Loading…
Loading…
1,469 results • Best match
Construction of road
Construction of ROB in lieu of LC no. 97 @ Km:121/600-700 as 1x36 m Composite Girder (Railway portion) + 3x18.71m PSC Girder(Kirangoor end) + 6x18.71m PSC Girder (Rampur end) + 3x28m PSC Girder (Rampur end) + RCC retaining wall (approach portion) and proposed Limited height subway at km:121/540 as 1x5x2.5m RCC box Between Panadavapura and Srirangapattana stations (Composite work)
Construction of retaining wall and protection work to stream flowing near the agricultural land of Namera and Kadyamada family in Kunda village, Maithadi family in Kadanooru gram panchayath, Balikuttira and Byakera family in Arameri village, Kommethodu Puyyathira and Kolumanda family in Chembebelluru gram panchayath and near Anvarudda masjid and Church in Virajpete Arji village of Virajpete taluk in Kodagu district.
Project Management Consultancy Services for the work of Formation of Industrial Layout including Formation of 30m,18m, &15m wide roads including asphalting, construction of RCC side drains, RCC ducts, RCC Cross drainage works, retaining wall SWD, Nala Training works & HDPE Dual water supply pipeline at Sector-5 in Devanahalli General Industrial Area Phase-2 Devanahalli & Doddaballapura Taluk, Bengaluru Rural District
Construction of drain in R V Nagar main road to Court road, Construction of concrete road to Swaraj maidan Sundar bhovi house, Development of Road and drain in near Swaraj maidan Damodhara house, Construction of Laterite stone masonry Retaining wall in swaraj maidan park and construction of cowcatch in near swaraj maidana Sridhar naikas house in ward no 07 of Moodbidre TMC Limit
Construction of a steel roof and installation of sheets replacement of the three doors behind the main hall and expansion of the rear sheet, construction of a protective Retaining wall next to the main gate, and installation of protective glass for the railings on the first and second floors Railing of the Kodagu Zilla panchayath Building in K Badaga Village of Madikeri Taluk
IMPROVEMENTS TO ROAD FROM NEELANAGAR TO SHIRUR, BENAKATTI, HALLUR, SANGAPUR MDR AT SELECTED REACHES FROM KM 17.50 TO 18.50(WORKING CHAINAGE KM 17.725 TO 18.50) AND CONSTRUCTION OF PROTECTION WALL AT CHAINAGE KM 13.98 IN BAGALKOT TALUK OF BAGALKOT CONSTITUENCY UNDER 5054 MDR APP-E IMPROVEMENTS HEAD FOR THE YEAR 2024-25
Towers protection wall for (a)tower No.2 of 66kV Chikkakondagola line near Haralahalli limits village (Mavinahalli village), (b)tower No.15 of 66kV Belur-Ugane-Suzalan & Uddur multi circuit line at Uddur village limit, (c)Tower No.4 of 66kV Arakalagudu line and (d) Tower No.17 multi circuit 220kV Upparahosahalli (NHAI)
SW 1:-Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and ... and Retaining Wall (Approach ... and Retaining Wall (Approach ...
Construction of Training cum Hostel Block of Canara Bank at Bagalur, Bangalore. Subwork/Packages: SH:Providing Toe wall, paver blocks and inlet and outlet points for RO at all floors.
Hubballi Division: SW-I:-Lachhyan-Tadwal (LHN-TVL)section: Cess work and provision of side drain and toe wall in the approach of Bhima bridge. SW-IIA:- Lachhyan-Tadwal (LHN-TVL) Section: Pre-cast drain between track in approach of Bhima bridge (Lachhyan end) for a length of 1.3km. SW-IIB:-Kudagi-Mulvad(KDGI- MVD) Section: Pre-cast drain for a length of 0.4km and RCC drain for a length of 0.6km (Maintenance Period:12 Months)
Development of Drain in front of Balbhavan of Ward No.16, Providing and fixing of Interlock for new private bus stand auto stand of ward no.16, auto stand in front of new taluk office, development of drain in front of Chummi Devayya s house in ward ... of retaining wall near ...
Durga Village
A) Construction of Retaining Wall to The Box Culverts (3 Vent) on SH-149 (Higway Connecting from Shahpur to Shivrampur) at Chainages Km 106.20 & 106.30 Near Khajakotnoor Village in Taluka and District Kalaburagi and (B) Construction of RCC head Walls and repairs to Various Cross Drainagess in Road Connecting Malagatti to Bolewad MDR at CH. Km 17.69 to 23.41 In Taluka And District Kalaburagi
Installation of interlock seenu naik house road Kasthurba nagara concrete vadiraja road kunjibettu retaining wall annappa house road im kadiyali drain vadiraja 3rd cross road in volakadu concrete nandanavana layout road in Bailoordrain BB nagara main road in kinnimulki installation of slab brahmakumari road in ajjarkadinstallation of slab ambalpadi temple road and Construction of drain and installation slab padiyar house to damodar store in thenkapete ward
Construction of Bridge at Byaralagadde to Bilagali road in Sunkasale Grama Panchyat, Construction of Checkdam cum retaining wall across Somavathy halla in Binnadi village of Taruve Grama Panchyat in Bankal Hobli, Construction of Bridge at Dunduga village going road in Hale mudigere Grama Panchyat of Kasaba Hobli, Reconstruction of Bridge from Dharadahally Handuguli to Alur going road in Kasaba Hobli of Mudigere Taluk-PACKAGE1
Construction of retaining wall near prabhu hotel in kakkunje installation of interlock vishnumoorthi temple parking area in Karamballi construction of drain flavi Dsouza house road in Mooduperampalli construction of drain 6th cross rafic house road in indiranagara construction of drain shanthi nagara 3rd cross in chitpadi construction of drain ashok nagara cross road in gopalpura construction of drain near M M school road in Bailoor
Asphalting of 11th cross narayana shettigar house road and 13th cross road in Eshwaranagara ward near bhudagi complex road Vyayam school road doddanagudde 2nd cross road balegarabettu cross road in Gundibail ward prasad colony selected area parika ... of retaining wall manjunatha ...
NMDC/Donimalai/Contract/56/25-26/ET/512
MCW works at FSD, UNKAL HUBLI for the year 2020-21 SH Construction of Security cabin and RCC retaining wall near main gate
Construction of drain and installation of slab 5th cross road and Construction of concrete and drain 4th cross road in Moodubettu ward Development of billu gudde 2nd cross jayasheela house road and Construction of concrete sarveshwara 3rd cross road ... of retaining wall and ...
Huyyarmakki on Kabbinale Marmannu Nadubettu link Road
Construction of public Drain behind GEC Haroon s house In Ward No. 07 Ganapathi Street, Providing slab for drain in front of Abraham Arshad s house and development of drain behind Kalam Layout Khalid s house and Construction of Retaining Wall near Dasawala David Vegas s house in front of Raja kaluve and construction of drain for Raja Canal in front of Zubair s house at Madikeri CMC limits
PROJECT MANAGEMENT CONSULTANTS (PMC) FOR PREPARATION OF DPR FOR TP OFFICE ROADS,DRAINS AND BUILDING WITH WATER SUPPLY/UGD,RETAINING WALL INCLUDING SURVEY DESIGN SERVICES.CONSTRUCTION DRAWINGS FOR ALL SERVICES, STRUCTURAL DESIGNS INCLUDING STRUCTURAL DRAWINGS FOR BUILDING AND ASSISTANCE IN TENDER PROCESS. EXECUTION AND SUPERVISION OF WORKS, ASSISTANCE IN BILLING PROCESS AND ALSO 3RD PARTY FOR THE URBAN INFRASTRUCTURE WORKS IN THE NEGALUR ROAD AT TP GUTTAL IN HAVERI DISTRICT.
Construction of a retaining wall near Madina Masjid from Mrs. Farid s house to Mr. Irpan s house in Sunnada bheedi, Construction of RW behind Mr. Shafi and Mr. Khader s house, construction of concrete steps near Hamsa s house, development of road in front of Daniel s house in Vijayanagar, from Anish s house to Mustafa s house, Panjarupet main road to Kariappa s house in Virajpet TMC limits
Dvlpt.of Hale Taluk Kumbarakeri Road.2).Cnst.of Retaining Wall behind Arapath house in Napoklu Gram Panchayat.3))Cnst.of Cheriyapa rambu Darga Road,Behind Napoklu Market inNapoklu Grama Panchayat.4)Cnst.of Napoklu Horticulture Department Front Makki Temple Link Road.5).Cnst.of Kolakeri-Kuvalakadu Pysari Road in Napoklu Gram Panchayat.6)Cnst.of Kolakeri- Teremekkadu Road.7).Cnst.of Pullera, Achandira,Thattanda Family and Mooteri Temple Road.8).Dvlpt.of road from Mooteri Temple to Hale Taluk Road(sc)
1Improvement of road from Matarangi Kushtagi main road to Dyamambika temple in Gajendragad taluk 2Improvement of road from Matarangi cross to Chandasabha Bhagwan farm 3Improvement of road from Gowda s house in Lakkalakatti village in Gajendragad ... a retaining wall on
Construction of CC road and drain in 1)Polahalli village limit 2) Gollarapalya village limit of Bachenahatti GP 3)Donakuppe & Dandinapalya village limit 4)Halashttihalli & Valagerepalya village limit 5)Byranahalli village limit of Sathanuru GP kasaba ... of Retaining wall to ...
Construction of Retaining wall to waste wier stream to Kommanahalli village of Nutuve G.P, Construction of Check dam to Markandeya nala of Eshwaranahalli village of Nutuve GP, Construction of Check dam including connecting Road near Bantahalli village of D N Doddi G.P, Construction of Check dam including connecting Road to Kesargere village of Masti GP and Construction of Check dam near Suggondahalli village of Turunasi G.P of Malur Tq in Kolar Dist.
Supply of Cookking items and other materials for Harikeri Samudhaya Bhavana, Development of road and drain infront of Silvanagar Sainu and Dyani house, construction of retaining wall behind Sikhandar house in Neharunagar, infront of Rasheed s house and development of road till Shabnas house road, Construction of steps from Ganesh house to Ashok s house in Neharunagar and Development of road from Sudhesh s house to Jayee s house in Vidyanagar in Virajpet TMC limits
DEN/South/SBC section: Construction of RCC drain (3000m) and ballast retaining wall (1000m), in connection with the work of SBC-SA Sec: Complete track renewal(P) of existing 52Kg rails on 52Kg PSC of 1540 nos/KM with 60kg/90UTS rail and 60Kg wider base sleeper of 1660/Km for a length of 22.0 Km from Km 23/000- 45/000(SL) in ADEN/DPJ section. Maintenance period is 6 months.
FORMATION OF ROAD FROM ALLOLLI GATE TO BETGERA (BATGERA(B) TO ALLOLI CROSS), FORMATION OF ROAD FROM KALKAMBA CROSS TO BATGERA (B) VILLAGE IN SEDAM TALUKA, CONSTRUCTION OF PROTECTION WALL ALONG THE RIVER OF BATGERA(K) VILLAGE IN SEDAM TALUKA, FORMATION OF ROAD FROM MADHAVAR (RANJOL ROAD) ROAD TO BORING HUDA IN SEDAM TALUKA UNDER KKRDB MICRO 2025-26 WORK CODE-KLB 2511223351
Road Improvement Works on Virajpete Byndoor (SH 27) Km 218.50 to Km 219.80 at Selected reaches, Road Improvement works on Virajpete Byndoor (SH 27) Km 226.30 to Km 226.80 (Kadabagere Gram Panchayat) CC Drain, Retaining Wall construction along Selected reaches, Road Improvement works on highway connecting Virajpete Byndoor (SH 27) from balehonnuru main road to PWD Road via Gram Panchayat Church and Road Improvement works on Virajpete Byndoor (SH 27) Km 225.00 to Km 226.00 in Sringeri Constituency of Chikkamagaluru Taluk & District.
Improvements to Hemavathy Left Bank Canal Service Road from Ch.3.00 km to 5.00 km to connecting Uduvare village to Devihalli village under atchkat of HLBC in Kattaya Hobli, Hassan Taluk and Hassan District and Construction of protection wall on IP side of the Hemavathy Left Bank Canal at 3rd KM near Gramadevathe temple in Uduvare village towards foot bridge under atchkat of HLBC.
Preparation of Detailed Project Report (D.P.R.).INCLUDING CONDUCTING SURVEY PROVINDING INDEX MAP,VARIOUS SECTIONAL ELEVATION,PREPARATION OF ESTIMATE,AND ALSO PROVIDING VARIOUS NUMBER OF COPIES OF ESTIMATES WHILE THE ESTIMATE BEEN PLACED IN VARIOUS COMMITEE MEETINGS
PACKAGE NO-10-CMIDP 1.Improvements of road from K S Jairam House to Idukuni road in Kolale village and Anjale road of Aduvalli village and GP 2)Asphalting of Mudodi and Hanthuvani road Kanuru GP 3) Construction for retaining wall of Bennegundi raghu & Echaladalu Manjappa house to Masthamma temple raod Bale GP 4) Asphalting of road from Katagale circel to Kangere Saaju Poulos & others house Badagabylu village in Menasuru GP of NR Pura Taluk(GENERAL)
DEN/South/SBC Section: Construction of RCC drain 4100m and ballast retaining wall 1000m in connection with the work of SBC-SA sec: Complete track renewal(P) of existing 52Kg rails on 52Kg PSC of 1540 nos/Km with 60kg/90UTS rails and 60kg wider base sleeper of 1660/Km for a length of 20.2 Km from Km 45/000- 54/000,55/100-900 and 56/100-66/500(SL) in ADEN/DPJ section. Maintenance period is 6 months
SWI: Bengaluru - Sampige road Sec: Proposed provision of Station Master's Rest room at Golhalli (GHL), Nidvanda (NDV) and Dodbele (DBL) stations, under ADEN/YPR sub-division. SWII: ADEN/Hindupur Sub division: Civil works in connection with provision ... RCC retaining wall and ...
Mechanically Woven, Double - Twisted, Hexagonal Wire Mesh Gabions, Revet Mattresses and Rock Fall Netting as per IS 16014 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Path way
Flood mitigation work
Constructions of Work on the establishment of a clean drinking water unit at Ganeshapalya Sivakeshavanagar, Ward No. 03 of Municipal Council And Construction OF CC Road ward no 29 at Mulbagil Town Limit and Painting and Tiles Work For Indira Cateen ... of Retaining wall and ...
Construction of RCC retaining wall on the side of London Nala near Muslim community in Ward No. 09 Shedbal town limit.(Rs. 3.12 lakhs).Development Phase 1 work of Yallamma Gudi Bhavan in Ward No. 10, Shedbal Town limit(Rs. 2.00 lakhs).Construction of CC road near Hanuman Mandir in Ward No. 07, Shedbal townlimit (Rs. 1.62 lakhs).Repair of concrete road dug for installation of drinking water pipes in Ward No. 5,6,9 of Shedbal town limit (Rs. 3.91 lakhs)
Construction of check dam, Nala Improvements and other works
Construction of slab and protection wall to drain at ward no 3 ambedkar nagar infront of M D Mulla house to infront of davud house and Laying of covering slab from infront of kishanhouse to gopal kanade house and construction of drain and slab covering at ward no 5 akbar galli area infront of NR Bhat lawyer house and ward no 6 islam galli area infront of labours office near aktar house
RCC Steps
ROAD
Providing PMC Services including Supervision, Quality Control for Package-3 Construction of Retaining wall, Multi purpose building, Samudhaya Bhavana and Improvements of Hindu Burial Ground in Chamarajpet Division (Est Cost. Rs.1025.00 Lakhs)
Design and Construction of Formation In Embankments/Cuttings/Blanketing, MIBs, ROBs, RUBs, ERS/Retaining Wall, Drains, Boundary Wall, Fencing Works In At-Grade Section of Length 12.632 Km and Other Related Infrastructural Works
Infrastructure development for new helicopter manufacturing facility for HAL at Biderahalla kaval gubbi taluk Tumakuru dist under phase 1 stage 3 package 3 SH Ancillary development works such as formation of canals for diversion of rivulets, ... RCC retaining wall near ...