Loading…
Loading…
8,036 results • Best match
Mydukur Municipality - SC SP -2017-18 - Laying of Internal CC Road from Approach Road to D. No. 18/33 Pushparaj house via MPP School at Gaddamalawada 11th ward of Mydukur Municipality
Estimate for providing hand railing @ up stream of head regulator and white washing painting to the head regulator and approach road from right side of head regulator to B.T road connection
Laying of CC road, CC drain and culverts from Sivalayam temple approach road to port colony main road in KNR peta merged village in Anakapalle Zone of GVMC. (Reserved for Society)
Sub Work:Providing approach road & railing to ramps and stair case for working womens hostel at Pineapple colony, Mudasarlova, Visakhapatnam, Main Work: Const of working womens hostels at pineapple colony, mudasarlova, Visakhapatnam.
Formation of Internal WBM Roads, Construction for Weighting shed and Construction of 1000 MTs Capacity of godown with Galvalume roofing with approach road for Market Yard at Pathapatnam of Srikakulam Dist.
Formation of approach road to Jagananna colony lay out at Nelapadu-II (Golidonka) Village of Tenali (M) in Guntur Dist. Layout ID No:073214LA000659 Estimate cost Rs.160.00 lakhs (2nd call)
Providing infrastructure facilities (i.e. compound wall, Burial Platform, Approach Road, Waiting shed, and illumination ) for Hindu Burial ground, Purushothapuram near NH-16 Road in ward No.1&2 of Ichapuram Municipality
APTIDCO-Providing Approach Road with CC from Main Road to Satyanarayana Puram TIDCO Housing Colony including culverts (including 2 years defect liability period) under Lump sum Contract (% Percentage Tender)(3rd Call).
Kanigiri Nagara Panchayat - SCSP 2017-18 - Construction of South side CC drain from R&B road to Kasireddy Nagar SC Colony ending (Vertical approach road) of Ward No. 11 (2nd call).
Providing infrastructure facilities (i.e. compound wall, Burial Platform, Approach Road, Waiting shed, and illumination ) for Hindu Burial ground, Purushothapuram near NH-16 Road in ward No.1&2 of Ichapuram Municipality
Approach Road to Ghat at D/S of TB river near Sunkesula Dam from Kurnool Mantralaym Road at Sunkesula(V) of Kurnool Mandal in Kurnool District, Estimate Cost Rs.90.00 Lakhs
Providing infrastructure facilities (i.e. compound wall, Burial Platform, Approach Road, Waiting shed, and illumination ) for Hindu Burial ground, Purushothapuram near NH-16 Road in ward No.1&2 of Ichapuram Municipality
Providing Extension of Approach road on layout main 30ft road of Pasivedla urban layout- 3 layout of kovvur municipality for house sites under Navaratnalu pedalandariki illu shceme in Kovvur municpality E.G.Distd
Laying of Approach Road from Dno: 23/594-11 at Vinayaka Ghat to EP.No.N-1-6 at SKP Degree college in Ward No.5 under 14th FCG 2019-20 (S.No.35)
APTIDCO-Providing Approach Road with CC from Main Road to Satyanarayanapuram TIDCO Housing Colony including culverts (including 2 years defect liability period) under Lump sum Contract (% Percentage Tender) cum Reverse Tendering
Repairs to Compound wall near Kanakamma temple at Vasista Block and Provision of Compound wall for both sides of approach road at Hostel Block in Govt.Mental Care Hospital premises, Visakhapatnam Distric
Urgent repairs to Approach road of New Nagavali Bridge at Convent Junction in Srikakulam Town Limits connecting NH16 to CSP road from Km. 0/0 to 1/5 in Srikakulam District.
Laying of Approach Road From Proddatur Main Road (Beside Indane Gas Gowdown) to Jagananna Colony at Prakash Nagar Lay Out Ward No.1 in Yerraguntla Nagara Panchayat Under Navarathnalu Pedalandariki Illu
Formation of the approach road from R.V.Road to Jagananna Colony near Cinema hall at Nagulaguttapalli (V) of Surabhi (GP) in Chakrayapeta Mandal in YSR Kadapa District, Est. cost Rs.23.00 Lakhs.
Providing Sump, Septic Tank and Stair Case to Urban Health Center and Providing Quarry rubbish Approach Road from Main Road to Urban Health Center in Postal Colony in Ongole Municipal Corporation
Giddalur Nagara Panchayat - 15th Finance 1st installment 2021-22(untied grant) - Construction of CC Drain and Approach Road from Grandhe Kiran(H) to Satveli Baludu(H) in ward no.5,GNP
Formation of approach road with gravel surface at location from Gangadevipalli to Devarakona in Gangadevipalli (V) of Agadur (GP) of Thondur Mandal in YSR Kadapa District, Est. cost Rs.40.00 Lakhs.
Providing flooring tiles, electrification, plumbing, painting and CC pathways alround building and approach road to existing Kalyanamandapam near water supply office at Muthymamaba Colony, Vepagunta in Ward.No.94 of Zone - VIII
APSPCL - LAD - AUMSP (1000 MW) - Formation of Single Lane BT approach Road to Gollapalli Village including CD Works from N.P.Kunta - Pedaballi Main Road in N.P.Kunta Mandal, Sri Sathya Sai District, A.P.
Formation of Internal WBM Roads, Construction for Weighting shed and Construction of 1000 MTs Capacity of godown with Galvalume roofing with approach road for Market Yard at Pathapatnam of Srikakulam Dist.
Construction of SLRB and providing approach road at Km 35.800 of PIPRMC Package No.2 joining with TLIS SLRB at Km 31.440 at Lakshmipuram Village of Devarapalli Mandal, West Godavari District.
REMOVAL OF EXISTING GARBAGE LEGACY WASTE FROM DUMPING YARD MAIN APPROACH ROAD UPTO CULVERT OUTLET (EAST TO WEST) BY ENGAGING EX-200 AND 5.5CUM/10TONNES CAPACITY TRUCK IN KAKINADA MUNICIPAL CORPORATION.
Construction of CC Culvert & CC Approach Road from Municipal office (Opposite South Side Road) to Jorige Jagannadha rao House(Dno.16-11-3) in 21st ward in Sattenapalle Municipality-2nd call
Providing CC road from Kotakadapalle BT road to Diguvamurthyvaripalle Approach road and from Venkatamuninaidu house to Venkatapathi house in Diguvamurthypalliof Bodevandlapalli GP in Yerravaripalem Mandal of Tirupati District Item No 27
Providing Kerb wall with Chain link Mess fencing from Control room to Zindal Energy Plant (LHS) and formation of approach road to the C & D Waste Plant at Kappuluppada Dumping Yard
Providing CC approach road from D.No. 16-15-116 Rayapalli Veerababu house to Ganisetti Nanaji house D.No.106-15-116/a (beside Sri Gowtham budda park) in Sattamma peta 18th ward
Construction of CC Culvert & CC Approach Road from Municipal office (Opposite South Side Road) to Jorige Jagannadha rao House(Dno.16-11-3) in 21st ward in Sattenapalle Municipality-3rd call
Gravel road repair to Sri Ardhanareswara swamy temple belongs to SKHT devasthanam
Formation of Internal road House sites in Survey Nos 57/1B, 58, 66/2, 88/1A of Yeleswaram Nagar Panchayat. Under Navartnalu Pedalandariki Illu
Formation of Internal road House sites in Survey Nos 57/1B, 58, 66/2, 88/1A of Yeleswaram Nagar Panchayat. Under Navartnalu Pedalandariki Illu.
Laying of CC Road and CC Drain and CC CUlvert at Sundarayya COlony internal road in ward no 61 of Gajuwaka zone of GVMC
Renewal BT Road by Hot mix process with plastic waste from Sai Brundavanam to Madhuranagar internal road in ward no 13 of Zone-II
Providing Internal Road and Drains in Minority Colony at Kosigi (V) of Kosigi Mandal in Kurnool District, Estimate Cost Rs.50.00 Lakhs (2nd Call)
Formation of Internal Road as access infrastructure to the Proposed project of Palle as ethnic arts and Handcraft village at Madhurawada in Vishakhapatnam District
Construction of pucca internal road and drain from R&B road (h) to palla surivavu(h) in pllavuru h/o golugonda ch.nagapuram(10390454)General
1.Approach road to Kothapeta SC area of Likhithapudi(V) of Narasapur(M),Rs.40.00 lakhs,2.Construction of road to Mallavaram village in Narasapur(M),Rs.50.00 lakhs,3.Providing metal road to SC area in Mallavaram(V) of Narasapur(M),Rs.10.00 lakhs,4.Providing metal road to Arundhatipeta in Mallavaram(V) of Narasapur(M) & Constituency,Rs.10.00 lakhs (4works), Total Est.Rs.110.00 lakhs
CONDUCTING DGPS SURVEY FOR THE ROAD WIDENING AND STRENGTHENING OF GUDUR -THUPILIPALEM ROAD FROM KM.12/2 TO 23/0 IN SPSR NELLORE DISTRICT (FOREST REACH FROM KM.15/9 TO 17/7)
Kalyandurg Municipality - Repairs of pipe line and replacement of distribution system from Vasavi Kalyanamantapam to Govt Hospital damaged in road Widening with 160 mm dia HDPE pipes under Adverse Seasonal Conditions - SDRF -2017
Providing CC Road and Road widening from Chitrai cheruvu gattu from D.No.33-1-4 Meda Dharma Rao house to Municipal Limits to towards North Borravari Layout in 17th ward in Palacole Municipality
Providing new 200mm dia PVC-U sewer line from Sai Baba temple to Timber Depot NH-16 Highway in the road widening stretch of Shivajipalem Main Road, Ward No. 22, East Zone, GVMC.
Providing Wet Mix Road at Road widening Portion both sides Gardens main Road from Rajendra nagar 2nd line to Rajendra Nagar 5th line in Div.No.38 under AE-2 Section, Guntur Municipal Corporation.
Providing new 200mm dia PVC-U sewer line from Sai Baba temple to Timber Depot NH-16 Highway in the road widening stretch of Shivajipalem Main Road, Ward No. 22, East Zone, GVMC.
Shifting of 280mm, 110mm dia HDPE Pipe, MS Pipes Y Junction to Kurmannapalem Arch (left side) for Kurmannapalem NH arch to Simon Nagar Junction Road widening portion in ward No. 86 of GVMC
Shifting of existing 500mm dia DI Gravity main pipe line from Simhachalam RTC complex opposite to Existing Valve Chamber at Kummari Dhibba for Simhachalam road widening in 98th ward of Zone-VIII, GVMC
Shifting of 140mm dia HDPE distribution pipe line at Kanithi Road due to road widening from New Gajuwaka junction to Culvert in ward No.66 in AE 1MGD section of Zone-VI, GVMC