S/R to Belghar - Ambadola Road such as construction of retaining wall at 12/200 to 12/240 and 14/950 to 15/050 Km for the year 2020-21
S/R to Kainjhar to Nuasahi road such as SDBC and Retaining Wall from Ch 2/400 to 3/670Km. in the district of Kandhamal for the year 2024-25
REPAIR MAINT TO BOULDER PITCHING, RETAINING WALL, CULVERTS,AREA DRAIN, COMMUNICATION CABLE DUCTS COVER SLABS AND OTHER ALLIED WORKS INSIDE TECH AREA OF ITR CHANDIPUR UNDER AGE BR-II CHANDIPUR
Construction of Retaining wall including RCC Drain with cover slab from Loyala School road to Siva Mandir (Rt. Side) culvert drain adjacent to Loyala School Pond in ward no 20
FDR to Kendrapra Canal from RD 23.00 Km to 30.500 Km and FDR to Kendrapra Canal at Barapada CR (Construction of RCC Retaining wall in D/s of Barapada CR)
S/R to Garabandha on PWD road (SH-4) to Koinpur via Kinchilingi road (ODR) such as construction of retaining wall at 11/900 km. for the year 2019-20.
R D Road - Pathapur_Road_ BUSG , SDBC Renewal coat of Damaged CC portion Drain Retaining wall _0/000 to 0/750, 0/750 to 1/000, 0/500 to 0/750,
S/R to Garabandha on PWD road (SH-4) to Koinpur via Kinchilingi road (ODR) such as construction of retaining wall at 12/600 km. for the year 2019-20
Construction of Retaining Wall on the bank of Ichha River of Odisha Adarsha Vidyalaya at Chhatenpali under Lephripara Block in Sundargarh District under DMF Scheme for the year 2021-22
Repair to Bridge over Kharasrota at 0 km on Kamalpur Ghat to Dehudibandha ghat- span 14x30.63-_Road_Bridge wearing coat and Colouring,retaining Wall -100mtr-,Approach road -100mtr-At 0.000 km
S.R to Paralakhemundi- Gumma- Serango road (MDR-59) from 0.00 to 34.300 km (Such as Clearing Jungles, Flank Dressing and painting to culvert parapets, trees, construction of toe wall at ch 14.300 km, 27.700km) for the year 2025-26.
Construction of Protection Wall to K.V. Right Embankment (Country Side) from RD 38.120Km. to RD 38.520Km. Including one no village Gada. at RD 38.395Km.
Construction of RCC Boxcell Culvert with approach Road and Protection Wall at 0.930 Km on RD Road to Jandraguda Road for the year 2023-24
Construction of protection wall and syphon in between RD 750m to 800m of MDR at RD 10846m of Parmanpur Disty for the year 2019-20.
Construction of protection wall of Nagpheni Distributary within RD 8400m 8400m to RD 8500m and Khaliabhata Sub-Minor-II within RD 500m to RD 600m
Repair to Bridge over Local Nallah on PWD Road to Girliput _Road_Bridge approach repair, WBM, SDBC, Protection wall and stone pitching_1/600 to 1/800
S/R to Gunjibadi to Jidubadi road Such as SDBC Protection wall from Ch 1/200 to 5/000 Km for the year 2025-26
SR to Sambepadar to Nuagaon road such as protection wall from Ch 2.500Km. to 3.500Km. for the year 2023-24 in the district of Kandhamal
Repair and restoration of PWD road to Bagdega road for the year 2020-21 (Const of protection wall of the existing VC at 4th km)
Construction of protection wall from RD 12.800 km to RD 13.270 km and desilting from RD 13.300 km to RD 14.275 km of Koimetla Distributary
Construction of Protection wall from RD 1800m to RD 2045m of Heavy Filling Section of Tail Minor of Left Main Distributary of Deo Irrigation Project
Improvement to Salania Branch Canal U/S site of NH at RD. 32000M to 32100M for the year 2023-24 (Protection wall with bed concrete)
NH 43 to Uper Pakhondola_Road_Pothole Repair, Protection Wall (170 mtr) ,Jungle Clearance and PMC Seal Coat_0/000 to 3/300 1/730 to 1/900
Construction of RCC protection wall on D/S left side Salandi river from RD 138m to 265m Salandi Dam Hadagarh for the year 2025-26
Improvement to Hatadihi Branch Canal from RD. 16400M to 16600m, Protection wall and (Right Bank raising) RD. 16600M to 17500M for the year 2024-25
Construction of protection wall on Right Bank of No.2 distributary of RMC from RD 6200 m to 6300 m for the year 2025-26.
Construction of protection wall at 0.275 km on the road from PWD road Collectorate square to CDVO office via. Jhadeswar Temple road for 2020-21
RD road Bhajagada to Sundarpur -ML- Road SDBC, RCC Drain with cover slab, Protection Wall -PCC-1.000 to 1.500 1.200 to 1.300 1.300 to 1.400
Repair to bridge over Kusumi river. on Kandagadia Naramanabi road Road Railing and guard post,and repair to both approaches, Protection Wall 0.000 to 0.100
Repair to Bridge over Local Nallah on PWD Road - Balingi _Road_Bridge approach repair, GSB, WBM, SDBC, Protection wall and stone pitching_0/600 to 1/000
Improvement to Flood Protection Embankment on Baitarani right near village Tukuna for the year 2026-27 (Construction of Approach Road, Protection Wall and Bathing Ghat)
Improvement to Kanjhari Dam Toe Service Road with Protection wall and Head Regulator Slab of Left Main Canal with Trough Wall of Kanjhari Irrigation Project
Improvement of structures and construction of both side protection wall of left distributary from RD 00m to tail of KIP for the year 2025-26.
Construction of Additional CD at RD 840m including retaining wall of CD point at RD 1470m and RD 510m of Sanabadaposi Sub Minor of Right Main Distributary of Deo Irrigation Project.
S/R Salki bridge at Ch 2.80Km on Koinjhar Nuasahi Via Ratakhandi road Such as bridge approach SDBC and Retaining wall in the district of kandhamal for the year 2024-25
S/R to Sanagarh to Baunsagarh road for 2023-24 (such as repair to Box Cell culvert of size (1X8X4)mtr at Ch-0/460 KM and construction of Retaining wall)
Development of site construction of Retaining wall around ESR and other structures Construction of concrete path and laying of Pavers block in the premises of WTP at Padhanpali under Dhankauda Block
S/R To N.H-5 to Sakuntalapur Road at from Ch. 2.50 to 3.0 km such as construction of retaining wall for the year 2021-22 in the district of Jajpur .
S/R To N.H-5 Kadei chhak to Nuasasan Road from Ch. 0.00 to 0.100km such as construction of retaining wall for the year 2021-22 in the district of Jajpur
Repair of C.D at RD.48.146Km, Construction of outer Retaining wall (L/B), De-silting and Strengthening of Canal embankments at vulnerable reaches from RD.47.920Km to RD.48.610Km of G.M.C.
S/R to Sarangada-Nuagaon-Balliguda Road (S.H-1) such as Construction of Box Cell Culvert 3x3 AND RCC Retaining wall with Drain at 79.110 km for the Year 2023-24.
Construction of RCC retaining wall on Rajnagar Dangamal- Talchua road from 14/735Km.to to 14.756km. and from 17/715Km.to 17/555.50Km. in the district of Kendrapara for the year 2019-20
SR to Breeka T4 to Rudabidingia road such as Jungle clearance Flank dressing and Retaining Wall from Ch 0.00Km. to 2.420Km. for the year 2023-24 in the district of Kandhamal
Repair to Bridge Over Sankhajora Nallha on Gholapur Ghodabara Road_Road_Colour of Railing, Post, Repiar of same, Raising of retaining wall, stone pitching, Repair of Both Side Approach Road_At 5/200 Km
Construction of RCC Retaining wall alongwith sand filling on the road from NH-5 to Ardalua from 10/250 to 11/535 km in the district of Jajpur under State Plan
Earthwork, Cement Concrete, Reinforced Cement Concrete and RR Stone Works
Civil Work
construction of retaining wall
Slope protection work within RD 0.660 km to RD 0.960 km and within RD 2.00 km to RD 2.200 km of Kenduguda S/M-I and within RD 0.750 km to RD 0.950 km of Kenduguda S/M-II and Desilting and Resectioning of Kenduguda S/M-I and II