Loading…
Loading…
1,917 results • Best match
Balance work for completion of internal drains with one number pipe culvert and incomplete CC Road retaining wall and earth filling on both approaches of completed culvert in the RR colony Jamada for construction of Additional Spillway Hirakud Dam
S/R to Dalabadi Chhak to Burupada via Sidigi road Such as Potholes repair with PMC Seal Coat and Retaining wall from Ch.0/00 to 2/000 Km. in the district of Kandhamal for the year 2024-25
Excavation of foundation, Filling and foundation with sand , CC M-10, CC M-15, centering and shuttering, RCC M-20, HYSD Bar weep hole, Earth work by mechl means and earth work in ordinary soil.
Renovation of fall at RD 4395m , jungle clearance, bank raising and strengthening , construction of protection wall of Khairpadar Disty from RD 00 to 5.00Km under Non-Plan(Critical) for the year 2020-21.
S/R to PWD road -Rana Sankha- to Rajib Nagar via Arachandi road -Protection wall to 1000 mm Dia 2R HPC at Ch0.560km- in the District of Cuttack for the Year 2023-24
Construction of C C Approach Road Protection wall to 3 Nos of Weighbridges and Approach road 2 Nos and QDS platform at Bansapani iron Ore Mines Top Quarry in the dist of Keonjhar
Construction of protection wall from RD 2.000 km to RD 2.240 km, repair of 2 nos Pipe aqueduct at RD 2.040 km and at RD 2.450 km of Mangipalli Minor of Koimetla Distributary
Construction of RCC Protection Wall at RD 250m and RD 3030m and 01 no of Additional CD at RD 750m of Baliposi Sub-Minor off-taking from Neunti Minor of Deo Irrigation Project.
Construction of C.C. Lining and Protection Wall for Pingupatna Sub-minor I, II, Radhapur Sub-Minor III, Bhaliadiha Sub-Minor and Godhinali Sub-Minor of Pingupatna Minor System under Deo Irrigation project, Karanjia.
Protection wall and guard wall
Protection wall and bed lining
Canal Maintenance
Improvement of Road from Palbani to Asanjoda (MDR-86 H) such as R.C.C drain with cover slab retaining wall from chainage 5/480 km to 5/760 km under Mayurbhanj (R and B) Division, Baripada for the year 2025-26
Periodical maintenance to Chatrapur to Sanakaturu via Badakaturu ( PWD road SH-4 at Sariapalli to Sanakaturu) Road such as Construction of Box cell bridge and retaining wall over Local Nallah in the district of Gajapati for the year 2024-25.
Execution of Pre cast RCC Box culverts, Pre cast RCC Box Syphon CC RCC Drain, CC RCC Retaining wall etc in Angul Balaram section in connection with Angul Balaram Putagadia Jarapada Tentuloi Rail Corridor of MCRL in the state of Odisha
TRD related work in connection with the work of "Protection to side slopes in cuttings by wirerope netting, esaening of slope, retaining wall etc to protect deep cuttings on vunerable locations under the jurisdiction of ADEN/RAIR of Sambalpur Division".
S/R to SH-1 to Nabaguba Such as Protection Berm,Retaining wall ,Ridge apron of 1x3.00x3.00m and 5x3.00x3.00mslab culvert at Ch 2/2650Km and 3/100Km and 1x4.00x4.00Boxcell culvert at Ch 0/480 KM for the year 2025-26
Construction of concrete pavement with RCC box culvert, RCC drain, Retaining Wall etc. along with 1 no. of composite girder bridge and 01 no. of underpass for Shifting of existing Coal Corridor from Northern side to Southern side of Lingaraj OCP.
Construction of Retaining Wall, RCC Drain, Road and superstructure of ROB (30 point 5 M span composite girder) and other misc civil works in connection with coal transportation system of Darlipali STPP of NTPC Limited in Sundergarh Dist in Odisha
SR to Balliguda- Barakhama- Khamankhole- Sindhiguda Road (SH-41)such as construction of retaining wall from 3.800 to 3.900 Km, 34.300 to 34.350 Km, 35.450 to 35.500 Km, 35.980 to 36.030 Km, 41.310 to 41.360 Km for the year 2021-22.
S/R To PWD Road to Mangarajpur Road at from Ch. 0.00 to 4.60 km such as repair of BT, CC, construction of retaining wall and fixing of Road furniture for the year 2021-22 in the district of Jajpur .
TRD related work in connection with the work of "Protection to side slopes in cuttings by wirerope netting, esaening of slope, retaining wall etc to protect deep cuttings on vunerable locations under the jurisdiction of ADEN/RAIR of Sambalpur Division".
S/R to road from NH-203 to Kapileswar Temple via-Sriram Nagar, Keuta sahi upto Lingaraj Temple such as construction of retaining wall from 1.130 km to 1.205 km (RHS) at Kumbhar sahi chhaka canal for the year 2023-24.
S R to Koel Nagar - Jhirpani Road from 1.368Km to 2.968Km such as retaining wall in widening,RCC Drain,Raising of existing Drainwall andRenewal coat with SDBC at Jhirpani G.P,Bisra Block under DMF fund in the district of Sundargarhfortheyear2021 22
Construction of bounary wall with concertina coil, 01 nos of bore well, retaining wall in the ditch area, 3 nos M.S. fabricated portable cabins and 3 nos toilet blocks for portable cabins at NFSU Campus, Info Valley-II, Khordha, Bhubaneswar.
TRD related work in connection with the work of "Protection to side slopes in cuttings by wirerope netting, esaening of slope, retaining wall etc to protect deep cuttings on vunerable locations under the jurisdiction of ADEN/RAIR of Sambalpur Division".
Comprehensive development of 132 33 kv grid substation at Rairangpur(Outside repairing, painting to control room and store and security shed, provision of CC approach road from gate no 2 to switchyard with RCC gate, provision of RCC Retaining wall t
REPAIR MAINT OF DRAINS COVER SLABS STORM WATER SUNSET SHEDS DAMAGED CULVERTS RETAINING WALL AND ASSOCIATES MAINT NATURE WORKS AT OFFRS MD ACCN IN ZONE A AND OVERHAULING OF LIFT EOT CRANE MECHANICAL LAUNDRY SERVICING AND OTHER CONNECTED ITEMS UNDER GE
Improvement of structures and construction of both side protection wall of Daspalla Minor, Sorada Minor, Madhyakhanda S/M and Sorada S/M-2 of right distributary of KIP for the year 2024-25
Improvement of structures and construction of both side protection wall of Odasara S/M, Pithakhai minor, Pithakhai S/M and Karadapaada S/M of right distributary of KIP for the year 2024-25
Earth work, construction of pcc toe wall and rough stone dry packing, stone pitching work
Restoration to Right Flood Bank of river Badanadi with construction of protection wall to Shiva Mandir from RD 9500 m to 10400 m of Village Khukundia near Shiba Temple for the year 2025-26.
S/R to Karada to Indragada road Such as Hill side Protection wall and Berm Concrete from Ch.11/500 to 12/000 Km in the district of Kandhamal for the year 2024-25
Improvement to Bangarpadi Minor (including construction of structure with protection wall, outlet, foot bridge) from RD. 1900M to 3200m (working FROM rd. 2900m to 5200m, bank raising and resectioning) for the year 2023-24
Canal Maintenance
Embankment protection
Embankment protection
Road works including Bitumen Macadam and SDBC and other Civil works
bank protection work
Embankment protection
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
bank protection work
Improvement to Drainage Channel.
Slope protection to Bhargavi right embankment from RD (-) 0.400 km to 0.00 km and 0.00 km to 0.750 km near Uttara bazar
Desilting of Koimetla Distributary from RD 9.80 km to 11.330 km, repair of HR and Protection wall from RD 0.00 km to 0.030 km of Kangurkonda Minor, Ambaguda Minor, Mangipalli Minor, Venkatapallam Minor, Kalimela Minor
Repair of fall at RD 4.500 km, construction of protection wall from RD 4.200 km to 4.500 km and construction of 1.5 m span culvert at RD 3.500 km of Kalimela Minor of Koimetla Distributary
Bank strengthening from RD 0.000 km to 1.500 km, construction of protection wall from RD 0.700 km to RD 0.840 km and RD 4.000 km to RD 4.190 km of Kalimela Minor of Koimetla Distributary
S/R to the Road from Gunthunia Bazar to Canal Embankment Via Hanuman Hat (Such as Construction of Protection Wall and Strengthening of Shoulder from 0/0km to 1/0km)for the year 2017-2018
Construction of Toe wall in Sason Main Canal from RD 5450m to 5500m for 2023-24.
Protection to Chittrotpala left embankment near RD 6.00 Km and Construction of VRB at RD 150 Mtr.and RD 410m of Charirakaba Minor and RD 1980m of Bhoipada S/M and Construction of Retaining wall in Charirakaba Minor and Sarobarpur Minor for the year