De-silting from RD 0.400 km to RD 2.500 km, construction of protection wall from RD 0.000 km to RD 0.300 km and Repair of Canal Syphon at RD 1.470 km of Kalimela Sub-Minor-V of Koimetla Distributary
Repair to Bridge over Kuanria Nallah on Saradhapur to Dholamara road such as Bridge parapet, railing and post, cutoff repair, wearing coat, protection wall and pot hole repair of approaches with PMC and SC for the year 2025-26
Construction of both side Protection wall with bed lining from RD 50902m to 51015m on U/S of Drainage syphon at RD 51025m of Huma Tail Distributary for 2019-20. (Under Critical Lump) (Working RD 50943.50m to RD 51015m).
Construction of protection wall in the Us of super passage at RD 3745m and improvement to super passages at RD 5490m, 5720m and 6050m of LMC alongwith restoration strengthening of Madhyapur distributary from RD 550m to 650m of MIP
Canal Maintenance
Canal structural work.
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
RIVER EMBANKMENT PROTECTION
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Improvement of structures and construction of both side protection wall of Pathuria S/M, Gobardhanpur S/M,Digiri S/M, Dihagaon Minor, Madhupur S/M and Dihagaon S/M of left distributary of KIP for the year 2024-25
Construction of RCC protection wall at Heavy filling section from RD 6900m to RD 8490m and 02 Two Nos of additional VRB at RD 7620m and RD 8130m of Tail Minor under Deo Irrigation Project for the year 2024-25.
De-silting from RD 0.000 km to RD 0.930 km of Patakonda S/M, construction of protection wall from RD 1.200 km to RD 1.407 km and repair of canal syphon at RD 1.150 km of T.Salimarikonda Minor of Koimetla Distributary
Bank protection for drainage and flood control to Right bank of spill channel at D.S of Upper Jonk Irr Project from RD.00m to 50m for the year 2020-21 Back filling and construction of 1st. and 2nd. Step protection wall
Construction of protection wall from RD 0.400 km to RD 0.550 km and RD 1.325 km to RD 1.600 km, Construction of Culvert of 1.00 m clear span at RD 1.300 km of Kalimela Sub-Minor-I of Koimetla Distributary
S/R to Khandapada-Fategarh road for the year 2019-20 (such construction of Retaining wall from 36/300 to 36/350, 36/500 to 36/570, 36/700 to 36/763km (RHS) and construction of damaged parapet and wing wall at 37/950km (RHS Side) for 2019-20
Construction of R/B Guard wall and bed Concrete at RD 00 to 37 m, Construction of both side retaining wall with bed concrete and road crossing at RD 558 m and Construction of guard wall at RD 590 m of Jamapara Minor and extension of road crossing at
Earth work Concrete work etc
IMPROVEMENT WORKS TO DRAINAGE CHANNE
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Bank protection work
River Embankment
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Slope protection to Bhargovi right embankment from RD 49.700km to 49.850km and from RD 53.450 km to 53.700km near village Kerandipur with guard wall near village Malisahi
embankment protection
CANAL STRUCTURAL WORK
CANAL STRUCTURAL WORK
Desilting of Ambaguda Minor, Ambaguda Sub-Minor and Koimetla Distributary from RD 11.330 km to 11.990 km, Construction of Protection wall of Kalimela S/M-I from RD 0.100 km to 0.240 km, RD 0.420 km to 0.520 km and Ambaguda minor
FDR to NH.20 from Km 222.00 to 223.00 Km such as Construction of Flood protection wall, embankment slope construction and stone pitching from Km 222.775 to 222.865 Km Both side of Aradi side approach of Kayangola bridge for the year 2019-20.
Repair restoration of Ganijang Distributary including constriction of Protection wall at C.R at R.D 00 and D/S VRB at R.D 5.00,Hume pipe culvert at R.D 4.50 km R/B ,inlet at R.D 7.650 ,7.850 km for the year 24-25
RENOVATION, SLOPE PROTECTION AND BEAUTIFICATION WORK OF TALADANDA MAIN CANAL FROM RD 1.56KM TO RD 3.12KM (RANIHAT BRIDGE TO MATRUBHAWAN SLUICE) THROUGH CEMENTIOUS GEO-SYNTHETIC CONCRETE MATTRESS (CGCM).
River embankment work
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT OF DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Slope protection work with launching apron (CC guard wall) to Right bank of river Pillasalki to protect OMM Shanti Vidyalaya (Nadi khandi sahi) and Phulbani sahi of Phulbani town.
CIVIL WORKS
Canal Service Bank Protection Works
CANAL STRUCTURAL WORKS
River embankment
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Earth work, Sand filling, C.C.M-10, C.C.M-15, centering and shuttering, F and P with excavated materials, Earth work in ordinary soil and Earth work Excavation.
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Construction of protection wall from RD 0.740 km to RD 0.810 km of Venkatapallam S/M-II, RD 0.280 km to RD 0.350 km of Venkatapallam S/M-IV and repair of canal syphon at RD 4.790 km of Venkatapallam Minor of Koimetla Distributary