA AND HT LINE AREA AT KV BHADOHI CAMPUS) Subwork/Packages: CONSTRUCTION WORK
Welding of damaged/dilapidated round pole of LT/HT line and cutting of branches of trees coming on LT/HT lines on Kanwar Yatra route under EUDD-I, MZN
Welding of damaged/dilapidated round pole of LT/HT line and cutting of branches of trees coming on LT/HT lines at Kanwar Yatra route under EUDD-III, Muzaffarnagar
Welding of damaged/dilapidated round pole of LT/HT line and cutting of branches of trees coming on LT/HT lines at Kanwar Yatra route under EUDD-II, MZN
Tender for Constrction/Shifting of 11KV/HT Line for given New connection defferent places in Diposit Yojana against EDD -II, Hardoi under jurisdiction of EE, ED D-II,Hardoi.
Connection of PTW with Rural Feeder, Gaurd and laying of UG cable from HT line in the area of Sub-Division Jevar under the Jurisdiction of EDD-IV, Noida
Construction of Temporary LT Line, HT Line, Installation of LED Street Light Fittings and Providing Camp Connection, 11/0.4 KV, 2x400 KVA Temporary Sub-Station in Arail area and Parking Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, 33 KV LINE AUGMENTATION WORKS AS ERECTION OF TOWER FOR 33 KV LINE JASPURA UNDER BUSINESS PLAN 2026-27 AGAINST TENDER NO 23..
Work of Construction and Bifurcation of 11 KV Line, Capacity enhancement and Construction of 11/0.4 KV S/s, Strengthening of 33 KV/11 KV/LT Lines and replacement of 33 KV/11 KV VCB etc under the EUDD,Katghar-MBD on Semi-turnkey basis underB.P.25-26
Tender No. 51(W)/2018-19 Regarding Cutting and Choping of tree branches of 33 Gejha Line (Raghunathpur to Jani) and 11 KV Line of 11 KV Feeder Siwal, Jani and Ukhlina feeded from 33/11 KV sub-station Raghunathpur in the area of EDSD-III, Bhola of und
Increasing Capacity for Power Transformer of 33,11 KV S.S. Goithaha, Replacement of 33 VCB, Replacement of Component in Different 33,11KV S.S. Interlinking of 33KV Line in Switchyard, Replacement of earth strip and construction of earth pit
Construction of New 33 KV Underground Line on turnkey basis from 132 KV Substation Ledhupur to 33/11 KV Saktipith Till Tapping point of 33KV Line in District Varanasi Under Purvanchal Vidyut Vitaran Nigam Limited, Varanasi
For the work of 11KV and 33KV Line strengthening and Maintenance for uninterrupted supply in premises of Veterinary Collage, Mathura in the area of EE, EUDD-I, Mathura in the jurisdiction of Superintending Engineer, EUDC, Mathura.
Maintenance of LT and HT line emanating from 33/11 KV Substation Gidahi to avoid tripping and any mishappening on New Basti, Old Bast-I, Old Basti-II and Plastic Complex feeders on the occasion of Durga Pooja, Dushehara, Diwali under EDD-I, Basti.
The work for shifting of 33KV, 11KV and LT line from Chaukaghat Tiraha to sankul road and andhra pul chauraha due to abstrcting in traffic of road
Repairing of LT line, S/E of damaged steel tubular poles, S/I of LED street lights and repairing of LED street lights at NMY Amroha (Amroha)
WORK FOR REPLACEMENT OF JARJAR AB CABEL/JARJAR TAR OF LT LINE UNDER JURISDICTION OF EDD I BHADOHI IN AVAILABILITY OF ADITIONAL FUND IN B.P. 2023-24
Release the different new connection, Increase , decrease load and HT and LT Line Shifting etc. (running) Sanctioned Estimate/Package in deposit scheme under Electricity Distribution Division Hasanpur.
Providing PVC Insulated LT Line for street light network in missing area of Phase II and III at IA Masuri Gulwathi Road under Atal Industrial Infrastructure Mission
For the Work of Business Plan 2023-24 for the Installation of Additional Distribution Transformer and Making of LT line at Different Sites Under EUDD-V, Meerut.
For Safe Cartage of Damaged Transformers from Site to Store and OK Transformers from Store to Site, Under EE 11 KV and LT Line South Madhavpuram, Meerut.
Business Plan under Electricity Distribution Section-Dibai Replacing and strengthening the worn out wires of LT line at various 33/11 KV power substations in 2025-26
Janpad Sambhal me mau - kathair se fattehpur shamsoi hote huwe chandausi Marg (Anya Jila Marg Length 14.20 Km) par HT/LT Line par pole shifting ka karya
Carriage of medium power damaged/repaired distribution transformers of different capacity under the jurisdiction of Electricity Urban Distribution Division-(Technical) 11 KV and LT Line Network, Moradabad.
Work of istalation of additional transformer and construction of New LT line in BP 2024-25 in area of 33/11 kv sub stations under EDD Dumariyaganj
Work of shifting HT/LT line which is obstructing road widening from Phalouda cut to Purkaji block on NH-58. in the area of EUDD-Jansath, Muzaffarangar
Construction/repair work of damage wire, pol and transformer due to storm to 33 KV, 33/11 KV S/S of HT/LT Line under EDD-Zamania
For Supply of necessary materials to complete the work of 33 KV, 11 KV and LT line, distribution transformer installation/Increasing capacity work Under EDD-4 Kiraoli.
Looping and Chopping of tree branches of HT/LT line at 33/11 Sub Division FCI under jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
For Maintenance Work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-II, Meerut Under EUDD-I, Meerut.
Dismantling of already dead, unused Poles, HT AND LT line in Plot No. H-02, Phase-2 at Industrial area UPSIDC under Jurisdiction of EDD-Sandila, Hardoi.
Quantum of works involved in 11 KV and LT Line of Jhatpat/Nivesh Mitra connection and other deposite work under EDD Divison-Magarwara, Unnao against deposite work.
Work of Repairing and Restarting the 33KV/11KV/LT Line and transformers damaged due to storm/vehicles and other reason in the working area of EDD-Phoolpur
For the Shifting work of Existing 11 kv LT line and Transformer due to widening of Road from Nanda Nagar police chauki to Shamsher gate Distt. Gorakhpur
For Maintenance Work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-VIII, Meerut Under EUDD-I, Meerut.
Work of Strengthening and Protection of Distribution Transformer under Business Plan 2026-27 in the Area of EUDD-11 KV and LT Line, North-Saint Lukes, Meerut.
Carriage of medium power damaged/repaired distribution transformers of different capacity under the jurisdiction of Electricity Urban Distribution Division-(Technical) 11 KV and LT Line Network, Moradabad
REGARDING CONSTUCTION OF NEW 11 KV LT LINE, RE-ARREGMENT OF OLD LINE AND RELESEING OF NEW CONNECTIONS UNDER DEPOSIT SCHEME AT 33/11 KV SUB-STATION
WORK OF REPAIRING OF DAMAGED S.T. POLES OF HT/LT LINE BY WELDING AT DIFFERENT SECTORS/AREAS IN THE JURISDICTION OF EUDD - X UNDER EUDC-III, GHAZIABAD.
Regarding Construction of 11 KV and LT Line and other works in the scheme of full deposit work in the area of EDSDII, Pallavpuram under EDDIII, Meerut
WORK FOR DISTRIBUTE THE LOAD OF ELEVEN KV FEEDER TO NEW FEEDER CHANGE THE OLD CONDUCTOR OF ELEVEN KV AND LT LINE AND CHANGE THE DAMAGE POLES
Short tern E-Tender for Looping/Chopping of tree branches in 33 and 11 KV LT line in B.K.T S/S, Under the area of EDD-B.K.T.
Construction of new 33 kv line of length 3.7 km for 33/11 KVS/S SaraiTalfi
33 KV LINE RENOVATION WORK AFTER TPMO TO GANTRY AT TRANSMISSION SIDE 220/132 KV SUBSTATION
Construction of 33 KV line for the Substation Rohana Kala (Muzaffarnagar) from 132 KV Substaton Badhikala.
for the work of reconstruction 11/33 Kv Line fallen due to Deviye Appda and Other..