Loading…
Loading…
1,140 results • Best match
Ordinary Repair of NH-8 in between the Ch.401.00KM to Ch.402.00Km during the year 2019-20 SH Construction of RCC retaining wall at Ch.401.60Km
Construction of Retaining wall (L-65.10 m) at ch.8.20 km on the road from Sonamura-Melaghar main road under TIIFB Scheme during the year 2021-22
Construction of Side wall near Prantosh Sarkar House to Sarajit Sarkar House at Gajaria GP during the year 2022-23/SH R.C.C Retaining Wall (L-30.00 mtr)
Proposed construction work for pucca drain and retaining wall i.H/O Subhash Das.ii.H/O pappu iii.H/O Amar Debnath at Madhya para under ward no.28,AMC.
Const. of drain, retaining wall and C.C. road from the H.O. Sudhir Mandal upto H.O. Chaya Rani Sarkar at Schoolpara under Ward No.47, AMC.2nd call
Construction of RCC retaining wall from Madhu Saha house to towards Haradhan Saha house at ward no. 05 under Melaghar Municipal Council during the year 2022 23
Maintenance of road by CC, mtc of drain, const of RCC slab and sitting platform retaining wall and allied works at different places, under ward no.06
Construction of RCC Retaining Wall at road connecting from the H/O Sajal debbarma to H/O Swadesh Debbarma,at ward no-10 under Jirania Nagar Panchayat.
Construction of Protection Wall from house of Santosh Saha to house of Sunu Chakraborty under Ward No 08 Total Length 61.97M. UMC_UDP_2023_24.
Mtc. of Brick soling road along with CC Blocks as soil erosion protection wall near Madhyapara AWC, Birganj GP, Amarpur RD Block
Construction of soling road along with protection wall from H.O Abhijit Roy to H.O Jhuma Das Surjyapara Under ward No 37, AMC
Construction of paver block protection wall and its allied works at west side of Charipara H.S School Under ward No 47, AMC
Construction of CC road with protection wall from the H.O Swapan Das to Jhumu Das at Kalitilla Under ward No 37, AMC
Improvement of road 282m by paver block, brick soling, protection wall and pelasiding from at Das Para Kalikapur under Ward No-15
Bituminous grouting, Patch metalling, Re-carpeting, Protection wall and other allied works
FDR Mtc of road from TE college to Harisardar under Jirania Sub Division PWD (R B) during the year 2024 2025 SH Toe wall, patch metalling, patch carpeting, grouting, road side drain etc. (Length 1.54 Km).
PR. of road from Kalagachiya Bazar to Arakata under West Tripura district during the year 2021-2022/SH Patch soling, Toe wall, pucca Drain,metalling, Carpetting etc., Portion from Ch. 0.00 km to ch 1.10 km
Construction of CC road including Toe Wall (L-20 mtr) near the house of Naresh Paul to Ratan Paul house at Ward No -10, L-130 mtr. under Ambassa Municipal Council during the year 2024-2025.
Construction of RCC Bridge approach road on the way of Bankul to Bagmara road at ch 0.20km during the year 2020 2021 SH GSB WBM-II and III carpeting sand seal coat and Toe wall etc
Development of road from Bhaktapara to KMR School NH 108B L 1.50 KM under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Re-carpeting seal coat Surface Drain Toe wall etc.
OR of NH 8 in between the Ch. 398.60 Km to Ch. 399.00 Km during the year 2019-20. SH Construction of RCC Retaining walls at Ch. 398.60 Km and 398.80 Km, landslide clearance, Hill side drain clearance, Stripping and filling of earthen etc.3r
PR of road from Lembucherra to Noagaon via Kalapania during the year 2024-25 /SH WBM-3, BM, carpeting, seal coat and Retaining wall etc . (L-4.50 km)
FDR/ Urgent Mtc. of Ambassa - Ganganagar road during the year 2025-2026/ SH - Constn. of R.C.C Retaining Wall at Ch. 20.90 Km (R/S), 21.75 Km (R/S).
Construction of RCC Retaining Wall near the house of Niyati Das at Shyamaprasad Colony under Maheshkhola GP under Dukli R D Block DT- 43 Dt- 20/11/2019
Construction of CC road with RCC retaining wall from PWD road to towards Satya Sarkar house at ward no 05. Under Melaghar. M.C. During the year 2020-21.
Construction of RCC drain cum retaining wall beside of GopalGhosh house to beside of BiswajitChakraborty house at ward no-12 of ANP area during the year 2024-25
Additional work of tertiary centre like back side protection Retaining wall, Over Head Tankl, Under Ground tank, Transformer Base and rest boundary wall in sunamuki, Kailashahar, Unakoti Tripura
Construction of Single Cell Box Culvert (1.80mX1.80mX5 m) including R.C.C Retaining Wall near the house of Sudhanya Barman at Ward No-5, Maheshkhala GP under Dukli RD Block
Proposed 1000 seated capacity town hall at Kumarghat Unakoti District Tripura SH Construction of Retaining wall Boundary Wall Internal RCC pavement Paver Block etc Gr II 2nd call
OR of NH 208 at Km 80.00 to km 83.00 under Kamalpur Sub-Division, Dhalai during the year 2019-20. SH CC Retaining wall, land slide clearance etc.
FDR/Urgent maintenance of Road from Mantala to Simna (at katlamara) during the year 2024-25 / SH Construction of RCC Retaining wall etc.(L-20.00 mtr)/2nd Call.
Construction of retaining wall,drain and soling road passes through Chandrapur to Town Indranagar Bridge towards west side of Chandrapur situated near the embankment of katakhal under AMC.
Mtc of road from Kalkaliya Bazar to Sarkar para during the year 2022-23/ SH Patch soling,WBM-3, Carpeting, Retaining wall etc. Gr-II (L 390.00 mtr)
Special repair of Brick masonry Retaining wall alongwith boundary wall infront of CGHS hospital (back side of type-VI/14 qtr) at Kunjaban extension under Capital Complex Division.
Const.of R.C.C Retaining wall from Agt-Simna road to end of Ariti Ghosh land of Ward no.02 under Mohanpur Municipal Council during the year of 2025-26.
Strengthening of road from Ampura Bazar to Moglam L 3.60 km under Padmabil R.D. Block SH Earthwork, GSB, WBM 2, WBM 3, Pucca drain, CD, Retaining wall etc.
Ordinary repair of NH 08 44 started at Ch.406.80 Km during the year 2019 20 SH Providing BM PMC Surface Drain and Retaining wall including protection work
Improvement of road by brick masonry retaining wall and paver block starting from Sahid Memorial to H.O Maran Basak beside Dukli S.B.I Bank under ward No 45 AMC.
Construction of Retaining wall on the way DMN DMC road to Juri river via Brick Klin Jalabasa GP under RD Panisagar Sub Division during 2024 25 2nd CALL
Construction of toe wall, block pitching etc.
Construction of RCC earth protection wall near pond of Gopinagar CC road and pucca drain near box culvert at Gopinagar(PWD Sor 2020)
Construction of RCC protection wall beside of Swapan Saha house, Kshudirampalli at Ward No-04 under ANP area during the year 2024-25
Construction of Protection wall at Rakhiram Para J.B School of West Kalabaria G.P (Gr-I) under BC Nagar RD Block (PWD SoR-2023)
Construction of Protection wall at Rakhiram Para J.B School of West Kalabaria G.P (Gr-II) under BC Nagar RD Block (PWD SoR-2023)
FDR / Mtc. of different roads under Thelakum and Atharabhula Sector under killa PWD(RnB) Sub-Division./S.H Removal of landslips,clearance of drains, Brick Soling, Brick Edging, repairing of potholes through patch grouting,toe wall, Palasiding, Gunny
Maintenance of road from Ichabpur embankment to Noorpur Panchayet office from Ch. 0.00 km to 1.40 Km L 1.40 Km SH Patch metalling, grouting, patch carpeting , seal coating, toe wall etc. complete during the year 2023-24.
Mtc of road from Boalia-Gopalnagar Road to Chinmaya Harihara Vidhyalaya (L-475.00M) during the year 2025-26/SH Patch soling, WBM, Carpeting,Premix seal coat, Box culvert(1.00X1.00M),Toe wall, drain (L-150.00Mtr) with allied works.
Mtc. of road from Nutanbazar Makhan Hazari Dokhan to Nutanbazar By pass Road near Jagannath Ahsram L- 0.530 km SH- Missing Soling, Earth Filling, Toe wall etc. under Amarpur block, Gomati district during the year 2022 - 2023.
FDR work at 41 miles NH-08 to Sukhdev para TSR camp (L-3.50 km) under Mungiakami RD Block/SH- Toe wall, C.C Block, Pucca drain and palasiding work etc. during the year 2024-25, GR-II
OR of NH-8 in between the Ch. 385.80 Km to Ch. 398.55 Km during the year 2019-20. SH Construction of RCC Retaining walls at Ch. 385.80 Km, 386.60 Km and 398.55 Km, landslide clearance, Hill side drain clearance, Stripping and filling . 3rd call