Loading…
Loading…
385 results • Best match
AR and MO various roads under PWD Division South West Road -I , during 2024-25. (Sh- Repair / replacement of pavers, kerb stones, bollard, and construction of Toe wall and other miscellanious works from Aruna Asif Ali road to Harcharan Bag
A/R and M/O to various Roads under Division South Road - II, PWD, New Delhi during 2024-25. (SH_ Painting of kerb Stone, MS Railing / Grills, Toe Wall etc. under jurisdiction of Sub Division- II and III for 2nd Cycle).
Improvement of Central Verge with Precast RCC Crash Barrier under Shalimar Bagh Elevated Flyover, Grass paver Block and Toe wall at Ring Road from Azadpur to Britannia Flyover and fixing of polycarbonate sheet at Wazirpur Flyover under PWD Division N
Construction of Crash Barrier wall in central verge at Vikas Marg after Yamuna Bridge stretch and RCC toe wall at Yamuna Bridge to Delhi Sachivalaya Loop under Sub-Division East Road-IV of PWD Division East Roads, Delhi during 2022-23
A/R and M/O various road under PWD division south west road-I during 2023-24. (SH- Improvement of central verge with RCC crash barrier and upliftment of toe wall at BJ Marg under sub division-I, New Delhi).
A/R and M/O to various roads under PWD Division South East Road-1 of Sub-Division SER-12 during 2025-26 (SH - Repair of drain of Mathura Road and Toe Wall around the Greenbelt and island at various locations).
REPAIR AND MAINTENANCE OF INFRASTRUCTURE ASSESTS IN R-II DIVISION DURING 2021-22. SH - REPAIR OF EXISTING OLD PLASTER IN TOE WALL OF PARKS INFRONT OF 99 TO 79, 64 TO 58 AND BACK SIDE OF FIRE STATION, JOR BAGH
A/R and M/O of various PWD Road under Division SER-1, Sub-Division SER-14. during 2026-27 (SH- Repair of Toe wall at Jagganath Marg, Missing Railing, Concertina coil, Barapullah Side RCC wall and other misc. work).
A/R and M/O of various PWD Road under Division SER-1, Sub-Division SER-14. during 2026-27 (SH - Repair of Toe wall at Jagganath Marg, Missing Railing, Concertina coil, Barapullah Side RCC wall and other misc. work)_Recall
EOR to GBSSS SU Block Pitampura Delhi. School ID 1411017 EOR ID 20241807 SH Repairing and painting of pump room Toe wall P F Concertina Coil and painting of grill at boundary wall Cleaning and repairing of open surface drain.
Upgradation work in various GOBs Class ABC bungalows & Srt Qtrs under 1-I Sub-Division during 2026-27 (SH: Construction of toe wall, renovation of one room of Srt Qtr & other miscellenous civil work at bungalow No 10 Akbar Road)
Construction of protection wall and raising and construction of inspection path between intermittent location from RD 0m to RD 2700m on both banks of Mungeshpur Drain
Construction of protection wall and raising and construction of inspection path between intermittent location from RD 0m to RD 2700m on both banks of Mungeshpur Drain
Providing and laying of stone pitching with gabion to prevent soil erosion at Embankment between Delhi gate Regulator and ITO Barrage at right bank of river yamuna.
For supply of Manpower as per BOQ Under MW to providing and placing of Ramp Along with the Retaining wall inside Tughlaqabad fort as an easy Approach to Toilet blocks, new Delhi
Construction of Pump House, Retaining wall and raising of existing RCC drain including footpath from Pump House to Community Centre at Bhalswa Dairy under Sub Division NR-14 of North Roads Division
Development of Bio-diversity Park at Tughlakabad SH-Construction of R.C.C retaining wall near ESI bus stop to near gate no. 1 along Maa Anandmayee Marg in Bio-diversity Park, at Tughlakabad
A/R and M/O to District Court, Rohini Delhi during 2022-23 (SH- Civil Repair and Re-Strengthening of RCC Stair Flights, Basement Ceiling and Retaining Wall in Lawyers Chamber Block).
A/R & M/O various GPRA flats at Sector-13, R.K. Puram, New Delhi dg 2025-26 (SH: Improvement of underground sump area & raising of toe wall for protecting contaminated water and replacement of all cracked/damaged C.I. & LA pipe with its fittings. ... of toe wall for ...
Improvement of Peripheral road along Humayon Tomb from Mathura Road (Near Sabj Burj) to Dam Dama Sahib Gurudwara in Ward No.55-S, Central Zone SH Improvement of footpath by pdg. CC Interlocking paver tiles, kerb stone, side toe wall, painting etc.
A/R and M/O to various roads under PWD Division West Road-2, Delhi during 2023-24. (SH- Repair of footpath, Toe wall from Pillar No. 549 to Pillar no. 626 at Rohtak Road NH-10 under Sub Division WR-22).
REPAIR AND MAINTENANCE OF INFRASTRUCTURE ASSETS IN R-II DIVISION DURING 2021-22. SH -REPAIR OF TIKONA PARK INFRONT OF S.J.ROAD SERVICE CENTER, TOE WALL OF VEER SAWARKER PARK AND INFRONT OF D-BLOCK LODHI COLONY IN THE JURISDICTION OF SUB DIVISION-III(
Aesthetic and Functional improvement of Pankha Road (ID 2027) from Kali Mata Mandir to Dabri Circle i/c C/o boundary wall along nalla, service road, toe wall with railing, footpath, central verge, bell mouth etc. under Sub Division-21, Division- SWR
A/R and M/O PWD Roads under Sub. Division-3 of Division (C and ND)- Roads during 2021-22. (SH- Repairing of toe wall at Ring Road infront of Samadhis (Sadaiv Atal, Vijay Ghat, Shantivan, Shakti Sthal and Rajghat). 1st RECALL
A/R and M/O to Residential Building at D.A. Flats, Nimri Colony, Ashok Vihar, Delhi under Sub Division North West B-6, PWD (SH- Construction of existing Broken Boundary Wall, Damaged Park Toe Wall and 2 Nos. Toilets for Guards) (Modified)
A/R and M/O to various roads under Sub Division-I of Division South Road-II, PWD during 2024-25. (SH_ Repair of damaged Toe wall and footpath on August Kranti Marg and improvement of drainage system at Gautam Nagar Road).
EOR to Govt. Girls Senior Secondary School, Hastsal Village, New Delhi. SH- Construction of store room 01 nos. shed 2 nos, behind old building. Toe Wall in Park and Ramp for new Building Block, Renovation of all toilet and guard room. Fixing granite
A/R and M/O Roads under North Roads Division, PWD, Delhi during 2025-26. (SH- Repairing of footpath, toe wall, culvert, chamber, drain wall, providing jersey barriers and covering of open drain on Mall Road Extension under Sub Division NR-12)
A/R and M/O Drains and Bunds During the Year 2021-2022. Construction of R.C.C. retaining wall in B.D.O. office store, footpath shed and repair of old store at Najafgarh (Balance Work).
Restoration of existing stone pitching at Civil Military drain in D/s Shanti van Red light and construction of R.C.C Retaining wall along with chain link fencing in U/S of DJB regulator.
PROVN OF RCC RETAINING WALL AT SHANKAR VIHAR INTEGRATED SPORTS COMPLEX AND CERTAIN MINOR WORKS UNDER AGE B/R-I, B/R-II AND AGE E/M OF GE (SOUTH) DELHI CANTT-10
Construction of back side retaining wall /boundary wall, basket ball court, badminton court, kids play area, path way, carriage way etc, 2nd phase work for Atal Asha Home MCD Building Narela, Delhi - 110040).
AR and MO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NORTH WEST ROAD 13 DURING 2021 22 SH PROVIDING and FIXING MS SCREENING ON RETAINING WALL OF ZAKHIRA UNDERPASS
Construction of Reinforced Cement Concrete Retaining Wall along IandFC drain from Kali Mata Mandir to FOB near Janak Cinema on Pankha Road (ID 2027) under Sub Division-21, Division- SWR-II, PWD, New Delhi.
AR and MO to various roads PWD Division NW R 1 dg 2022 23 SH Improvement of Central Verge with RCC Toe wall crash barrier at Maharaja Nahar Singh Marg Road No 37 and TV Tower Road Pitampura under Sub Division NW R 12
A/R and M/O Various roads under PWD Division South East Road-1 during year 2025-26. (SH - Repair of Toe wall, fixing railing and misc work for safety zone near Govt. girls school at Raja Dhirsen Marg under Sub-Division SER-11).
NOW Repair and maintenance of infrastructure Assets in CP division during 2024 25 SH Repair of footpath, Parking Toe wall, Channel of roads and allied civil works at Block A B C G H and K Block at outer to inner circle Connaught place.
A/R and M/O to various roads under PWD Division South West Road-1 during 2021-22. SH- Repairing of damaged boundary and Toe wall, left side Ring road Towards Mayapuri to Naraina, providing and Fixing missing MS Grills near Ware House Scheme Kirti
EOR to Govt. Girls sr. Sec. School, Hastsal Village, New Delhi. SH Construction of store room 01 nos., Shed 2 nos. behind old building, Toe Wall in Park and Ramp for new Building Block, Renovation of all toilet and guard room, Fixing granite on stage
Repair Rectification of seepage in Toilets of New building block G 3 SPS Replacement of damaged wall tiles and false ceiling of Toilets P F grills and gates at staircase Top floor P F chain link fencing ic low height toe wall around play area
A/R and M/O Drains and Bunds During the Year 2022-2023.Construction of Protection wall on Left Bank from RD 5800m to RD 6550m of Mungeshpur Drain
A/R and M/O Drains and Bunds During the Year 2021-2022. Construction of Protection wall on Right Bank of Mungeshpur Drain from RD 4450m to RD 5200m.
A/R and M/O Drains and Bunds During the Year 2021-2022. Construction of Protection wall on Right Bank of Mungeshpur Drain from RD 8250m to RD 9000m.
A/R and M/O Drains and Bunds During the Year 2021-2022. Construction of Protection wall on Right Bank of Mungeshpur Drain from RD 3700m to RD 4450m.
INSULATING PLATE to M/s.REPL Part No. S2186 and to Drg No AM-400085-P1 OR PROTECTION WALL TO M/S.AAL PART NO G2186 AND TO DRG NO 9910646701001.
Repairing of Toe wall and railings under jurisdiction of Janpath lane area.
A/R and M/O to various roads under Division SER-1 during 2025-26. (SH - Repair work of R.R retaining wall on bhogal ROB at Mathura road under Division SER-1, Sub-Division SER-14).
A/R and M/O Drains and Bunds during the Financial Year 2021-22.Construction of Protection wall on Right Bank of Mungeshpur Drain from RD 3700m to RD 4450m.
A/R and M/O Drains and Bunds during the Financial Year 2021-22.Construction of protection wall on L/B of B.C. Drain from RD 6200m to RD 6500m.
A/R and M/O to 72 DA Flats, New Mahavir Nagar, Vikas Puri, New Delhi. During 2024-25. (SH- Provision of new main gate and guard room, grit plaster on boundary wall and toe wall, repair to grills, cleaning of drains and other misc. civil works).