Loading…
Loading…
1,917 results • Best match
Construction work
Canal structure
CANAL STRUCTURAL WORK
Earthwork,Concrete
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
River Embankkment
Earthwork, structure work and stone work
Renovation, slope protection and beautification work of Taladanda Main Canal from RD 3.89 km to RD 5.16 km (NH 16 crossing to Nuabazar Bridge) through Cementious Geo-synthetic Concrete Mattress (CGCM).
Construction Of Foot Bridge At RD 17600 M, CD At RD 20000 M, Cross Regulator At RD 21800 M, VRB At RD 23300 M and 24000 M,2 Nos Box-Cell Culvert At Approach Road, Retaining Wall U/S and D/S Of Drainage Siphon At RD 16143 M Including Service Bank Of S
S/R to Kushakala -Singhpur- Bonai-Border Road such as retaining wall from ch. 6/800 to 6/900Km.,7/300 to 7/400Km.,7/500 to 7/600Km.,8/000 to 8/100Km.,13/400 to 13/500Km. and 13/700 to 13/800Km.)for the year 2019-20 under Annual Maintenance Plan(AMP)
work
Raintaing Wall
canal work
Road Works
Earth work and structure work
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
CANAL STRUCTURAL WORK
Canal structural work.
CANAL STRUCTURAL WORK
CANAL STRUCTURAL WORK
S/R to Kushakala-Singhpur- Bonai-Border Road such as retaining wall from ch. 6/800 to 6/900 Km.,7/300 to 7/400 Km.,7/500 to 7/600 Km.,8/000 to 8/100 Km.,13/400 to 13/500 Km. and 13/700 to 13/800 Km.)for 2019-20 under Annual Maintenance Plan(AMP)
Bank strengthening from RD 0.360 km to RD 0.660 km of T.Salimarikonda Minor, Protection wall on right bank in between RD 0.500 km to 1.1150 km, in between RD 3.350 km to RD 3.500 km and in between RD 4.370 km to RD 4.950 km of T. Salimarikonda Minor
De-silting from RD 0.00 km to RD 1.740 km, construction of protection wall from RD 1.800 km to RD 1.885 km and repair of canal syphon at RD 2.180 km of Gagarmetla Sub-Minor and repair of fall at RD 4.230 km of T.Salimarikonda Minor of Koimetla Distri
Construction of Concrete pavement along with pipe culvert with provision of Retaining wall near Switchyard of BHEP, Balimela
Road and Drain
work
Canal Maintenance
Earth work CC weep hole
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
River Embankment
CANAL STRUCTURAL WORK
CANAL STRUCTURAL WORK
CANAL STRUCTURAL WORK
CANAL STRUCTURAL WORKS
Construction Work
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
FLOOD PROTECTION EMBANKMENT WORK
Desilting of bed from RD 2.70 km to RD 3.180 km, RD 5.400 km to RD 7.020 km, Bank filling from RD 2.40 km to RD 2.70 km and Protection wall from RD 2.160 km to 2.240 km, RD 2.630 km to 2.800 km of Venkatapallam Minor of Koimetla Distributary
Construction of Protection Wall from RD 0.06 km to RD 0.230 km and U/S 15m of Fall No.3 and 5, desilting of canal bed from RD 0.260 km to RD 1.710 km, RD 4.035 km to RD 5.40 km and Jungle clearance of Kawasiguda Minor of Koimetla Distributary
Building Work
Works
Dam Maintenance
Earth work Concrete work Lining work etc
Repair of Canal, Concrete, Earthwork, Lining
Conducting Slope Stability analysis along with aerial survey of deep cuttings and slopes of major bridge locations, land slide areas, Design/Suggestion for stable slopes and submission of scheme for remedial measures to protect deep cutting, Design ... RCC retaining wall on ...
Canal Improvement works.