Loading…
Loading…
1,918 results • Best match
Construction of Protection Wall from RD 70.00m to 240.00m of ESCAPE CHANNEL off taking at RD 480.00m of Main Canal of Kanupur Irrigation project, Basudevpur, Keonjhar
Construction of both side protection wall between RD 10950m to 11010m of Huma Tail Disty. For 2019-20( Working RD 10950m to 10983m) Under Critical Lump)
S/R to Giridipalli-Jhadasahi road for the year 2024-25 Such as construction of protection wall repair of CD work and SDBC in BT surface
S/R to MDR-68 to Chaitanpur road such as pothole repair with PMC and SC and Constn. of protection wall for the year 2025-26
Imp. Of Hatadihi Branch Canal (repair of Protection wall) U/S of fall along with Bed lining at RD 13100 mtr ) for the year 2025-26
Repair to HL Bridge over river Salki on KainjharNuasahi road such as Berm Concrete and Protection wall at Ch 2/800Km for the year 2025-26
Construction of RCC Boxcell Culvert with approach Road and Protection Wall at 2/850 Km on Link Road to Temurupalli Road for the year 2023-24
Const. of Protection wall left side D/S of Escape at RD 11700 mtr of Hatadihi Branch Canal near village Nachhipur for the year 2025-26
Improvement to Mugupur Distributray (Including Construction Of Structure with Protection Wall Lining and Resectioning)From RD. 5700 M TO 6100 M for the year 2025-26
S/R to Karada Indragada road such as SDBC,protection wall, and Drain from Ch 0/000 to 1/500 Km for the year 2025-26
Construction of Protection wall within RD 0 m to 210 m of WCL 9692.60 m of Sukha Distributary under lump critical for the year 2026-27
Construction of Protection wall within RD 95 m to 345 m of WCR 2042.16 m of Lariabahal Minor under lump critical for the year 2026-27
Repair to Chandaneswar Talsari Road (ODR) such as construction of Retaining Wall from 2.721 Km to 2.781 Km (RHS) under Non-Plan in the District of Balasore for the year 2022-23.
SR to Sarangada- Nuagaon- Balliguda Road (SH-1) such as construction of retaining wall from 87.930 to 87.980 Km, 87.700 to 87.725 Km, 75.300 to 75.400 Km for the year 2021-22.
S/R to Patiamba to Tikiripada Such as Pot hole repair ,protection berm, jungle clearance,retaining wall ,Flank dressing from Ch 0/000 to 3/750 Km for the year 2025-26
S/R SH-1 to Datapaju Such as Pot hole repair ,protection berm, jungle clearance,retaining wall ,Flank dressing From Ch 0/000 to 3/280 Km for the year 2025-26
Construction of RCC Retaining Wall from Chainage 1/100 Km to 1/125 Km on Proposed New alignment of Rayagada- Kerada Road in the district of Rayagada for the year 2025-2026.
RD Road to Jaria Sahar Sahi_Road_Protection work at D/S Approach with retaining wall and boulder pitching , Painting to Parapet and railing to Box cell culvert (2x5x3.5) _0/900 to 1/000
Construction of Retaining wall on Jajpur Bypass Road Right Embankment of Jajpur Distributary Canal from 5/700 K.m to 5/772 K.m in the District of Jajpur for the year 2025-26.
Construction of Retaining wall on Jajpur Bypass Road Right Embankment of Jajpur Distributary Canal from 5/775 K.m to 5/847 K.m in the District of Jajpur for the year 2025-26.
Making temporary open shed for Store, electric transformer, Development of open area in between circuit no. 03 to 07 by providing concrete pavement paver block, drain, toe wall and making of footpath from CHP to time office at CHP complex of LOCP,LA
S/R to Project Road to Bhinjiguda(Road-B) such as Pot hole repair, CD Maintenance, Signage and Berm filling and Toe wall (Ch-0/000 to 1/320 and 0/202 to 0/365Km) in Nandahandi Block for the year 2025-26
Bank protection to Right Bank of Jonk River near village-Mundagaon towards village-Kurumunda for the year 2020-21 Construction of C.C. protection wall and Bank filling
SH - Kainsar Road Road Repair to Box Culvert Such as Revement Pitching, protection wall, parapet wall repair,clear of vent and Colouring At 1.230 Km and 2.210Km
Construction of protection wall in between RD. 700m to 980m of TMD at RD 2515m of B.K. Pali Minor of Parmanpur Distry for the year 2019-20.
Construction of both side Protection wall in between RD 7660m to 7720m of Huma Tail Disty. For 2019-20(Working RD 7660m to 7696m) Under Critical Lump)
S/R to PWD Road to Betikola road Such as Protection wall at Ch 1/520 Km in the district of Kandhamal for the year 2024-25
Improvement to Flood Protection Embankment on Kusei left from Belabahali to Chatra near Haridapal School for the year 2024-25. (Construction of Protection wall and Stone Packing)
Renovation of protection wall from RD 00M to 10.00M and desilting of RMC in Badhia MIP in Narasinghpur Block under Critical grant for the year 2024-25.
Construction of both side protection wall in between RD 35221m to 35281m of Huma Tail Disty. For 2019-20 (Working RD 35221m to 35256m) Under Critical Lump)
Construction of Protection wall within RD 280 m to 530 m of WCR 1973 m of Digsira Sub Minor under lump critical for the year 2026-27
Construction of Protection wall within RD 315 m to 565 m of WCR 1371 m of Digsira Sub Minor under lump critical for the year 2026-27
Improvement to Canal
Earth work, Cement Concrete work and Stone work
river embankment
Embankment protection
42/6687-S/R to Sabira to Brahmnasabira Road BT surface repair with BUSG and WBM SDBC over laying wearing coat of damaged CC and Retaining wall 0.000 to 2.645 for 2026-27
Construction of RCC retaining wall along with sand filling on the road from NH-5 to Ardalua from 8/910 km to 10/200 km in the district of Jajpur under State Plan
PWD road (Rana Sankha) to Rajib Nagar via Arachandi_Road_Protection work (Raising old retaining wall) to restore the minimum shoulder at U/S side _0/200 to 0/300 0/390 to 0/520
S/R to Bari Balibili road such as Construction of 2 nos of 600mm dia S/R Hume Pipe Culvert and Retaining wall in the district of Jajpur for the year 2023-24
Construction of additional work ie Retaining Wall boundary Wall Septic Tank campus lighting paver Block road drain etc at Anwesha Hostel at Rayagada under ST and SC Development Department Government of Odisha, Bhubaneswar
Improvement to Suhagi Nalla (Desilting RD 00 m To RD 2240m and Retaining wall RD 2059 to 2240m) (Phase-III) under DIP in Dhenkanal Municipality of Dhenkanal District for the year 2025-26
Construction of concrete coal transportation road including drain and retaining wall along with construction of concrete drainage system along CT road and along LOCM-I platform of Lajkura OCP under IB Valley Area.
Construction of Retaining wall and Box-cell RCC Drain with cover slab from Loyala School side road to Siva Mandir culvert drain adjacent to Loyala School Pond (Lt Side) in ward no 20
S/R to Duburi Mandapada road for the year 2023-24 (Such as Providing RCC Retaining wall at 0.100 km and C.C.Road repair from 0/0 km to 0/50 km in stretches)
Construction of C.C. Approach road, R.C.C. retaining wall and Porta cabin Foundation for 2 numbers weigh Bridge (WB 4 and WB5 5) at Jiling Mines of Barbil region in the district of Keonjhar
Repair to Bridge over Hada Nallah at 1st km on RD- Jamuna Culvert- to Baniagadia via Samsarpur road on Bhubaneswarpur -span 4x10.77-_Road_Bridge railing repair,Colouring and Retaining Wall-150mtr-At 1.000 km
RECLAMATION AND PERIPHERAL DEVELOPMENT OF KANTIGADIA BADA POKHARI POND INCLUDING GROUND WORK OF WATER BODY-DEWATERING,RETAINING WALL/PROTECTION WALL/STONE PITCHING,BUILDING WRK,LANDSCAPING WORK,FOUNTAIN WORK,PLUMBING,ELECTRICAL WORK AND BOUNDARY WAll
R.D road to S.pujariput_Road_CC(100 mtr), RCC Protection Wall 5mtr height (100 mm both side), HPC-1200_6/000 to 6/100, 6/000 to 6/100 (both side)