Loading…
Loading…
10,892 results • Best match
ROFD in Km. 0.900 to 1.060, P.L cement concrete pavement in slushy reaches and construction of R.wall a t various RDs
SH F/C in 5/7 mtr wide road at RD 0/525 to 0/885
C/o 5/7 mtr wide formation cutting from RD 0/430 to 0/458)
SH Providing and laying 80mm thick paver block from 0.715 to 0.750
SH FC CD GSB road side drain parapets and Km. Stone Km.0.00 to 4.240 L-123 i.e. five year maintenance Package No.HP01159 Under PMGSYII for the year 2018 19
SH Providing and laying 80mm thick paver block from 0/645 to 0/715
C/O Retaining wall
SH F C 5 7 mtr wide road at RD 3.765 to 4.700 )
P/L CC work in km. 0/210 to 0/330
C.C Pavement at km 0/969.50 to 1/030 (MMSY)
SDP.2024.203, C.O Construction of Road to Village Raipur in G.P. Raipur, SH C.O 3.00 Mtr. Span RCC slab culvert near ward no. 05, Kabirpanthi Mohalla in G.P. Raipur Under SDP
Balance work Construction of road leading to Baragaon from HIMUDA Block No 7 11 and 12 ward No 30 Kangna Dhar (Ph II) under Grant in Aid received from Director (UD)
Construction of road from shayar to kufer km. 0/00 to 0/750 (SH C/O Hume pipe culvert along with both side wing wall at RD. 0/270 to0/274
Re construction of road side drains along old Nangal Una road both side drains from Basdehra chowk to H/o Smt. Banti Devi in ward no.07 , M C Mehatpur Basdehra
Construction of road from Mahaavtar Kamdhenu Gaushala Thaplan to Check Dam (SH .P/L GSB, WMM and M/T between Km. 0/0 to 0/350 and construction of R/wall).
(SH- 30mmthick Bituminous concrete in between Km. 20/0 to 21/0) PMGSY
(SH- 30mmthick Bituminous concrete in between Km. 19/0 to 20/0) PMGSY
(SH- 30mmthick Bituminous concrete in between Km. 21/0 to 22/0) PMGSY
including five year maintenance under PMGSY-II Batch0I 2019-20 RPP-II HP03151
including five year maintenance under PMGSY 2017-18 (Stage-I to Stage-II)
Package No. HP08-402 under PMGSY Financial Incentive for the year 2024-25
Construction of Challa Panjoh Chilbanglow road Construction of Retaining wall at RD 0/820 to 0/845 and 1/680 to 1/695
Construction of Sultanpur Draman road Construction of Retaining wall at RD 0/360-370, 0/395-419, 0/490-520, 0/660-680
Providing and Laying patch work, Maintenance of drain and Maintenance of berms, 25 mm thick Bituminous concrete and thermoplastic paint line between km. 0/00 to 6/00).
SH- Providing Patch Work in Baldiyan Dharampur Road Km. 10/00 to 16/500, Link road to village Gharkhan km. 0/00 to 3/00 and link road to village Khatnol km. 5/500 to 10/00
) C/O link road from Tarmati to Tana jubber road in km. 0/00 to 3/535, NAbard (II) c/o Link road from Kogi to Dagog in km. 0/00 to 1/045 under State Head
Construction of Drainage with RCC Pipe plus chamber work from culvert to Promod Singh house in Village Radoh and Repair of road from Talab to Promod Singh house in Village Radoh G.P Sunet SH Construction of drainage with RCC Pipe U shape drain layi
SH- Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/400
SH- Providing and laying 25mm thick Mix Seal Surfacing with Paver Finisher in Km. 2/000 to 3/000
Providing and laying 30mm single layer bituminous concrete (HP0404VR014615103) km. 0/510 to 1/240
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 2/000
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/600
Providing and laying built-up spray grout, bituminous concrete in Km. 2/000 to 3/000)
SH-Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 0/000 to 2/000
SH - Providing and Laying 25mm thick Mix Seal Surfacing with Waste plastic using hot mix plant and paver finisher in km 1/0 to 2/0
SH -Providing and laying 25mm thick seal surfacing with plastic waste using hot mix plant and paver finsher and hot thermoplastic compound in km 0/000 to 1/000
SH- Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 6/000 to 6/750
Providing and Laying 25 mm thick Mix seal surfacing with Paver Finisher in km 0/000 to 1/00,1/00 to 2/00 and 2/00 to 3/00
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 2/000 to 2/450
P/L Cement concrete Pavement in km 1/045 to 1/075). (under MMGSY)
Removal of slip loose material and boulders etc at Surge Shaft approach road of 3x42MW Larji HEP from RD 565 m to RD 655 m
SH C O Kharanja Stone soling ,PCC 1 4 8 approach road , P L block in Ground and fencing around the PHC building at Sheelghat
Construction of link road from Village Sathore via Harijan Basti Parwa Lawhu to Shakholi road km 0/0 to 4/500 (SH- Formation cutting 5/7 Mtr. Wide road , C.D. Works and P/L Soling G-I in Km 0/0 to 4/500 (SW- Formation cutting 5/7 Mtr. Wide roa
Construction of link road from Village Sathore via Harijan Basti Parwa Lawhu to Shakholi road km 0/0 to 4/500 (SH- Formation cutting 5/7 Mtr. Wide road , C.D. Works and P/L Soling G-I in Km 0/0 to 4/500 (SW- Formation cutting 5/7 Mtr. Wide ro
C/O Retaining walls at Rd. 3/030 to 3/060, widening of road at 3/00 to 3/045, Crash barrier at RD. 2/900 to 3/100)(Under SCSP).
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 1/0 to 1/650
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 0/0 to 0/800
Providing and laying Tack coat and Mix seal surfacing in Km. 0/00 to 1/00
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 5/0 to 6/0