Loading…
Loading…
1,469 results • Best match
Construction of Retaining Wall and Widening of Road at Kyathanahalli Tank Bund and Repair of Road from Ch 18.80 to 19.30 Km due to Heavy Rain in Kandli-Bylahalli-Bikkodu Road to TDH Road via Kyathanahalli, Ugane, Marenahalli, Chinnenahalli, Shankadakoppalu, Mudlapura, Kabbali, Krishnapura in Hassan Taluk.
IMPROVEMENT OF BOLURU NEAR KORAGAJJA TEMPLE ROAD, RETAINING WALL NEAR KOKKADAL SHIVANAGARA NEAR GEETHA D ACHARYA HOUSE, NEAR PWD FLAT NO. 5 TO POLICE STATION AND VADIRAJA NAGARA FOOTBALL GROUND TO JYOTHI HOUSE IN MANGALURU TALUKUNDER THE HEAD OF ACCOUNT 4059-80-051-0-60-132 CMIDP
Construction of retaining wall and improvements to road Soragaon-Malali-Nagaral to join Akkimaradi Mahalingapur road MDR from Km 9.30 to 9.60 and Km 12.20 to 12.37 in Mudhol taluk of Bagalkote district (Under 4059-80-051-0-60-132 CMIDP for the year 2025-26)
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, RCC Ducts, RCC Cross Drainage Works, Retaining wall, SWD, HDPE Dual Water supply pipe line & OHT at Sector-2 in Devanahalli General Industrial Area Phase-2 (ITIR Phase-2), Doddaballapura & Devanahalli Taluk, Bengaluru Rural District
Construction of Protection Wall to CD on Chowdeshwarhal to Malla Peerapur to SH-60 Approach Road (MDR) (Via Pethammapur, Baichbalm Agni, Agatirth, Road at Km 35.30 in Shorapur Taluka under 3054 MDR Bridge Maintenance for the year 2025-26
CONSULTANCY SERVICES FOR SURVEY WORK FOR THE WORK OF CONSTRUCTION OF CC BOX DRAIN FROM SRI MAHADESWHARA TEMPLE TO GANIGARA NINGAIAHANA LANDS, CONSTRUCTION OF CHECK DAM AND PROTECTION WALL IN KEMPASIDDANA HUNDI VILLAGE CHIKKAIANA CHATA HOBLI NANJANAGUD TALUK MYSURU DISTRICT
Rapairs to CTC at Sy.no.74 & 68 of Khanur village in SD-1 of DY-8 of IBC,Repairs to lining at 5.118 km CTC upstream &Downstream, Protection wall from 2.30 to 2.50 km, Rapairs to lining near 132.30km of ILC
Improvements to road from Hebbandi Chikkere to Donabagatta Main road, Approach road and Side protection wall of Slab Bridge to Chikkere of Hebbendi village and Re-construction of Deck slab Bridge to Chikkere of Hebbendi village, Bhadravathi Taluk Package No.6
Repairs to collapsed portion of Retaining wall at CTO Building, Pinto Road Hubballi.
Construction of Toe wall, Garland drain and Coir matting at TW-3A and GD-3A for AD-3 Active dumpareaofDIOM
a) Construction of Retaining Wall behind Vandana Ladies Hostel and Independent Quarters b) Construction of Compound Wall behind Class IV Block No. 2 and Pump House Yard c) Construction of Compound Wall Besides Akshay Nurses Boys Hostel, besides 500 KLD STP and besides Burns Ward at KMCRI Campus, Hubballi
Construction of concrete near kadiyali temple shet house to tulasi teacher house road, Construction of retaining wall opposite kamala bai hotel road in Kadiyali ward Construction of hump opposite volakadu government higher primary and high school road and Construction of concrete culvert opposite infra distributor road in Kinnimulki ward
Design and Construction of formation in embankments, cutting including blanketing, Major bridges, Minor bridges, RuB, ERS/retaining wall, sacrificial retaining wall, drains, boundary wall ,fencing works and Station boxes of Nagawara and Kanakanagar
Construction of 12 nos Type-II quarters including internal water supply, sanitary installation, drainage and development works such as CC Road and Toe wall including providing IEI and fans and street lighting at Sainik School, Kodagu SH : Providing Inspection Vehicle with driver for day to day supervision at various sites and data entry operator under the Kodagu Central Sub Division, Kodagu.
Repairs work to Bantwal Inspection Banglow and Construction of Compound wall and Retaining Wall
RECONSTRUCTION OF CD WHICH IS DAMAGED BY HEAVY RAIN AT KM 6.60 OF HARIKANDIGE YELLARE CHATKALPADE MDR IN KARKALA TALUK AND CONSTRUCTION OF PROTECTION WALL AND WIDENING OF NARROW CDS AT KM 1.10 AND 1.30 OF PADUKODOORU SHIVAPURA MUNDADIJADDU ROAD IN HEBRI TALUK
PACKAGE NO-4 1)Construction of Protection wall near Hiremane,Karadigadde, and Marigebailu Kadavadi Meega road in Neelanduru village in Begaru GP in Sringeri Taluk 2)Construction of Protection work in Thippanakoppa-Gundagaddemakki-Bakurdi road in Kuthagodu G.P. in Sringeri Taluk (GENERAL)
Custom Bid for Services - Piling and associated civil works for strengthen ENN retaining wall as per the attached scope BOQ SCC Drawing specifications and directions of EIC SOR Items in AnnexureB complete items from Sl no 1 to 8 Similar Category Maintenance and Pigging Service for Oil and Gas Pipelines
Construction of retaining wall across the streams flowing near the railway bridge leading to Kirloskar Institute, at Tegginakere stream, at the stream near Millat Circle, and at the stream near the wet well of Halladakere, within Harihar City Municipal limits, in order to divert sewage water to the Sewage Treatment Plant
Development of road Nehrunagar Main Road to Mogaragalli link road, Providing slab on the right side of the road passing through G.M. Ganesh s house in Meenupet Kanchi Kamakshi Temple in Malabar Road and Construction of a retaining wall behind Moidu s house in Sunnada Bheedi in Virajpet TMC limits
Construction of Retaining Wall to Kurubarahalli village Limit of Jalamangala Gp (2) Construction of check dam in Gollaradoddi village Limit and (3) Repairing of Check dam of Kolamaranakuppe village limit (4) Improvement to Road and Drain from Lakshmipura village to Matakaiahna doddi village of Lakshmipura Grama panchayathi, Kutagal Hobli, Ramanagara Taluk
SPECIAL REPAIRS TO COMPOUND WALL AT GLOBE AREA AND SBI LINE PROVN OF INTERLOCKING TILES NEAR BLDG NO BC 77 OF THE MARATHA LIRC BELGAUM PROVN OF PROTECTION WALL BEHIND CBT HALL OF THE MARATHA LIRC BELGAUM PROVN OF COVERED SHED ALONGWITH ALLIED WORKS N
Design and Construction of Formation in Embankments, Cuttings including Blanketing, Ramp, ROB, Minor Bridges, RUB, ERS/Retaining Wall, Sacrificial Retaining Wall, Drains, Boundary Wall and fencing At-Grade Section of 5.80 Km and Ele Viaduct of 185m
Construction of road and drain from Manu Master house to Nidhi Kushak s house in Nisarga Layout, Construction of retaining wall infront of DSP qrts to N.M. Thimmaiah s house road in Gandhinagar and Development of culvert from Devanna s house to Bhagyavathi hiuse road in Nehrunagar under Virajpet TMC limits
CONSTRUCTION OF RETAINING WALL AT MARAVOOR - ADYAPADY - UNILE - KANDAVARA MAJOR DISTRICT ROAD AT KM 1.50 AND ASPHALTING TO KADRI - BONDEL - AIRODRUM MAJOR DISTRICT ROAD FROM KM 1.20 TO KM 1.30 IN MANGALURU TALUK, DAKSHINA KANNADA DISTRICT UNDER THE HEAD OF ACCOUNT 3054-04-337-1-10-200 MDR MAINTENANCE.RESERVED FOR SC CATEGORY.
Construction of retaining wall at ward no 10 Udyamanagar beside susheela siddi house and beside saroja marathi house road and installation of CCTV camera at along the road side at ward no 17 under ravindranagar area and installation of concrete sofas at ward no 17 ravindranagar along the roadside for public seating
construction of concrete drain near muchilkodu ashwatha katte road and 7th main road in kasthurba nagar ward continuation of concrete katte acharya marga 1st cross and construction of concrete and drain okude ram bhat 2nd cross road in Kunjibettu ... concrete retaining wall behind ...
Tender for the work of constructing retaining wall for protecting BWSSB boundary property in Tataguni pumping station and constructing RCC drain from Ist stage pumping station entry gate to IIIrd stage pumping station exit gate along the pipeline road coming under AEE(K-O&M-2)-2 sub division Tataguni. (Short Time Tender)
Improvements to roads in Laxmipura village in Anughatta G.P, Aladahalli village in Aduguru G.P, Yamasandi Chokanahalli main road to Kudluru village in Yamasandi G.P and Construction of Retaining wall at 2.40 km and Cut and cover from 4.20 km to 4.80 km of Keetur canal under Yagachi rseservoir Project in Belur Taluk
Instalation of slab over drain from beside Ismail house at Tarikambala to Jaswal house construction drain near Padmalatha house at Thotilaguri Nirvasitara site and from beside Konchar Govt site Iqbal house to Damodara Belchada house and construction ... of retaining wall near ...
Hubballi Division- Londa - Miraj(LD-MRJ) proposal for construction of retaining wall cum drain to protect the embankment on both UP-line.(at KM.717/500-719/300) and DN-Line (at Km.716/714-718/250 and 718/250-719/600) sides between Kudachi-Ugarkhurd(KUD-UGR) stations.(Maintenance Period:12 Months)
Project Management Consultancy Services for the work of Formation of Industrial Layout including formation of 24m wide roads, 18m wide roads including asphalting, construction of RCC side drains, RCC Cross Drainage works, retaining wall & HDPE Water Supply pipe line at Sector-1 in Dobaspet Industrial Area Phase-7, Nelamangala Taluk, Bengaluru Rural District
Wall work
Improvements To Road SH-177 Muddebihal Taluk Border to NH150(A) Km 154.70 to 156.97 in Shorapur Taluk Yadgir District(Road Safety Works)And Improvements to Road Hunugunda Surpur Road Km 127.00 to 129 and Construction of Protection wall (Road Safety Work) in Shorapur Takuk Yadgir District.
Construction of RCC Drain Work and Concrete Flooring in the inside Part of the Commercial Complex Building and Construction of Retaining Wall Behind of Commercial Complex Building and 2)Installation of Poles and Street Lights for lighting around the Commercial Complex Building at CTS NO 3490/1A/1 Near Mourya Hotel in Haliyal TMC Limit
Construction of culvert beside Jerome Mathais thoota at Ambekar Nagar, construction of steps near Kusuma Rajesh and Vijaya Lakshmi Brijesh houses, construction of retaining wall in Venkatesh Hema koppala house, interlock from Pratima Teacherhouse to Mohini house, and installation of culvert pipe over drain opposite Karambaru Chitra Rai house, Ward No. 13, Bajpe TP Limit
Formation of Industrial Layout, including Construction of Roads, of RCC Side Drains, RCC Ducts, RCC Cross Drainage, Retaining wall, Nala Training Works, HDPE Dual Water supply pipe line, OHT, GLSR, Borewell, Raising Main & RWH at Sector-5 in Devanahalli General Industrial Area Phase-2 (ITIR Phase-2), Doddaballapura & Devanahalli Taluk, Bengaluru Rural District (2nd Call)
Repairs to roof,Grouting to Underground Tanks and Retaining wall etc.in Underground Metro Stations including Tunnel section.
construction of concrete and drain govinda pushkarani 2nd cross in kunjibettu ward construction of retaining wall opposite prakash acharya house road amd development of paduranga tawer to baby poojary house road in Kadiyali ward construction of concrete maruthi vithika 1st cross road in thenkapete ward Raising and concreteing babbuswamy temple road in volakadu ward (CAT-II A)
Development of road at Sunkadakatte burial ground and towards Madhura Sunil house, Layining of interlocks around Betta Guliga temple, developmanet of road towards Raghu s house, construction of retaining wall behind Muthamma hiuse near Sunkadakatte, Installation of slabs in front of Braite School and construction of retaing wall infront of Ali hiuse at Harikeri in Virajpet TMC limits
Project Management Consultancy Services for the work of Formation of Industrial Layout Including Formation of 18M Wide Road & 15M Wide Roads Including Asphalting, Construction of RCC Side Drains, RCC Ducts & Culverts, RCC Retaining Wall, HDPE Dual Water Supply Pipeline, & RWH at Karajaga Village Sector-2 in Kanagala Industrial Area, 2nd Phase Hukkeri Taluk, Belagavi District.(2nd Call)
Construction of Retaining Wall near Kamaje Sampath house,RCC Drain at Daivagudde Road side,RCC Drain at Manihalla Road side,Road and Drain near Parlya nursing home,road for Taripadpuroad , opposite to Karambade temple,Cover slab near Parlya Volleyball ground and Road from Daipala to Pattukodi in Bantwala TMC limits under Amrutha Nagarothana phase 4 Incentive grant.
Project Management Consultancy Services for the work of Formation of Industrial Layout including formation of 30m wide roads, 24m wide roads, 18m wide roads & 12 wide roads including asphalting, construction of RCC side drains, RCC Cross Drainage ... works, retaining wall & ...
wall
Re Construction of Fallen Compound wall and part of Dilapidated Retaining wall at CTO Compound Pinto Road HUBBALLI
CC Road, Retaining Wall, Extension of Inward Area, Cold Storage Room Platform and Collocation of Cold Storage Room
Custom Bid for Services - CHARGES FOR SL NO 1 TO 20 CONSTRUCTION OF GABION WALL UNFINISHED BALANCE JOB AT C TYPE AREA MRPL TOWNSHIP AS PER SCOPE TOTAL AMOUNT IN RS INCLUDING GST TO BE QUOTED HIGHER OR LOWER THAN THE SOR VALUE AS PER BOQ Similar Category Support Services
Raising the CD protection wall built for nala near the Patagundi Hanuman temple at W.No.1, Construction of CD slab near Ashok Patil house Basavan nagar at W.No.13 and Laying of Cuddapah flooring for drains from P&T compound to Khaji house in Laxmi badawane at W.No.15 (MF)
Name of work IMPROVEMENTS TO ROAD FROM SANKANOOR ROAD TO BALI NAYAK TANDA, CONSTRUCTION OF BRIDGE TO ROAD FROM HABANAIK THANDA TO BELEGERA AND CONSTRUCTION OF BOX CULVERT & PROTECTION WALL TO ROAD FROM DANDAGUNDA TO SHIVANAGAR THANDA IN CHITTAPUR CONSTITUENCY KALABURAGI DISTRICT UNDER SCP/TSP 2025-26 KS-15-56
Improvements to Okkaligara Kalyana Mantapa