Loading…
Loading…
5,625 results • Best match
Restoration of Rain damages on Sandhi Mani Sirh Sarol road km 0/0 to 14/00 (Sub Head Construction of PCC retaining wall at Rd 32/500 to 32/518.10 and 32/460 to 32/511) Against PDNA-2023
C/o link road Manjher to village Panga Km. 0/0 to 2/0 (SH- C/o Retaining wall, C/o 900mm dia hume pipe culvert and C/o 3.00 meter span R.C.C. slab culvert at RD 0/480).
Restoration of Rain damages on Chamba Khajjiar road km 19/00 (Sub Head Construction of PCC retaining wall at Rd 15/620 to 15/644 , 16/030 to 16/046 and 17/600 to 17/616 ) Against PDNA-2023
MPS 2025 1050 Repair of RR Damages on Khali Mod Surah Doghari Shikaran road km 0 000 to 7 100 SH Construction of Retaining wall in PCC 1 4 8 at Rds 2 360 to 2 374 point 50
Sewerage Scheme to Arki Town in Tehsil Arki District Solan HP SH Construction of retaining wall in front and back side of newly constructed sludge beds and construction of 2nd class brick masonry in Boundary wall in 1st call
Restoration rain damages on Banethi Bagthan Rajgarh Chandol road Km 48/00 to 87/0 (SH Construction of Retaining wall between km 59/450 to 59/470 and crash barrier between km 59/350 to 59/500 under PDNA ).
Restoration of rain damages on Koharchhan Junction to Amban da Paddar km 000 to 4000 SH CO Retaining wall at RD 2500 to 2515 2550 to 2562 2280 to 2593 VShape drain in km 2500 to 2652 Under PDNA2023
SR to various non residential buildings under Division NO.III Shimla. SH Repair of retaining wall, roof and pavers, PL storage tank and other minor repair work in Deptt. of Environment, Science Technology and Climate Change at U.S. Club Shimla.
C/o Breast wall with V-shape drain at RD.29/015 to 29/165 in both sides
SH C/O Breast wall at RD 0/105 to 0/140 and 0/395 to 0/410
C/O PCC Breast Wall at Rd 0/230 to 0/245 and 0/280 to 0/300
Construction of PCC Breast wall at RD.66/426 to 66/442 and 68/900 to 68/915
(Sub Head -Construction of Breast wall for protection of Cow shed at Km 0/720 to 0/733).
Construction of PCC Breast wall at Rd.0/040 to 0/080 and 1/050 to 1/090
C/O Breast wall at RD 0/200 to 0/245 and 0/295 to 0/318) PDNA
Construction of breast wall at Km. 4/960 to 4/975 under BSP deposit SID BSP/2024/806)
(Sub Head -Construction of Breast wall for protection of Cow shed at Km 0/733 to 0/743).
Construction of PCCToe wall alongwith Wire crated Breast wall at RD 0-610 to 0-700 under PDNA
Construction of PCC Breast wall at Rd.34/540 to 34/560 and 44/100 to 44/130
(Sub Head -Construction of Breast wall at Rd. 15/800to 15/809) under SDRF deposit SID.SDF/2022/409).
Construction of PCC Breast wall at Rd.0/435 to 0/450 and 2/980 to 2/992
Construction of Breast wall at RD 3/020 to 3/030) D.C. Deposit Scheme ID-SD/2024/64.
REPAIR AND CLEANING TO SEWAGE LINES MANHOLES CHAMBER SEPTIC TANKS AND SOAKAGE WELL AND REPAIR TO RETAINING WALL DRAINS AND FENCING AT KARCHAM AND POARI IN THE AREA OF AGE B/RI POOH UNDER GE 863 EWS
M/R to GPRA at Longwood and Craigdhu Shimla during 2023-24. SH: Repair/reconstruction of existing damaged stone masonry gravity retaining wall with plum concrete wall including carrying out related items back side of servant quarters at Craigdhu, ... gravity retaining wall with ...
Construction of PCC Retaining walls at R.D. 47/270 to 47/305 (Between R.D. 47/270 to 47/370)
Improvement of blind curves and construction of retaining walls at various RD.s between Km. 6/0 to 10/0
Construction of PCC Retaining walls at R.D. 0/540 to 0/590 (Between R.D. 0/540 to 0/765)
Construction of PCC Retaining walls at R.D. 2/300 to 2/405 (Between R.D. 2/300 to 2/500
Construction of PCC Retaining walls at R.D. 0/195 to 0/215 (Between R.D. 0/150 to 0/400)
Construction of PCC Retaining walls at R.D. 44/620 to 44/650 (Between R.D. 44/600 to 44/650)
Construction of PCC Retaining walls at R.D. 1/190 to 1/240 (Between R.D. 1/090 to 1/250)
C/O 2.00mtr span RCC slab culvert at RD 1/680 and C/O Retaining walls at various RDs
Removal of formation deficiencies, construction of retaining walls, including metalling and tarring, construction of V-shape drain and parapets.
Construction of PCC Retaining walls at R.D. 3/650 to 3/680 (Between R.D. 3/650 to 3/750
SH C/O retaining walls and hume pipe culvert at various RD in Km 0/0 to 1/0
Construction of PCC Retaining walls at R.D. 3/680 to 3/720 (Between R.D. 3/650 to 3/750)
Construction of PCC Retaining walls at R.D. 47/325 to 47/370 (Between R.D. 47/270 to 47/370)
Removal of muck debries from nallah in vilalge Motla to identifed dumping site including construction of dumping sites and protection wall to water tank near village motla in Tehsil Sihunta Distt. Chamba HP
R/R damages on Kashmirpur bridge on Panjehra Deoli road km 0/0 to 5/00 (SH C/O protection wall with wire crate and Channelization of bridge span at RD 1/080).
A/R and M/O Govt Sr. Secondary School Khanety (Kotkhai) P/L 60mm Thick Inter Locking Paver Block in School Play Ground and Protection Wall at the Back side of MIDM Shed
Restoration of rain damages of LIS to GP Malyour Bhatoli and Baloh in Tehsil Ghumarwin District Bilaspur (SH Construction of protection wall at WTP Sanoti and head works near connection bridge under PDNA).
Repair and maintenance work on link road Baba Bharthari Mandir to Dhilwan GP Chetran Km 0/0 to 1/00 SH C/o Protection wall at RD 0/030 to 0/105-LHS
C/O Retaining/ protection wall.
Restoration of rain damages to link road from NH-707 to Chhachhetti Km. 0/0 to 14/250. (SH- Construction of RCC deck slab of existing 6.00 mtrs span RCC slab culvert at RD 3/280 alongwith toe wall and wing wall at RD 3/285 to 3/395) (R.H.S.)
A/R and M/O to residential and non residential building at R.P. Niwas Shimla during 2024-25. SH: Provision of toe wall, chain link fencing for boundary, connecting the existing waste water line to existing chamber and carrying out other related miscellaneous works at Observatory Cottage R.P. Niwas Shimla (H.P.).
Restoration of rain damages on Motipur Dudar road km 0/00 to 2/500 (SH- Construction of drain and concreting on berm at Rd 1/640 to 1/697, Toe wall to existing R/wall and construciton of R/wall at Rd 1/685 to 1/697) Under PDNA 2023
Construction of Water Harvesting Structure in Neri Nalla in Bajuri beat and Gabion Crate wire check dams in Neri Nallla upper Catchment in Bajuri beat, Hamirpur block in Hamirpur Range of Hamirpur Forest Division
cum sedimentation tank, pump house, barbed wire around the civil structure stage Ist and 2nd RCC storage cum sump well at 2nd stage, Main storage tank at Node 3, sector storage tank at vill Barog, laying and jointing of G.I. pipe in distribution syst
C/O Retaining wall at RD-8/140 to 8/160, C/O Breast wall at RD -9/315 to 9/375, C/O Wire Crated R/wall at RD 9/315 to 9/367 and C/O u-shape drain in PCC 1 3 6 at Km.9/315 to 9/375)(under PDNA).
Construction of wire crated Retaining wall at R.D. 0/900 to 0/910 (Between R.D. 0/720 to 0/920) PCC Breast wall at R.D. 0/310 to 0/325 (Between R.D. 0/150 to 0/550), 1/150 to 1/170 (Between R.D. 1/110 to 1/170), 1/950 to 1/970