Loading…
Loading…
5,626 results • Best match
SH Building Portion W S and S I Septic tank rain water harvesting tank Retaining wall and site Development
C/o Retaining wall at RD3/240 to 3/255 B/wall at Rd 3/240 to 3/251
Construction of Retaining wall at RD-1/115 to 1/130 and 2/015 to 2/030 under PDNA
CO PCC Retaining wall to protect the Kuhl from RD 0 to 5.75 meter and CO RCC Outlet chambers
(Sub Head - construction of Retaining wall at km 5/585 to 5/587.85 under Deposit SID-NDF/2025/9).
GE/CHD/T-08/2026-27 REPAIR TO RETAINING WALL,DRAIN AND ALLIED SERVICES AT NAHAN UNDER GE CHANDIGARH.
GE CHD T 16 2025 26 REPAIR TO RETAINING WALL,DRAINS AND ALLIED SERVICES AT NAHAN UNDER GE CHANDIGARH
Construction of PCC Retaining wall at R.D. 1/105 to 1/125 (Between R.D. 1/090 to 1/250)
Construction of retaining wall 0/150 to 0/162,0/975 to 1/00 and 2/850 to 2/860
C/o Retaining wall in wire crate at RD 0/958 to 0/990 D/S Bridge. PDNA 2023
Construction of Retaining wall at RD. 2-980 to 3-020 and 1-720 to 1-735 .Under PDNA.
Construction of Retaining wall at RD-1/630 to 1/645 and 1/715 to 1/745 under PDNA
Construction of Retaining wall at RD-1/320 to 1/335 and 2/680 to 2/700 under PDNA
Construction of Retaining wall at RD 0/300 to 0/330 and 0/360 tp 0/375 under PDNA
C O Pacca field Channel at RDs 0 to 150 and C O of Retaining wall to protect Kulh
C/o PCC retaining wall with 1-5-10 at RD 13/330 to 13/345) under PDNA-2023.
Construction of P.C.C. Retaining wall at RD. 2/885 to 2/910 and 2/980 to 3/000. PDNA
(SH Removal of formation Deficiency, C.D. works, Parapets, R/Wall, B/Wall and Gabions wall M/T works and P.C.C. drain) under Nabard RIDF-XXVII
C C WORK
Construction of R/wall at RDs 0/0 to 0/030 ) Under DMFT Deposit.
Providing and laying Cement Concrete Pavement at essential reaches and Construction of E/Wall and D/S toe wall of HPC at km 2/810 ( Balance work)
C/O hume pipe culvert toe wall at RD. 0/195 and wing wall at RD. 0/185.75 to 0/193.75 and 0/196.25 to 0/204.25)
SH C.o wire crate R.wall with PCC toe wall at Km. 7.645 to 7.665, 7.665 to 7.685, 8.850 to 8.865, 8.900 to 8.915 and 12.840 to 12.860
Formation Cutting, Passing Places, Retaining Walls, Cross Drainage Work, GSB, WBM II and III, Side Drains, Road Side Furniture Parapets and Tarring including Routine Maintenance for five years after completion of construction work
SH Construction of Retaining walls at various RDs. 0/765 to 0/780, 0/780 to 0/795, 0/795 to 0/810, 0/810 to 0/825 and 0/825 to 0840
Formation Cutting passing places , retaining walls, cross drainage, side drains, parapets ,cement concrete pavement and metalling and tarring) under PMGSY (Regular) Batch -II for the year 2018-19 Package no HP-02-334
(Sub Head - Construction of retaining wal at RD 5/032 to 5/050, Breast wall at RD 5/020 to 5/030 and Edge wall at RD 5/018 to 5/029.70)
C/O Wire Crated Breast wall alongwith R /wall at RD 4/075 to 4/095 4/180 to 4/190, 5/150 to 5/160 and 6/840 to 6/860
Km 0.0 to 23.780 ic ROFD Retailing Wall Breast Wall Cross Drainage work Metalling and Tarring W-Metal Crash Barriers Road Side Drain Parapets Paver Blocks and Traffic Signs Board . MDR-104
co wire crate diversion wier at head co RRM jretaing breast wall between RD 900 to 910 P L J of HDPE of 315 OD from brogo source Rd 0 to 1000
SH C/o Breast wall at the Back side of the Lawn of Inspection Hut Brow at RD 8 to 11.50 3.50 mtrs and at the LHS RD 0 to 15 mtrs.).
C/o Proposed B/wall, Protection wall at RD 4/440 to 4/464) DMFT
(SH- Repair of paneled glazed door , white washing distempering , Protection wall and other miscellaneous works)
Repair of Pump house by providing protection wall around the pump house SDF-2024-297
C/o Bus stand Karsog. (SH P/L Cement concrete, and c/o protection wall)
SH C O PCC protection wall for manhole sewer line in Ward No 11 Gurubehar
CO filter intake chamber and CO protection wall to protect the source length 12 mtr
Construction of wire crate protection wall at R.D. 8/440 to 8/540 and Embankment
Supplying and fixing expended to wood orsteel members in partitionsGate Protection wall Ushape drain etc
Construction of PCC protection wall in cc 1 4 8 and construction of wire crate
Construction of wing wall, protection wall for proposed RCC slab culvert at Rd 1/510
(SH-Construction of protection wall for slab culvert at RD. 23/870 to 23/877).
C/O Drainage system with 1 5 10 office side protection wall at Ahadu Nallah
SH- C/o Protection wall from Rd 21/350 to 21/380) Under O.F.C Head
Providing and laying CC in drain and protection wall, steel work at Division office ground
Sub head construction Gabion Walls including Crate apron on both Bank of Nagoh khad and construction Toe key on River Side along the Gabion Walls RD 2100 to 2210 and 2215 to 2280 175 Rmt of both banks
SH C/o Gabion wall protection work for Galahi Nallah at Galahi in Distt. Bilaspur HP
Providing R/wall and B/wall in cement concrete and gabion wall at various RD (BASP)