Loading…
Loading…
1,917 results • Best match
Repair of Damaged Flooring, Painting Work in First Aid Centre and Repair of Retaining wall of Road near South Complex Quality Control Lab at Paradip Refinery, Paradip, Odisha.
SR to Sarangada-Nuagaon-Balliguda Road (SH-1) such as construction of retaining wall and recessed parapet wall from 87.865 to 87.900 Km for the year 2023-24.
R.D road to Kiramba_Road_SDBC, CC Drain, Protection Wall _0/000 to 2/740, 2/640 to 2/740, 2/300 to 2/350
Construction of protection wall in between RD. 00m to 280m of MDR at RD 44m of Dhanupali Minor of Parmanpur Distry for the
Construction of 1000mm Dia HPC Double Row with Approach Road and Protection Wall at 2/850 Km on BM Road to Nilimari Road
Construction of protection wall in between RD. 700m to 980m of MDL at RD 1111m of Parmanpur Disty for the year 2019-20.
Periodical maintenance for construction of protection wall on NH-215 to Badaektali from 0/100 to 0/300Km for the year 2021-22.
Construction of both side protection wall within RD 1060 m to 1260 m of WCL offtaking at RD 461 m of Bargarh Distributary.
S/R to PWD road to Mrutyunjayapur road such as BT repair PMC and Sealcoat and protection wall for the year 2025-26
R.D. Road - Sumandi._Road_Over laying of CC block over Damaged CC , with a provision of protection wall(420mtr) _0/100 to 0/520
Construction of protection wall in between RD. 600m to 880m of MDL at RD 4868m of Parmanpur Disty for the year 2019-20.
S/R to Lanjipalli Goods Shed Road to Khajuria Bye-pass NH such as providing Paver Block, Construction of Drain and Protection Wall.
Improvement to Tampala Minor for the year 2023-24 (from RD. 00M to RD. 2100M, Construction of structure with protection wall with lining)
Construction of CC road drain and Protection Wall at Cluster No 02 Munda Sahi (Bhagalpur) for the DPs of village Gobindapur of KIP
S/R to Digi to Aunligumma road such as Berm filling, CD Painting,Toe wall (0.030 mtr) at CD ch. 3.220 Km (Ch-0/200 to 6/000 Km) in Tentulikhunti Block for the year 2024-25
Maintenance of Bridge No.77(UP) by providing Gabion in 08 Nos of affected piers under the jurisdiction of ADEN/Mahasamund of Sambalpur Division.
Maintenance of Bridge No.77(UP) by providing Gabion in 08 Nos of affected piers under the jurisdiction of ADEN/MSMD of Sambalpur Division.
Construction of retaining wall and balance CC road from Ananda Ojha house towards Dangaghat and Mir Jahangir house towards Sk Riju house at Habib Nagar in Ward No.14
S/R to RD road Brajarajpur Bambada Gadabanikilo road for 2023-24 (such as Pot hole repair with BUSG and SDBC and construction of CC road and Retaining wall)
IMPROVEMENT TO NRUSINGHANATH TEMPLE SUCH AS CONSTRUCTION OF RETAINING WALL,ARTISTIC ENAMEL PAINTING TO WALLS FIXING OF RAILLINGPROVIDING DRAIN COVER SLAB ETC IN PAIKMAL OF BARGARH FOR 2025-26
S/R to PWD Road T8 to Salaguda road Such retaining wall from Ch.0/000 to 0/500Km,. in the district of Kandhamal for the year 2024-25
S/R to RD Road to Bidukhole Such as SDBC, Retaining wall ,Protection Berm ,flank dressing at Ch 0/000 to 4/450 Km for the year 2025-26
Construction of drain from Gopinath Panda house towards Sanatan Mohanty house and road with retaining wall from Prafulla Das house towards Saptaghar Chhak at Elkha in Ward No.13
Construction of paver road with retaining wall and road crossing culvert from Adivasi Colony Govt. UP School towards Makar Melana Padia at Bagurai Adivasi Sahi in Ward No.8
Badabirunha Road GP office to NH 215 at Mahammad Jamalpur via Sotti Goleipur Mirjapur__BUSG, PMC and Seal coat , Retaining Wall-1.4mtr ht- 0.000 to 0.500 and 0.100 to 0.300
Construction of RCC Retaining wall both side at RD 6840m to RD 7220m Heavy Filling Zone of Right Main Distributary of Deo Irrigation Project for the Year 2026-27.
Construction of VR Bridge at RD 22.363km in K.B Canal at RD 0.100km Retaining wall at RD 20.20km and at RD 24.040km in K.B.Canal for the year 2023-24
Construction of Toe wall within the RD 7526 M to RD 7636 M Left Side and RD 7585 M to RD 7662 M Right Side of Saraphgarh Main Canal of Saraphgarh Irrigation Project for the year 2019 20
Construction of RCC protection wall (Left Side) from balanced Rameswar kalyan Mandap Road to towards Panda bandh in W.O. No 7 under NAC Barpali
S/R to PWD road to Petapalli road for the year 2024-25 Such as construction of protection wall and SDBC in BT surface
Widening of service road near CD at RD 1400m of Salandi Right Main Canal including construction of protection wall for the year 2025-26
Construction of protection wall in Disty No-7A of P. Canal in between RD 00 to RD 3000 m for the year 2024-25
Providing speed breakers and protection wall for RFID boom barriers (7 nos) at different Entry/Exit gates under GOCP of Basundhara Area(1st retender)
NH-203A to Rendhagarh_Road_BUSG, Pothole Repair PMC,SC, paver Block-230 mtr-, Protection Wall-200mtr-0.000 to 0.970 0.970 to 1.200 0.000 to 0.200
Improvement to Flood Protection Embankment on Baitarani Right from Khaparakhai to Panchupalli near village Tukuna (Launching and protection wall) for the year 2025-26
Construction of RCC protection wall (Right Side) from balanced Rameswar kalyan Mandap Road to towards Panda bandh in W.O. No 7 under NAC Barpali
Repair to Bridge over Local Nallah on Kundar Panchada - Jhodikenda road_Road_Bridge approach repair, WBM, SDBC, Protection wall and stone pitching_0/900 to 1/200
Construction of protection wall and removing of silt from Gallery canal in between RD 4200 m to 4500 m for the year 2025-26.
Improvement to Flood Protection Embankment on Baitarani right near village Madhu Kesari for the year 2026-27 (Construction of Protection wall and Slope filling)
Construction of protection wall from RD 0.00m to 100.0m on Kusumi right embankment near village Bhutadihi of Nayagarh District for the year 2025-26
Construction of Protection wall near RD 3600 m on right bank of Daha Left Distributary of Daha Irrigation Project for the year 2026-27.
Earth retaining wall
Improvement to Kajala Drainage Cut and its Slope Protection work under Doab-II
Canal Maintenance
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Structural works over Drainage Channel
Construction work
Earthwork, Cement Concrete, Reinforced Cement Concrete and RR Stone Works
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
S/R to Belghar - Ambadola Road such as construction of retaining wall at 12/200 to 12/240 and 14/950 to 15/050 Km for the year 2020-21