Loading…
Loading…
3,735 results • Best match
Improvement of road by pdg. CC from H. No. 220 to Saini Chowpal, H. No. 186 to Saini Chowpal, Saini Chowpal to H. No. 270 in Hari Nagar Ashram in ward No. 144, Central Zone
Improvement of road and side berms and construction of drain and footpath from Hno D823 CV Raman Marg to K-185 unit 1 opposite juice shop, NFC D block in ward 89S, Sriniwaspuri, Central Zone
Construction / Improvement of Road by P/L RMC from H. No. E-370 to H. No. 286 Gali No. 8 East Vinod Nagar in Mayur Vihar Phase-II in Ward No. 196/Shah. South Zone
Construction of road on various locations at 18 Qtr. Road Vishwas Nagar Ward No.207 Vishwas Nagar Shah. South Zone
Construction of Brick wall around both sides of lift entrance on FOBs at Munirka, Ullan Batter Marg, RTR Marg, Outer Ring Road Moti Lal Nehru Camp, Dwarka Approach Road Under PWD Division South West Road-I Under Sub Division-I New Delhi.
A/R and M/O to various roads under PWD Division South West Road-1 during 2022-23. (SH- Repair work at Service lane Dwarka Approach Road and Outer Ring Road opposite Malai Mandir and Bersarai U-turn under Sub Division-I.)
(a) Co main gate, parking for staff, approach road, renovation of basket ball court, fencing of court and other misc. works at SBV Tikri Khurd. School Id.1310458, Bldg. Id. 13101923, EOR Id 20181150. (b) Co left over B wall, SKV, Tikri Khurd.
Remodeling of drains of approach road Karawal Nagar Village (Shaheed Dinesh Chand Sharma Marg) from Transformer to Pusta Service road in Karawal Nagar Village in ward no. 248 (Karawal Nagar West) in AC-70 Karawal Nagar in EE(M)-IV Shah (N) Zone
Improvement and Development of approach road From Karawal Nagar road Transformer to pusta road shaeed Dinesh Chand Sharma Marg in Karawal Nagar Village by pdg steel RCC RMC etc., in AC 70 Karawal Nagar, under the jurisdiction of EE (Pr) Shah N Zon
Improvement and Development of approach road and construction of RCC drain (both sides of the road) for Dayalpur Village from Chowdary baba dayala chowk to JR Unisex salon near gali no 6 sadatpur extention in ward 247 Sadatpur, AC 70, Karawal Nagar i
Improvement to drainage system by covering the existing drain with SFRC slab RCC Work (for culvert) and fixing of CC Kerb Stone from Mother dairy (Near ESI Residential Quarters) to ESI Hospital Gate (On Approach Road of Basai Darapur) in Village Basa
A/R and M/O to various roads under PWD Division South West Road-I during 2019-20. SH- Day to Day Maintenance and Disposal of Malba at Dwarka Approach Road and Ullan Battar Road Delhi Cantt Area Under Sub Division-I.
Improvement and Development of approach road From Karawal Nagar road Transformer to pusta road shaeed Dinesh Chand Sharma Marg in Karawal Nagar Village by pdg steel RCC RMC etc in AC 70 Karawal Nagar under the jurisdiction of EE Pr Shah N Zone
Imp./Dev. of C and D waste collection site-By providing barricading construction of an operator room raising of ground level and laying of RMC on approach road to Construction and Demolition waste collection site near Veer sawarkar Hospital in Ward 2
Construction of RMC road, Repair of boundary wall and other misc civil works at Fire Station Shastri Park, Delhi
Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. SH E-Auction for Minor T and P.
Road repair bitumen cold emulsion in 20 ltr drum, Socket Modular type 5 Pin 6 Amps Roma, PVC Pipe 600mm long with steel lining heavy duty with 02 Nos nuts and washers, Fan motor for desert cooler, Stabilizer 4 KVA Voltas
Repair of Roads under jurisdiction of NPD-4 in Sector A9, Narela.
Patch repair of roads of Chattarpur Ward No. 159 M-IV/SZ
Construction of Footpath along both sides of 20m internal roads in Sector G2/G6, Narela sub city.
Cleaning sweeping and scavenging of internal roads, paths and berms in Pkt- 1 and 2 at Jasola
Cleaning and sweeping of internal roads of pocket A and B of sector-26,Rohini, Phase-IV.
Deployment of Environmental Assistant for Cleaning and sweeping of internal roads of Chemical Traders at IFC Narela.
Desilting of S.W. Drain (covered and open) along internal roads in sector 16 (a) and (b), Dwarka
C/o 20 m ROW internal roads at sector G-2/G-6 at Narela Sub-city
Improvement of internal roads, drains and footpaths of 12m, 20m R/W road in Sector-4, Dwarka.
Replacement of deep water line on link road form Gali No 02 to 07 in well leveled area of Saboli Khadda in Gokalpur AC-68 NE-I Re-invited
Improvement of damaged service roads of various type of GPRA Qtrs at Sector-3, R.K. Puram, New Delhi dg 2022-23 (SH: Repair of roads near Qtr. No. 685-700, 609, 628, 217 to 228, 237 to 248, 269 to 284, 769 to 776 & 793 to 796).
Strengthening of Swami Narayan Marg Nand Lal Marg Link Road Leelawati School Road and Pratap Nagar Road under PWD Division North West Road1 under Sub Division NWR13 During 2022 23
M O Various colonies Under East Zone SH Day to day cleaning sweeping and scavenging of Link road from road No 13A to Mother dairy T point pkt 11 Jasola
Improvement of various Roads under Sub-Division-I of SRD Project Division-II, PWD, New Delhi during 2020-21. SH Providing and fixing MS Grill on Footpath at Link Road.
Construction of Crash Barrier at Noida Link Road, under Sub-Division East Road-IV of Division East Road/(M-212), PWD Delhi during-2024-25. (SH- Civil and Electrical works).
Strengthening and Major Maintenance of the Rohtak Hisar Sec of NH09 From Km. 93.140 to 182.500 and Link road 09.450 Km total length 98.810 Km in Haryana on PBMC mode
Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. SH- E-Auction for Minor T and P.
Upgadation work of 45 47 and 33 Rajpur Road Residential Colony under Sub Division M 3231 at 16A Rajpur Road Civil Lines Delhi 110054 dg 2024 25 SH Internal Road and Drainage development work
EOR to Residential Quarters at KIT Campus under PWD NWB, Sub Division-IV Delhi during 2026-27. (SH- Repair of Internal Road, Storm Water Drain, External Finishing Work of Quarters and Other Misc. Works)
Construction of road and drain from Noida Sweets to Saurav Vihar Kabirstan in Badarpur AC-53.
Construction of road bearing Kh. No. 175 at village Badusarai in Matiala Assembly Constituency AC-34.
Construction of Road and repair of Drain in Begumpur village in Malviya Nagar Constituency AC 43.
Construction of road from Gagan Vihar Barat Ghar to School chowk in Badarpur Constituency AC-53..
Demolishing and re-construction of road and culverts at various location in Badarpur Assembly Constituency-53.
Construction of road and drain from 40 ft. to sector 37 bypass in Badarpur AC-53.
Construction of road and side drains 5,6,8,10,12,17,20,21,22,23 at Tughlakabad village in Tughlakabad Constituency in AC-52.
Construction of road stretch near Gazipur FOB at Road No. 56, cut by Delhi Jal Board
Construction of road and gully traps in streets of Okhla village in Okhla Constituency AC-54
Construction of road and side drains at H-Block Lal Kuan in Tughlakabad in AC-52.
Maintenance and Payment of electrical consumption charges of street lighting on PWD Roads under North Zone, Delhi. SH Providing of LED Street Light for Improvement of Road No. 43 from Britannia Chowk to Rani Bagh, Delhi
Improvement of road by pdg. CC from H. No. 139 to 131, H. No. 131 to 132, H. No. 239 to 224 along H. No. 189 in Hari Nagar Ashram in ward No. 144, Central Zone
Strengthening of Swaroop Nagar Road with Construction of footpath on existing drain and improvement of road side berm from Main Burari Road to Kathia Baba Ashram under Sub Division-1, C and ND-Road Division Delhi.
Construction of Road by pdg RMC and Imp of drainage system from Community hall to Chhat Ghat , Aman Vihar in ward no 41 in Rohini Zone AC-09 (Kirari)