Loading…
Loading…
8,037 results • Best match
Main Work: Construction of 'Road Over Bridge' in lieu of L.C.No.7 at Railway Km.12/2-4 of Samalkota - Kakinada Section and on Nageswararao street from Kakinada - Rajahmundry road at Z.P. Junction to NH-214 at Bhanugudi Junction in Kakinada City limits in E.G.Dist Sub Work: Providing Road Safety Intervention items to the Road Over Bridge (2nd call)
MAIN WORK: Providing 80Nos of 9 Mtrs long Octagonal decorative double Arm poles with 2x70/72W LED street light fittings along MR2, 85Nos.of 9 Mtrs long Octagonal single Arm poles with 1x70/72W LED street light fittings along the roads of CR12, CR13, ... the internal roads (BK ...
CONSTRUCTION OF 400 BEDDED 350 AND 50 SUPER SPECIALITY HOSPITAL GROUND PLUS SEVEN FOR ESIC AT SHEELANAGAR VISAKHAPATNAM ANDHRA PRADESH SUB HEAD PLANNING DESIGNING AND CONSTRUCTION OF BUILDINGS DEVELOPMENT WORKS BULK SERVICES HORTICULTURE WORKS ... PLANT INTERNAL ROADS PATH ...
MAIN WORK: Providing 80Nos of 9 Mtrs long Octagonal decorative double Arm poles with 2x70/72W LED street light fittings along MR2, 85Nos.of 9 Mtrs long Octagonal single Arm poles with 1x70/72W LED street light fittings along the roads of CR12, CR13, ... the internal roads (BK ...
MAIN WORK: Providing 80Nos of 9 Mtrs long Octagonal decorative double Arm poles with 2x70/72W LED street light fittings along MR2, 85Nos.of 9 Mtrs long Octagonal single Arm poles with 1x70/72W LED street light fittings along the roads of CR12, CR13, ... the internal roads (BK ...
Construction of Office cum Lab Building (stilt and 4 floors) for MPEDA at Bhimavaram, W.G. Dist. AP. SH: Balance works of building including internal water supply and sanitary installations, sewerage system, drainage & development of site, internal roads...
Construction of 100 bedded ESI Hospital building and 32 Nos Residential quarters (Ty-IV Spl-2Nos, Ty-IV - 6 Nos Ty-II-16 Nos,Ty-III-18 Nos) including development and bulk services, internal water supply, Sanitary installations, Internal roads, Storm water drains,UG Sump,STP-90KLD,Compound wall etc.SH:IEI & Fans , Street Lighting,Pump sets , Sub-station,DG Set,20 Passenger cum stretcture Lift,and 13 Passenger MRL Lifts for quarters,CC TV System, Automatic Fire Alarm System,and PA System,Manual Fire Alarm System,LAN System with switches,UPS System,Solar water heating System, IP based PBX System,Centralized AC System,and building management system for ESIC at Rajamahendravaram SW: Providing UPS System,LT Service connection and Split AC to Office of EE ,CPWD,Rajamahendravam and site office. Subwork/Packages: Providing UPS System,LT Service connection and Split Airconditioners to O/o EE,CPWD,Rajamahendravaram and site office.
Package No.56/APRRP/PRED/CTR/ROADS/012 consists of 22 road works in Kurabalakota, Peddamandyam, B.Kothakota, Molakalacheruvu, P.T.M and Thamballapalle mandals in Chittoor district
Package No. 55 APRRP PRED CTR ROADS 011 consists of 78 road works in Kurabalakota Peddamandyam B.Kothakota Molakalacheruvu PTM and Thamballapalle mandals in Chittoor District
Package No.53 APRRP PRED CTR ROADS 009 Consists of 107 road works in Punganuru Somala Sodum Pulicherla Rompicherla and Chowdepalle mandals in Chittoor District
Package No. 54/APRRP/PRED/CTR ROADS/010 consists of 27 road works in Punganuru, Somala, Sodum, Pulicherla, Rompicherla and Chowdepalle mandals in Chittoor District
Laying of CC Road & Construction of 300 mm vent CC Drains on both sides from Peyyala Ramarao House (D.No 8-23-24) to Dakoji Haribabu House at 1st lane,Gayatri Colony in the Premises of Latchayyapeta -01 Ward Secretariat in Ward No.12 of Rajam Municipality.
Construction of CC Road and CC Drain from D.No 10-3-38 to D.No 10-3-25/4 in Mutrasula punta and to ESI dispensary road & Construction of CC Drain from MIG -156- 3 TO HIG1A - 106 IN Housing Board Colony in 9th Ward in Bhimavaram Municipality.
2023-Eng04-GN-136Widening of (60') existing Town Main Road , Construction of bothe side drains, footpaths and along with central median from Kotha road junction to Vizag Emporium Dr.No.25-8-31 in ward no.38 and 39 of Zone-IV,GVMC.(Est Amount Rs.172.20Lakhs)
Laying of CC Road & Construction of 300 mm vent CC Drains on both sides from Peyyala Ramarao House (D.No 8-23-24) to Dakoji Haribabu House at 1st lane,Gayatri Colony in the Premises of Latchayyapeta -01 Ward Secretariat in Ward No.12 of Rajam Municipality.
2023-Eng04-GN-136Widening of (60') existing Town Main Road , Construction of bothe side drains, footpaths and along with central median from Kotha road junction to Vizag Emporium Dr.No.25-8-31 in ward no.38 and 39 of Zone-IV,GVMC.(Est Amount Rs.172.20Lakhs)
Laying of CC Road & Construction of 300 mm vent CC Drains on both sides from Peyyala Ramarao House (D.No 8-23-24) to Dakoji Haribabu House at 1st lane,Gayatri Colony in the Premises of Latchayyapeta -01 Ward Secretariat in Ward No.12 of Rajam Municipality.
Laying of CC Road & Construction of 300 mm vent CC Drains on both sides from Peyyala Ramarao House (D.No 8-23-24) to Dakoji Haribabu House at 1st lane,Gayatri Colony in the Premises of Latchayyapeta -01 Ward Secretariat in Ward No.12 of Rajam Municipality.
Intensive Patchwork repairs of a) Link road connecting P.N.Road, T.K.road From Km 0/0 to 1/4 and Bypass road to Srikalahasti town connecting P.N. road and T.K.Raod from Km 0/0 to 2/9 b) Srikalahasti to Pallampeta (via) Pillamedu, Kanparthi from Km 8/0 to 27/8 c) Kothakandriga Byrajulakandriga road from Km 0/0 to 8/4 d) Kalahasti-Kasaram-Gollagunta Road from Km1/2 to 2/8 & Km 11/4 to 20/3 e) Kanaparthy road to Pennalapadu via Pudi S.T. Colony upto Srikalahasti Byepass road in Tiruapti District.
Package No.AP19PVT102 L050 Road from Kondru Road to Thaggupadu in Pedabayalu Mandal of Alluri Sitharama Raju District, Est.Cost.Rs.790.00Lakhs Rs.60.60Lakhs for Routine Maintenance
Package.No.AP26PVT146 L057 Road from Ubbengula road to Monjaguda in Munchingputtu Mandal of Alluri Sitarama Raju ASR District.Est. Rs.93.52 Lakhs Mt. Rs.6.08 Lakhs
Main Work Construction of road over bridge at km 1.2 of Guntur to Amaravathi Road in Guntur Muncipal Corporation limits in lieu of LC. No.497A of Railway km 0.5 to 6 in between Guntur to Nallapdu Section in Guntur District. Sub Work Consultancy Services for Preparation of Designs and Drawings of Railway proper and getting them proof checked from IIT
SW-1-Vijayawada Division - Gudur(GDR)-Vijayawada(BZA) Section -Proposed Construction of Road under bridge (RUB) in Lieu of LC No.112 at Rly.Km. 168/16- 18 Between Vedayapalem and Nellore Stations, RUB with RCC Box Size of 1 x 6.0m x 4.80m (Box Air-Pushing Method) and Retaining Wall (on Grand trunk Road side & Mini Bypass). IRPSM ID.11.00.30.13.1.47.021 Year 2013-14
Package no.AP05PIII AMPHLB1-Construction of H L B across Drain at Km 0.700 of Amalapuram Black Bridge to Mukkamal Lock in Amalapuram Mandal in East Godavari District (6th Call), Est.R.145.00 Lakhs, PMGSY-III
Package No.APGNT-PMGSY/2018-012 (consisits 3 works) Package estimate Cost Rs.70.00 Lakhs 1.Periodical maintenance of Road from BBR Road to Dasaripalem Via Kannegantivaripalem in Bhattiprolu Mandal of Guntur District Est. Cost Rs.30.00 lakhs 2.Periodical maintenance of Road from Vemuru to Chadalawada Via Kakarlamudi in Vemuru Mandal of Guntur District Est. Cost Rs.15.00 lakhs 3.Periodical maintenance of Road from Nizampatnam Canal to Koruthadiparru of Amarthaluru Mandal in Guntur District Est. Cost Rs.25.00 lakhs Est. Cost :Rs.70.00 lakhs
Package No.APGNT-PMGSY/2018-012 (consisits 3 works) Package estimate Cost Rs.70.00 Lakhs 1.Periodical maintenance of Road from BBR Road to Dasaripalem Via Kannegantivaripalem in Bhattiprolu Mandal of Guntur District Est. Cost Rs.30.00 lakhs 2.Periodical maintenance of Road from Vemuru to Chadalawada Via Kakarlamudi in Vemuru Mandal of Guntur District Est. Cost Rs.15.00 lakhs 3.Periodical maintenance of Road from Nizampatnam Canal to Koruthadiparru of Amarthaluru Mandal in Guntur District Est. Cost Rs.25.00 lakhs Est. Cost :Rs.70.00 lakhs
Package No. AP GNT-PMGSY/2018-004: 1)Periodical Maintenance of R/F CPT-NRT R&B Road to Kesanupalli via Kanaparru in Nadendla Mandal, Estimate Cost Rs.45.00 lakhs, 2)Periodical Maintenance of road from CPT-Sandepudi R&B Road to Chirala-Pedanandipadu R&B Road to Manukondavaripalem in Chilakaluripet Mandal, Estimate Cost Rs.15.00 lakhs and 3)Periodical Maintenance of road from CPT-NRT R&B Road to Lingamguntla in Chilakaluripet Mandal, Estimate Cost Rs.5.00/15.00 lakhs, Package Estimate Cost Rs.65.00 / 75.00 lakhs
Construction of Road between filling shed and LPG Pump House and in front of Unloading Shed at Vijayawada LPG BP
Architectural and structural design and construction of Office cum Lab building (Stilt and 4 floors) for MPEDA on EPC basis including Internal water supply, & Sanitary Installations, Sewerage system, Drainage & Development of Site, Internal Roads & Paths, External sewer lines, External water supply lines, Storm water drains,Rain water harvesting pits, Boundary wall, UG Sump, Septic Tank, Bore Well, Horticulture Development etc., and Internal & External Electrical Installations, Fans, Power wiring and plugs, Lightening conductors, Telephone conduits, Fire Fighting with wet riser and sprinkler system, Automatic Fire Alarm system, SITC of Lifts, 11KV/0.433KV Substation, DG set, VRV/VRF System, Online 3 phase UPS system, Grid Interactive Roof Top Solar Photo Voltaic Power Generation System, Water supply pump sets, IP based CCTV system, LAN system, IP based EPABX system, LED street lighting, Exhaust System, Insulated Mini Cold Storage System, Split Type AC Units etc., at Bhimavaram, W.G.,
Package No.AP26PVT134 L055 Road from Pandigunta to Limmagunta in Pedabayalu Mandal of Alluri Seetha Ramaraju District, Est.Cost.Rs.84.00Lakhs Mtc.Rs.6.44 Lakhs
Package No.AP19PVT100 L049 R and B Road to Vedurugoi via Lingeruputtu in Pedabayalu Mandal of Alluri Sitharama Raju District, Est.Cost.Rs.420.00LakhsMtc.Rs.32.20Lakhs
Package.No. AP26PVT136 L040 Vedurupalli PR Road to Pedaporlu of G.Madugula Mandal in Alluri Sitharama Raju District, Est.Cost.Rs.295.23 Lakhs Mtc.Rs.19.40 Lakhs
Package No. AP26PVT 137 L041 Road from S.Boddaputtu PR Road to Sindugula in GMadugula Mandal of ASR District , Est. Rs109.78 Lakhs
Package.No.AP19PVT106 L042 Road from PR Road to Mondigumma in Munchingput Mandal of Alluri Seetharamaraju ASR Dist .Est. Rs.60.54 Lakhs Mt. Rs.4.09 Lakhs
Package No.AP26PVT150 L029 Road from Dasarithota to Mettapalem of Ananthagiri Mandal of Alluri Seetharama Raju District, Est. Rs.373.11 Lakhs Mtc.Rs.24.24 Lakhs.
Package No. AP19PVT130 L039 Neyyalabanda PR Road to Nittamamidi in G.Madugula Mandal in Alluri Sitharama Raju District, Est.Cost.Rs.350.22 Lakhs Rs.23.02 Lakhs for Routine Maintenance.
Package No.AP26PVT132 L044 Road from NH516E at Sapthagiri resorts to Chittamgaruvu in Chinthapalli mandal of Alluri Sitharamaraju District. Est. Cost Rs. 74.60Lakhs Mtc. Rs. 2.60 Lakhs
Package No.AP26PVT001 L030 Road from Singarbha PR Road at 4/0 to Gondhivalasa of Ananthagiri Mandal of Alluri Seetharama Raju District, Est. Rs.189.00 Lakhs Mtc.Rs.12.31Lakhs.
Package No.AP26PVT135 L042 Road from Thadipalem to Gedelabanda via Suvvapadu in G.Madugula Mandal of Alluri Seetharama Raju District, Est. Rs.204.85 Lakhs Mtc.Rs.13.42 Lakhs.
Package No. AP26PVT140 L043 Road from M. Bheemavaram B.T Road to Chilakalapalem of Koyyuru Mandal in Alluri Sitharama Raju District, Est.Cost.Rs.222.58 Lakhs Mtc.14.47Lakhs
Package No.AP19PVT109 L028 Ballagaruvu to Tunisebu via Dayarthi Madrebu in Ananthagiri Mandal of Alluri Sitharama Raju District, Est.Cost.Rs.1163.00Lakhs Mtc.Rs.75.60Lakhs
Package No. AP19PVT 119 L033 Road from Boddumamidi to Rajulapadu of Koyyuru Mandal in Alluri Seetharama Raju District, Est.Cost.Rs.235.85Lakhs Mtc.Rs.15.33Lakhs
Package.No. AP19PVT091 L035 Road from Sampangiputtu to Surlapalem of G.Madugula Mandal in Alluri Sitharama Raju District, Est.Cost.Rs.221.08 Lakhs Mtc.Rs.14.37Lakhs
Package No.AP19PVT114 L037 Road from Payyarimamidi PR Road to Lakkapadu in G.Madugula Mandal of Alluri Seetharama Raju District, Est. Rs.670.51Lakhs Mtc.Rs.43.59 Lakhs.
Package No.AP26PVT096 L043 Road from Thurubongula to Kilumulu via Karakapalli, Goppugudi in Chinthapalli mandal of Alluri Sitharamaraju District, Est. Cost Rs. 707.20 lakhs Routine Mtc.Cost Rs.24.76 Lakhs
Package No.AP19PVT098 L034 Road from Thurubongula to jaduguru via Chinthalapadu in Chinthapalli mandal of Alluri Sitharamaraju District, Est. Cost Rs.218.70 Lakhs Routine Mtc. Rs.7.66 Lakhs
Package.No. AP19PVT120 L034 Road from Nimmalagondi road to Dekurai of Koyyuru Mandal in Alluri Sitharama Raju District, Est.Cost.Rs.234.00Lakhs Mtc.Rs.15.20 Lakhs
Construction of Balance Infrastructure such as internal Roads, Storm water drains, Water Supply, Sewerage network, Court yard filling, Trunk Mains etc., in the approved layouts of Nuziveedu, Vuyyuru ULBs in Krishna District and Jaggayapeta, Tiruvuru, Nandigama ULBs in NTR District and Addanki in Bapatla District and Kanigiri, Giddalur ULB s in Prakasam District in Andhra Pradesh under AHP PMAY HFA (U) with 2 years defect liability period under Lump sum Contract.
SDRF / S.N.PADU / PACKAGE - 6 ( 6 works ) , Est.Cost Rs:- 34.18 Lakhs (1)Repairs to Road fom O-N,(R&B) Road at 14/0 K.M,to Elurivaripalem (via) P.Gudipadu and Kanaganivaripalem in Santhanuthalapadu Mandal. Est cost Rs:-4.00 lakhs (2) Repairs to the ... fom Approach Road to ...
2023-Eng04-GN-132Widening of (60") existing Town main road , Construction of both side drains, footpaths and along with central median road from Dr .no.25-8-137 (Chicken shop) near Queen Victoria statue to Old post office Junction in ward no.39 of Zone-IV, GVMC (Est Amount Rs.104.30Lakhs)