Loading…
Loading…
8,037 results • Best match
Maintenance of Rural roads (a) G Medapadu to Marripudi (via) G Kothuru from km 0/0 to 6/0 (b) Kattamuru Junction to J Thimmapuram from km 0/0 to 5/700 (c) Marlava to Tatiparthi (via) Tirupathi Chandramampalli from km0/0 to 6/920 for the year 2016-17 (Package No 1) (2nd call)
Maintenance of Rural roads (a) G Medapadu to Marripudi (via) G Kothuru from km 0/0 to 6/0 (b) Kattamuru Junction to J Thimmapuram from km 0/0 to 5/700 (c) Marlava to Tatiparthi (via) Tirupathi Chandramampalli from km 0/0 to 6/920 for the year 2016-17 (Package No 1)
Package No. 5 Annual maintennace of packaged rural roads. (1) Samanthapudi - Boddikurapadu road Km 0/0 8/0 (2) Mundlamuru - Singannapalem road Km 0/0 to 10/2 (3) Pasupugallu to Eedara road Km 0/0 to 12/6 (4) Jammalamadaka to Makkenavaripalem road Km 0/0 to 6/100 for the year 2016-17
Comprehensive maintenance to various computer systems and printers at State Roads, administration, state architect, Rural Roads, Quality control, Buildings, D&P, Electrical & NH wings in the O/o Engineer- In-Chief(R&B) New HOD office building at MG road Vijayawada AP for the financial year 2018-19 i.e from 01.04.2018 to 31.03.2019(12 months)
Providing Junction Improvement of Gokul junction in Kadapa town, YSR District under the main work of "A) Annamaiah Circle to Krishna Circle:-(Widening and Strengthening of Road from NH-18 to Km 1/3 of CRA Road (Via) Kagithalapenta, Kotireddy Circle, ... and Strengthening of Road from ...
Construction of Toilets, Water Supply,Electrical and Internal road works to BC colony Hindu & Christian Burial Grounds at Budampadu in Div no.16 Under AE-15 Section
Widening of road from Rajeev marg Road Junction of RS road to Mahaveer Circle 19th division Kadapa Municipal corporation and paver blocks infront of Gandhi nagar school (PF Off road) " Road from Venkateswara theatre to Industrial estate (via) Collecto's Bungalow from Km 0/600 - 1/0)"
Widening of road from Rajeev marg Road Junction of RS road to Mahaveer Circle 19th division Kadapa Municipal corporation and paver blocks infront of Gandhi nagar school (PF Off road) " Road from Venkateswara theatre to Industrial estate (via) Collecto's Bungalow from Km 0/600 - 1/0)"
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Retaining Walls etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability Period under Lump sum contract
Formation of Internal roads with Earth and Gravel to Road No 15 to 25 at Layout for House Plots in RS No : 57, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68 & 69 in PYDIPARRU(V), TANUKU(M) for House sites under Navaratnalu-Pedalandariki illu Scheme in Tanuku Municipality
Formation of Internal roads with Earth and Gravel to Road No 15 to 25 at Layout for House Plots in RS No : 57, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68 & 69 in PYDIPARRU(V), TANUKU(M) for House sites under Navaratnalu-Pedalandariki illu Scheme in Tanuku Municipality
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Retaining Walls etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability Period under Lump sum contract
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 72Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Amancherla at Amancherla(V), Nellore (M), SPSR Nellore Dist under MSE CDP (2nd Call).
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 34Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Mutyalacheruvu at Mutyalacheruvu(V), Kadiri(M), Sri Satya Sai Dist under MSE CDP
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 50Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Yerraguntla at T.Sukesula(V), Yerraguntla(M), YSR Kadapa Dist. under MSE CDP (2nd call).
Construction of CC Internal Roads a) Maheswara rao House (D.No-107) to Y.Sitham Naidu House (D.No-108), b) Ravana House ( D.No-199) to T.Ramu House (D.No-151/18) and c) R.Nathanyel House (D.No-117) to K.Srinivasa House (D.No-161) at south side Dhadithallamma colony in ward No-12 of Bobbili Municipality.
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 34Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Thimmasamudram at Thimmasamudram(V), Kalyandurg(M), Ananthapuramu Dist under MSE CDP (2nd Call).
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 34Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Penukonda at Penukonda(V), Penukonda(M), Sri Satya Sai Dist under MSE CDP.
Providing Power infrastructure by laying of 11KV/LT 3-Ph 5 wire lines along the Proposed internal roads including Shifting of 33KV & 11KV lines and Providing 76Nos of 90W LED street lights on 9.0Mtr long Octagonal poles at Industrial Park 5-Venkatapuram, Chittoor District under MSE-CDP Scheme (2nd Call).
Providing power infrastructure by erection of 11kV/LT Line along the proposed internal roads with required Distribution Transformers and Providing 43Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at IP-Daduluru at Daduluru(V), Kanaganapalli(M), Sri Satya Sai Dist under MSE CDP
Providing Power Infrastructure by erection of 11kV /LT Lines along the internal roads with required Distribution Transformer along with Shifting of existing Electrical lines and Providing 42 Nos 90W LED street lights on 9Mtr long octagonal single arm poles along the proposed roads at MSME Park Kukkarajupalli, Thambalapalli (M), Annamayya District.
Construction of CC internal Roads from a) CH.Govinda Rao house (D.No-116) to Majji Apparao House (D.No-128) , b) Venugopla Naidu House (D.No-106) to Y.Radharani House (D.No-174) and c) G.Someswara rao House (D.No-137) to Santhi House (D.No-123) at Dhadithallamma colony in ward No-10 of Bobbili Municipality.
Periodical Maintenance of Roads Constructed under PMGSY in Puthalapattu Constituency, 5 works of length 8.10 Km in Chittoor District, Est Cost: Rs 75.00 Lakhs
Periodical Maintenance of Roads Constructed under PMGSY in Puthalapattu Constituency, 5 works of length 8.10 Km in Chittoor District, Est Cost: Rs 75.00 Lakhs
Special repair of roads from entrance and exit main road to INS Virbahu and interlocking paver blocks of either side of road and repairs to drainage system from entrance and exit main road to INS Virbahu through DGNP Gate at INS Virbahu Visakhapatnam
Formation of BT road from Pulla - Gopalapuram link road to EGK road via Sarabhapuram and Sentini factory in Dwarakatirumala Mandal of Gopalpuram Constituency, Est. Rs.132.00 lakhs.
Urgent Repairs to Link road from Madras - Calcutta Road (Old NH5) to AIIMS, Mangalagiri (WEST Side Entrance) from Km 0/0 to 0/6 in Guntur District
Annual maintenance of Link road from Narayanadri Hospital junction to Tiruchanoor via 150 feet by pass road up to Pudi road joining for the year 2022 23
Intensive Patchwork to the road Link road connecting NH 9 to NH 5 through Indrakeeladri Tunnel road from Km 0 000 to 5 440 in NTR District
RECONSTRUCTION OF CD WORK AND ROAD DAM AT KM 2/4 TO 3/0 OF KOTA - CHITTAMUR ROAD WITH A LINK ROAD TO TIRUMUR IN TIRUPATHI DISTRICT
Formation of BT Road for the link road from Kandulavaripalli main road to Thulasamma indlu road via Krishnamanaidu poultry forms in Ganeswarapuram GP of RC Puram Mandal
Temporary restorations to Link road connecting to NH9 to IK road via Rayanapadu Pydurupadu Kavuluru Kattubadipalem road from Km 0 000 to 13 700 in NTR District
Annual maintenance of Link road from Narayanadri Hospital junction to Tiruchanoor via 150 feet by pass road up to Pudi road joining for the year 2022 23
Construction of Distribution canteen at Launch Complex area _Dining hall for 300 seats_ SDSC SHAR, Civil and Road Works
Augmentation to Gate-I Entry and Security related facility at Gate-I SDSC SHAR - Package B - BT Road Works
Package No.AP01 CRR IX Consisting of six road works in Amadaguru and ODC Mandals Est cost Rs.115.85 Lakhs
Construction of PS1/PSO-XL Hardware Processing cum storage facility at VALF SDSC SHAR, Civil, PH and Road works
Rehabilitation of 24 Road works under Package No. MRR2 / GNT / 05 in Mangalagiri constituency of Guntur District.Est.Rs. 146.00 Lakhs.
Package No. APAM/WG/Tanuku/02, Consisting of 04 Road works in Tanuku Constituency, Est. Cost Rs.195.00 Lakhs
Package No. APAM/YSR/Kamalapuram/03, Consisting of 10 Road works in Kamalapuram Constituency, Est. Cost Rs.422.99 Lakhs
Package No.AP02 PRRP-II Consisting of 16 road works in Nallamada & Puttaparthy Mandals of Puttaparthy Constituency Rs.80.40 Lakhs
Package No.AP02 PRRP-III Consisting of 19 road works in Bukkapatnam & Kothacheruvu Mandals of Puttaparthy Constituency Rs.139.80 Lakhs
All Approach Roads formation and Metal topping of existing roads for Propellant complex at HOCL, Rasayani, Mumbai, Road Works
Rehabilitation of 24 Road works under Package No. MRR2 / GNT / 05 in Mangalagiri constituency of Guntur District.Est.Rs. 146.00 Lakhs.
Package No.19 cosisting of 7 road works in Narsipatnam Constituency of Visakhapatnam District. Est. Cot. Rs.314.59 Lakhs
APAM/TPT/Chandragiri/01 of Chandragiri Constituency of Tirupati Dist. of 8 Road works Estt. Cost Rs.247.92 Lakhs
Package 9 APAM/ASR/Paderu/09 consisting of 2 road works in Koyyuru mandal Est Cost Rs. 300.55 lakhs
Package No. APAM/WG/TP.Gudem/03, Consisting of 05 Road works in Tadepalligudem Constituency, Est. Cost Rs.149.68 Lakhs
Package No.10/APRRSP/Roads/2025-26 (Strengthening of 53 road works) in Guntur District Est. Cost Rs. 80.50Crores
APAM/TPT/Nagari/02 of Nagari Constituency of Tirupati Dist. of 7 Road Works Estt. Cost. Rs.452.50 Lakhs