Loading…
Loading…
1,163 results • Best match
Widening and Raising of CC approach road within the fisheries complex Little Andaman
AR and MO Rural Road under SD-I, CD, APWD, Campbell Bay during 2020 21. Sub work Improvement of road from junction near Suruchi Hotel to CCS junction near AC Bunglow via Guest House in Campbell Bay.
Strengthening of shoulders rural road from APWD main road to 7 family at DB gram Panchayat under GP, Madhupur. Package No. ANO3DGP01. In lieu of C o CC RCC Retaining wall, CC toe wall cum drain at different stretches along PMGSY road towards DB gram
Strengthening of shoulders rural road from APWD main road to 7 family at DB Gram Panchayat under GP, Madhupur Package No. AN03DGP01. In lieu of C o CC RCC Retaining wall, CC Toe wall cum drain at different stretches along PMGSY road towards DB Gram
A R and M O Rural Roads under Sub Division-II under CD, APWD, Diglipur during 2025-2026. Sw - Construction of RCC Toe wall cum drain in PMGSY-II Road Code AN03DGP05 Stretch Kishorinagar to Paschimsagar Package No. AN0305 Ch 4.100 Km to 4.500 Km
Improvement and widening of road from DGP Bungalow to DC office back side road
A/R M/O Rural Road under Sub Division No.l, NACD, APWD, Mayabunder. SW- Construction of CC side drains including RCC Cover slabs along the existing approach road leading towards APWD Godown and Power House at Panighat under Sub Division No.I, NACD.
A R and M o rural road under SD-II, CD, APWD, Diglipur during 2025-26. Sw- Construction of RCC drain in PMGSY-II Road Code AN03DGP12 Package No.AN03 03 at R.K Gram village
AR and MO Rural Road under Manglutan Section, Sub-Division No. II, CDIII, APWD, Prothrapur during 2021 22. Sub Work Improvement of Approach Road to PHC Manglutan for a length of 230 mtr under Manglutan Section.
Construction of Approach Road for a length of 280.00 meters for connecting Type-V and Type-VI Quarters for New Campus Medical College.
Improvement of Rural Road from NH 4 Single Pahad to Badmashpahad for length of 1.40 Km.
Resurfacing of road leading from Hawaghar Junction to Carbyns Cove junction via Nayagoan Village for a length of 2892 Mtrs
Widening and resurfacing of road near gate and construction of 02 Nos Sentry Post at rear Gate at Raj Niwas
Resurfacing of road starting from Dhanalaxmi house via shopping complex to Jawahar colony gate School Line in ward No 15
Resurfacing of Road starting from Das House to Mishra House and behind Suresh House at Chidambaram Colony , Ward No. 24.
Resurfacing of road and drain from main road to Vasudevan Residency at Roop Narayana Colony Garacharma in Ward No.24.
Construction of road side drain from Garacharma Solar Plant to Calicut PMGSY-I road under Sub-Division No-III, CD-II, APWD, Prothrapur.
A R and M O rural road under Sub-Division-II, CD, APWD, Diglipur during 2025-26. Sw- Retrofitting reconstruction of 03 Nos. damaged culverts in PMGSY-II package No.AN03DGP09 Milangram and No. AN03DGP02 Radhanagar
Repair and Renovation of Directorates Building is including face lifting and carpeting of approach Road. SW- Re-Surfacing of Internal Road for Directorate of Health Service at Atlanta Point Port Blair.
A/R M/O Rural Road under Sub Division No. II, NACD, APWD, Mayabunder. SW-Strengthening of road berms from Chainage 15.00 Km to 16.30 km wherever necessary on both sides (0.00 km Tugapur Junction) at road stretches from Tugapur No.8 to Chainpur under
A/R M/o Rural road under Sub-Division No. II, Tugapur , NACD, APWD, Mayabunder during 2023-24. SW- Strengthening of road side berms of Tugapur No-8 junction to Manoranjan Baroi house and Lal Tikrey junction to bailey Bridge at Tugapur No-2 under
A/R M/O Rural Road under Sub Division No. II, NACD, APWD, Mayabunder.SW-Strengthening of road berms from Chainage 15.00 Km to 16.30 km wherever necessary on both sides (0.00 km Tugapur Junction) at road stretches from Tugapur No.8 to Chainpur under
A R and M o rural road under SD-II, CD, APWD, Diglipur during 2025-26. Sw- Construction of RCC retaining wall cum drain in PMGSY-II road Code AN03DGP15 Package No.AN0304 CH 0.762km to 1.914km
Construction of road side drain from Garacharma Solar Plant to Calicut PMGSY-I under Sub Division No-III, CD-II, APWD, Prothrapur. Sub work- Balance work.
Improvement of road from Dollygunj Junction to ICMR
Improvement and Widening of road from DGP Bungalow to DC office back side Road re call
Resurfacing and widening of road from NC Pan shop to Haddo Junction in Ward No. 01.
AR and MO Rural Road under Manglutan Section, Sub Division No. II, CDIII, APWD, Prothrapur during 2022 23. Sub-Work Improvement of Approach Road to PHC Manglutan for a length of 230 mtr under Manglutan Section
Construction of approach road from main road to CTC house at kamorta
80975 Spl Rep to Approach Road at Naval Wharf under GE Haddo
Construction of approach road in Industrial Estate Dollygunj for Uttam Gas Industries.
Construction of Rural Road from Secondary School to Jaidev Bairagi house 2Km at Paschimsagar. Sw- Supply of materials for repair of rural road at Paschimsagar
Improvement of Rural Road to Harminder Bay from chainage 0.00 km to 5.00 Km for a length of 5.00 km
Upgradation of Rural Road from NH connection (Near Webi Junction) to NH Connection (Near Bamboo Nalah Pahalgaon-1) at Mayabunder, North and Middle Andaman under PMGSY-III, Batch-I,2024-25 Package No. AN03MB308 (Length 3.100 km).
Up-gradation of Rural Road from SH Connection Near Adhi Industries to Buddadev house to Krishnapuri Road Laxman Biswas Road under PMGSY-III, Batch-I, 2024-25, Package No AN03DP307, Length 2.399 km under CD, APWD, Diglipur
A/R M/O Rural Road under Sub Division No. II, NACD, APWD, Mayabunder during 2025-26.SW-Strengthening of road berms from Chainage 7.5 Km to 8.10 km (0.00 km Tugapur Junction) at road stretches from Tugapur No.8 to Chainpur under Sub Division No.II,
Strengthening of road side berm wherever necessary from Haddo junction to Chatham junction.
Strengthening of road side berm from Dollygunj Junction to Water Treatment Plant Dollygunj
A R and M o rural road under SD-II, CD, APWD, Diglipur during 2025-26. Sw - Construction of RCC retaining wall cum drain in PMGSY-II road Code AN03DGP15 Ramnagar Package No. AN0304 CH 0.914km to 1.044km
Up-gradation of Rural Road from NH connection (Near Basantipur Chowk) to Basantipur Panchayat (Near Brajlal House) at Mayabunder North and Middle Andaman under PMGSY-III, Batch-I, 2024-25 Package No. AN03MB307, (Length 4.549 km) (3rd Call)
Improvement of Rural Road from Mullah Pahad Road to APWD Road via Ali Hussain House alongwith SFA road to the Play Ground and PMGSY road t Jetty road at Mithakhari village under Ferrar Gunj Sub Division. (Under CRIF)
Improvement of road from Garacharam Junction to NTS Junction.
Construction of CC drain alongside of approach road filter bed at Rangat Bay
Construction of RCC retaining wall near approach road to Vanya Prani Bhawan, Chatham
AR and MO Rural Road under RCD, APWD, Wimberly Gunj during 2025 26. S.W Improvement of Rural Road for templemyo Sub centre Templemyo under Ferrargunj Sub Division.
AR and MO rural road under SD-III, CD-I, APWD, Rangat. SW - Restoration of rural road from Rajatgarh village - Kattan - to Khattakhari at Baratang - 3rd call.
Construction of Cable Landing Station at HAVELOCK AN Islands. SW Construction of Approach road, Security Cabin and miscellaneous work
Improvement of Rural Road from LATR to RK Pur Dam (RK Pur)
Improvement of rural road from NH04 to Bloomsdale at Chouldari under SDII, CDIII, APWD, Prothrapur.
Up-gradation of Rural Road from NH Connection Near Sikder Bar and Restaurant to NH Connection Near Vidayasagar Pally Ward No.2 under PMGSY-III, Batch-I, 2024-25, Package No AN03DP308, Length 1.728 km under CD, APWD, Diglipur