Loading…
Loading…
1,918 results • Best match
PROVIDING BLACK TOPPING OF GHAT ROAD (POWER HOUSE CHHAK, MUKHIGUDA TO ANCHORE BLOCK-4 and 5 JUNCTION) AND NEAR BY VILLAGE WITH PROTECTION WALL TO ROAD, UIDC, KHATIGUDA.
S/R to RD road to Kusadhipi road for the year 2024-25(Such as pothole repair with PMC and Sealcoat at patches and construction of protection wall)
Construction of US protection wall in leading channel and guard wall DS of Nandunalla MIP (Head work ) in Tangi Block of Khordha District under Critical Grant 2022-23.
S/R to Construction of Protection wall on Jodabanka to Siadimalia Road from Ch-0.000km to Ch-1.800km in the District of Keonjhar for the year 2023-24
S/R to SH-1 to Babadangia road Such as SDBC renewal coat with Protection wall from Ch 0/000 to 3/300Km for the year 2025-26
Periodical Maintenance of Sankhana to Khaparakhai Road New CC with protection wall from 0/300km to 1/850km 1/600km to 1/800km for the year 2025-26
De-silting from RD 0.000 km to RD 2.850 km, construction of protection wall from RD 2.400 km to RD 2.690 km of Kawasiguda Minor of Koimetla Distributary
Construction of Additional CD hume pipe at RD 2850m, RD 3210m and RD 3390m and Protection wall from Heavy Filling Section of Tail Minor of Deo Irrigation Project.
S/R to PWD road to Bedangapaju road Such as WBM,PMC Seal coat, Retaining Wall from Ch.0/000 to 2/000 Km in the district of Kandhamal for the year 2024-25
Repair to Bridge Over Local Nallah on Barabhaya Nuasahi Road_Road_Colour of post, railing, raising of retaining wall, stone pitching, repair of approach road with pothole repair BUSG , PMC and SC_0/000 to 1/100
EARTHWORK IN FORMATION, CONSTRUCTION OF MAJOR MINOR BRIDGES, RETAINING WALL, DRAINS, SUPPLY OF PSC SLEEPERS, TURNOUTS SLEEPERS, SUPPLY OF BALLAST, P.WAY FITTINGS TRACK LINKING WORKS, CONSTRUCTION OF BUILDING AND ALLIED WORKS FOR PROPOSED SIDING
Embankment protection
Canal Maintenance
Cement Concrete lining
Canal Maintenance
Earth work and structural work
Construction work
Renovation work, Box culvert, Retaining wall
Renovation work, Box culvert, Retaining wall
Construction of RCC retaining wall along with sand filling to safe guard the road of NH-5 to Ardalua from 3/250 km to 5/940 km in the district of Jajpur under State Plan
Construction of RCC retaining wall along with sand filling to safe guard the road of NH-5 to Ardalua from 5/940 km to 8/910 km in the district of Jajpur under State Plan
S/R to Dadaki Duduki Via Ramadi road Such as Retaining Wall from Ch.5/000 to 5/150Km. and 6/000 to 6/080Km. in the district of Kandhamal for the year 2024-25
S/R To Nuahat to Haripur Road at from Ch. 5.410 to 5.510 km such as overlaying of cc road and construction of retaining wall for the year 2021-22 in the district of Jajpur
Earthwork in formation, construction of Major and Minor bridges, Retaining Wall, Drains, Supply of PSC Sleepers, Turnouts Sleepers, Supply of Ballast, P.Way Fittings and Track Linking works, Construction of Building and allied works for purposed
42/6714-S/R to NH-5 to Mulisingh Road Road BT surface repair with BUSG and WBM SDBC over laying wearing coat of damaged CC and Retaining wall 4.000 to 6.380 for 2026-27
Construction of Protection Wall to K.V. Right Embankment (Country Side) from RD 37.110Km. to 37.160Km. and 38.520Km. to 38.750Km. Including one no Drainage Sluice Repair at RD 39.690Km.
De-silting from RD 0.960 km to RD 2.100 km and construction of protection wall from RD 1.320 km to RD 1.545 km of Venkatapallam Minor of Koimetla Distributary
SR to SKPM road to Petapanga such as SDBC renewal coat and Protection wall from Ch 1.200 to 2.400Km. for the year 2023-24 in the district of Kandhamal
S/R to Kaligiri bridge on Begunia-Elapada road (MDR-68 to Elapada) for the year 2024-25 (Such as repair of approach road and construction of protection wall)
S/R to PWD road to Bankatara road for the year 2024-25 Such as SDBC in BT surface and construction of protection wall and repair of CD works
Repair and renovation to the protection wall and renovation of drain with increasing the width for free discharge of water at different locations inside harbour area at Paradip Port.
Construction of Foot Bridge, Protection wall,Bed Bar , Outlet in Olanga Distributary and Sasan Sub Minor,Mundimara minor,with resectioning of Aranji Sub Minor for the year 2024-25
Laimura to Panibhandhar Road Road Repair to Box Culvert Such as Revement Pitching, protection wall, parapet wall repair,clear of vent and Colouring At 1.350 Km and 2.710 Km
Improvement to Disty. No.1 with construction of protection wall from RD 7.720Km to 7.840Km and renovation of outlets and tail cluster of Tanarapa Minor of Taladanda Main Canal.
Providing protection wall
C.C. Protection wall
C.C. Protection wall
C.C. Protection wall
C.C. Protection wall
S/R to RD road T-5 to Bandhaguda road Such as Retaining wall and PMC Seal coat from Ch.0/000 to 1/000 Km. in the district of Kandhamal for the year 2024-25
Special Repair to Kamarda-Baliapal Road such as construction of retaining wall from Ch. 8/350 Km to Ch. 8/450 Km (L.H.S.) under Non Plan in the District of Balasore for the year 2024-25.
SR to Gochha Balapanga Karada road such as RCC retaining wall and dry stone masonary wall for protection of road embankment from Ch 4.400Km. to 4.500Km. for the year 2023-24 in the district of Kandhamal
S/R To N.H-53 to Bhakuda Road at from Ch. 0.100 to 0.500 km such as overlaying of cc road and construction of retaining wall for the year 2021-22 in the district of Jajpur
REPAIR MAINT TO BOULDER PITCHING, RETAINING WALL, CULVERTS, AREA DRAIN, COMMUNICTION CABLE DUCTS COVER SLABS AND OTHER ALLIED WORKS AT LAUNCH COMPLEXES, TRACKING STATIONS, SITE A, B, C, KUMARPUR, BHIMPUR, CERTAIN PLACES FROM OP4000 TO OP19000
8792/E8 REPAIR/ REPLACEMENT OF CHAIN LINK FENCING, BARBED WIRE FENCING, COMPUND WALL, RETAINING WALL, DRAINS, PAVER BLOCKS, CHEQUERED TILES, KERB STONE ETC TO FOOT PATHS AND APPROACHES AND OTHER CONNECTED ITEMS AT NAD SUNABEDA, ODISHA
Construction of protection wall from RD 1.480 km to RD 1.630 km, RD 5.800 km to RD 5.840 km and RD 8.200 km to RD 8.290 km of Koimetla Distributary
SR to Lendrikia Chhak to Mandasaru road such as SDBC renewal coat and protection wall from Ch 4.00 to 5.20Km for the year 2023-24 in the district of Kandhamal
FDR to Salt Road from Balasore to Gud MDR from 34.025 km to 34.135km for the yeAR 2019-20 such as construction of Protection wall on right side of road.
SR to Lendrikia Chhak to Mandasaru road such as SDBC renewal coat and protection wall from Ch 4.00 to 5.20Km for the year 2023-24 in the district of Kandhamal