Loading…
Loading…
10,892 results • Best match
Formation Cutting in Km. 0/0 to 0/600
SH Construction of Jeepable 3/5 metre wide Ambulance road ROFD at various RDs CD work RCCP WMM and Tarring etc in km 0/0 to 0/500 Under OTMNP Head
C/o wire crate R/wall at rd 1/390 to 1/402.50 and 1/555 to 1/570 V-shape drain at rd 0/00 to 1/300) (Under SCDP)
C/O appraoches in Km 0/270 to 0/296 0/300 to 0/311 both side) (under OTMNP Head)
Construction of 4.00 Mtr. Span culvert at Rd 0/888
Providing and laying 25mm thick bitumen concrete work.
SH C O Retaining wall at Rd 1.860 to 1.875 )
Prov. and laying 2cm thick premix carpet surfacing including seal coat in Km. 0/0 to 1/0
Construction of reinforced cement concrete slab culvert 3.00m span culvert at RD 0/495) (UNDER OTMNP
Widening, C.D. Work, M/T, construction of V-shape drain, Parapets and Retaining wall at K.M. 0/0 to 0/700
SH F/C 5/7 mtr wide road km 0/0 to 0/390
Construction of 900mm dia hume pipe culvert at various R.D.s along with wing walls
C/O wire crate and rock cutting.
SH 900 mm dia HPC at 0.280 , 0.430 and 1.585, BWall at Rd. 0.255 to 0.275, 0.990 to 1.120 , 1.600 to 1.620 , 1.800 to 1.820 and RWall 1.720 to 1.740 , 0.0 to 0.030 . 0.120 t0 0.140)
SH F/C 5/7 mtr wide road at RD 2/735 to 3/300
C/O Hume Pipe Culvert, C/O Wing Wall, C/O R/Wall, C/O B/Walls, Metailng and Tarring
Providing and Laying G III Primer Coat Tach Coat 25mm thick Bituminous Concrete in Km 0/000 to 3/910
Construction of PCC Retaining wall at R.D. 0/960 to 0/980 and PCC Breast wall at R.D. 0/965 to 0/980
SH Prov. and Laying GSB WWM and 25mm thick bituminous concrete in Km. 0/0 to 1/0
SH Construction of 5/7 metre wide road formation cutting including removal of deficiencies CD work Retaining wall and 4.00 metre RCC Hume pipe slab culvert
Construction of PCC Retaining wall at R.D. 0/168 to 0/180 and Retaining wall in wire carte above PCC bond and V-shape drain at various RDs
C/o of B/wall at RD 0/090 to 0/110, C/o R/wall at RD 0/315 to 0/330 and C/o of Hume pipe culvert with 3.00 mtr both side wingwall at RD 0/090, 5/7 mtr wide formation cutting between km 0/525 to 0/600 and Kharanja Stone Soling between km 0/00 to 0/120
SH Construction of Hume pipe culvert at RD 0/540 0/910 and construction of retaining wall in different RDs and formation cutting etc
P/L 30mm thick Bituminous Concrete including Profile correction in Km 0/000 to 1/000
Formation cutting ,Hume pipe culvert at Rd 3/265 ,3/445 along with wire crate wing wall and C.C. Pavement 3/080 to 3/140
Construction of PCC Retaining wall at R.D. 0/730 to 0/748.50
P/L GSB Well , G-II WMM, BC 30mm thick in km 2/400 to 3/00 (MMGPY)
Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/450 and P/L Kharanja Stone Soling in Km 0/000 to 0/450
(SH - Providing and laying 25 MM thick Bitumen concrete laying paver finisher between Km 6/00 to 7/00)
SH Providing laying Metalling Tarring interlocking paver block at Km 11 00 to 11 750 PDNA
Formation cutting in km 0/0 to 0/495
SH Removal of Slips in various Rds between km 0/00 to 1/500
SH- Formation cutting in km 0/0 to 1/200)
SH P L WBM G II G III and Tarring in K M 0 0 to 0 350
S.H CO RWall at R.D. 1.135 to 1.158
Formation cutting 2.75/5.00 metre wide Jeep-able standard K.M. 1/330 to 1/555, Breast wall at R.D. 1/480 to 1/525 and cross drainage work at R.D. 1/0, 1/060 and 1/150
Formation Cutting, R/Wall C/O HP Culvert MT Crate work for dumping site) (Jeepable standard)
SH- Construction of Retaining walls at various RDs (Balance Work)
SH C o B Wall at RD. 2.105 to 2.180)
C/O 10.37 mtr span RCC Slab type culvert at Rd 0/295
SH C.O G.S.B grade I WBM GII and tarring.
SH P/L CD Works at RD 0/190 and 0/815
P/L 25mm thick bituminous concrete in kms0/0 to 1/050 and G-III with 20mm thick premix carpet in patches and U-shape drain in kms 0/075 to 0/175 L/S.
Providing laying 30mm thick bitumen concrete in km. 79.0 to 86.0. MDR Additional AMP for the year 2019-20
ROFD 5/7 mtrs. Wide road at Km. 0/0 to 0/540,C/O R/wall at various Rds. , P/L 900mm dia RCC hume pipe culvert 0/100,0/250,0/360 and P/L M/T in km. 0/0 to 0/540)
SH P/L Cross Drainage work at RD 1/130 and 1/375 and C/o R/wall at RD 1/480 to 1/500)
Construction of 3.00 mtr. Span RCC slab culvert at Km. 1/675).
C/o Hume pipe Culvert 900mm dia at RD 0/910, 1/210 and RD 1/335 alongwith catchpit, Wing wall and Crate Wall ) (Under MPLAD Deposit Work
SH C.O PCC R/wall at RD 0.134 to 0.143 and 0.825 to 0.840 under PDNA
SH Providing and laying Premix Carpet with seal coat including correction layer Km 0/00 to 1/00