Loading…
Loading…
5,626 results • Best match
SH C/o Gabion wall protection wrok on Galah Nallah near Bum in distt. Bilaspur HP
SH CO retaining wall with skin reinforcement along with apron at RD 32400 to 32500 32700 to 33090 490 mtrs
SH Formation Cutting, Providing and Laying 600mm dia hume pipe, edge wall and retaining wall in Km 0.0 to 0.345.
C/o Retaining wall in wire crate with PCC base at RD 38/285 to 38/315 Arandwala PDNA 2023
C/O Path from H/o Tilak Raj to H/o Kammu. (SH C/o Retaining wall and paver blocks)
Construction of retaining wall in PCC at RD 1 480 to 1 485 and2 050 to 2 060 Under PDNA
Construction of retaining wall on back side of Vipasha Sadan at Bhiuli Mandi in R.D. 0/013.50 to 0/027)
Construction of Retaining wall with Pushta between at RD 40/200 to 40/800 and 43/900 to 44/200).
SR TO CONSTRUCTION OF RETAINING WALL AS BUTTRESS TO THE EXISTING EASTERN FACING FORTIFICATION WALL OF KANGRA FORT, KANGRA (H.P.)
(Sub Head -Construction of Retaining wall at Km. 0/310 to 0/313 under SDRF Deposit SID-SDF/2025/307)
S.H C.O Retaining Wall in wire crate at Km 2.735 to 2.770 and in PCC at Km 5.330 to 5.370.
CO retaining wall to protect the pump house and sump well at badon Rd 0 to 16 NDF 2022 130
Formation cutting, Cross drainage, C.C.Pavement, Retaining wall, Preparation of sub grade and GSB from Km. 0/00 to 1/00
Construction of embankment and construction of Wire Crated Retaining wall at RD 13-660 to 13-710 DC Deposit LADA
Construction of Retaining wall with Pushta between at RD 23/910 to 24/00 and 24/060 to 24/160).
Construction of Retaining wall at RDs 1/200 to 1/215 and 1/390 to 1/404.30) Under DMFT Deposit.
PROVN OF RCC RETAINING WALL AND RCC SECURITY WALL NEAR BLDG NO. P-19 AT MANKOT UNDER AGE(I) DALHOUSIE
SH Site development and construction of retaining wall over Plot No. 200/10 for Type-I to Type-IV Qtrs
CO AE office cum residence , CO PCC retaining wall , providing and fixing sanitary fittings, proding and installation of electrical fitting
E-Tender for construction of retaining wall for the protection of 33/11 KV S/Stn Ramshehar under ESD Ramshehar
Construction of retaining wall on back side of Vipasha Sadan at Bhiuli Mandi in R.D. 0/00 to 0/013.50)
Construction of retaining wall and earth filling at RD. 0/0 to 0/014 under deposit SID. SDF/2024/472).
SH C O Retaining wall with skin reinforcement along with apron at RD 19830-20080 (250 mtrs.) Job No. 1
C/O Retaining wall with Type - IV -22 to 27 at Rd 0/006 to 0/016.50 under Melhi section
P/L Boulder Filling in retaining wall and back side of building and construction wire crates in front of building.)
Restoration of rain damages on Joharji Mallha road SH C/O Retaining wall at Rd 26/550 to 26/565
Construction of Retaining wall in stone masonry at RD 0/450 to 0/457.50. D.C. Deposit Scheme ID-2024/65.
SH R R of 10mtr long Retaining wall Behind P House stage 1st at RD 0 0 to 0 10
Construction of PCC Retaining wall at RD-0/100 to 0/125 and 0/510 to 0/535)(under PDNA)
C/o Retaining wall in wire crate with PCC base at RD 3/740 to 3/800 Bhudriya. PDNA 2023
C/O Retaining wall at RD-10/110 to 10/117 and improvement of road at various reaches). (Under PDNA).
C/O PCC Retaining wall at RD- 1/700 to 1/770 and 2/350 to 2/370). (Under PDNA).
Removal of silt and C/O Retaining wall with CC 1.5.10 to protect the pump house near Takoli Sabji Mandi
Protection work using retaining wall wire crate and providing laying CC 1,3,6 in Kuhl NDF/2026/33,NDF/2026/47.
CO retaining wall to protect the pump house at Seri Kothi for 2nd stage from RD 0 to 12 Rmt.
C/O Retaining wall to protect the over ground Tank,RD0/0 to18 Mtrs. Right Side (Nallah Side) )Under PDNA
C/O link road from Karot to Harijan Basti Fakrehra km. 0/0 to 4/0(SH- Formation cutting 5/7 metre at km. 0/0 to 1/0,C/O 4.00m span RCC slab culvert alongwith wing wall at R.D.0/260 and 0/300 and C/O Retaining wall at R.D. 0/120 to 0/135)Under SCCP.
Improvement of black spot on Giri Nagar Jaton road km 0/0 to 25/0. (SH- C/o retaining wall in cement concrete at various RDs from 5/810 to 5/820, 8/990 to 9/014 and wire crates at various RDs from 3/025 to 3/030, 2/055 to 3/060 and 18/785 to 18/799)
Incomplete C/O Nihog to Methli Road km. 0/00 to 5/000 (SH Balance work of removal of Formation Deficiency from km. 2/300 to 3/720,C/O Retaining wall in PCC km. 0/430 to 0/436 and 0/455 to 0/461, C/O R/Wall in wire crate from km. 0/500 to 0/520
RR Damages on Thunag Banyad Mandehalu road Km 0 000 to 14 200 SH Construction of Retaining wall in PCC at Rds 0 350 to 0 359 point 70 0 360 to 0 363 0 650 to 0 660 4 360 to 4 374 4 420 to 4 425 and Removal of slips in various roads in Km 2 600
C/o Shantla to Sidh road Km. 0/0 to 1/200 (SH C/o Retaining wall at Rd 0/250 to 0/240, u-shape drain at Rd, 0/225 to 0/240 V-Shape drain at RD. 0/360 to 0/400 , 0/410 to 0/490 and C.C. pavement at Rd. 0/220 to 0/250) under MMSY.
head weir, RCC sump well 36651 ltrs cap, delivery tank 10000 ltrs cap at Node 2, pump house cum attendant qtr, outlets / B.P. Tank 11 Nos HDPE pipe for feeder line, distribution system, providing and errection of pumping machinery, laying and jointin
P/L Solid cause way at rd.0/135 to 0/165 with toe wall, 600mm dia RCC hume pipe culvert ,edge wall at various rds.)Under OTMNP
Providing and laying under slab flooring, protection of D/S toe wall and C/O wing wall D/S Bhoura side of existing culvert at RD. 1/495
SH C.O wire crate R.wall with PCC toe wall at RD 2.675 to 2.690, 2.735 to 2.750, 4.010 to 4.025 and PCC R.wall at RD 3.225 to 3.237
Construction of PCC and wire crated Retaining walls at R.D. 1/210 to 1/250 (Between R.D. 1/100 to 1/400) 1/860 to 1/900 (Between R.D. 1/600 to 1/900)
Formation cutting, Wire crates, Retaining walls, Cross Drainage works, side drains, Parapets, Road sign board, and Mettaling and Tarring) Under PMGSY (Regular) (Batch II for the year 2018-2019) Package No. HP-02-348
C/o Building Portion, Providing Water Supply, Sanitary Installation, C/o Septic Tank with Soak Pit, Rain Water Harvesting Tank and Site Development i/c C/o Boundary Wall and Breast/Retaining Walls etc.
Formation cutting, Passing places, Retaining walls, Cross-Drainage work, Granular Sub Base, WBM-II WBM-III, Tarring work, road side drain, Parapets etcetera including routine maintenance for the year after completion of construction work
SH Construction of Breast wall at RD 0/300 to 0/320 RHS 900mm dia RCC Hume Pipe Culvert at RD 0/225 and RCC pavement at RD 0/0 to 0/030