(SH Formation Cutting in Km. 0/0 to 0/095. Embankment filling at Km. 0/075 to 0/095, and C/O R/Wall at RD. 0/072 to 0/087, P/L Soling, Wearing, Tarring in Km. 0/0 to 0/095) (Under MMGSY)
Providing and laying cement concrete pavement at RD. 0/180 to 0/218 and 0/375 to 0/765.(Under MMGSY).
C/O HP Culvert at various RDs C/O Wing Wall C/O R/Wall C/O R/Wall in Wire Crate work
P/L C.C.Pavement at RD 1/00 to 1/300
C O 900 mm dia HPC at R.D. 0.0 and B/Wall at R.D. 0.140 to 0.165
P/L 30mm thick Bituminous Concrete including Profile correction in Km. 1/000 to 2/000
(SH- Geoligical investigation of soil/strata, preparation of hydraulic data, detail design and drawing and DPR/Estimate)
SH Metalling Tarring in Km 1/300 to 2/050 C/O 5.00 metre span RCC slab culvert at RD 1/380 with wing wall and C/O V-shape drain in Km 1/300 to 2/050
P/L GSB,WMM and 20mm thick premix carpet with seal coat at RD. 0/00 to 0/260 ).(Under OTMNP).
P/L 30mm thick bituminous concrete in kms 0/0 to 0/700, G-III in pot holes.
P/L 30mm thick Bitumen Concrete including profile correction in km. 2/000 to 3/000 and 3/000 to 3/100
SH C.O Retaining wall at RD 0.370 to 0.389
P/L GSB, WBM, G-II, G-III in KM 4/366 to 4/710, 4/716 to 4/800, 4/830 to 5/106 and 5/107 to 5/470.
SH PL GSB WMM and Tarring between km 0315 to 0550 paver block Const of both side edge wall at RD 000 to 0250 and Retaining wall at RD 0285 to 0315 both side and Const of 900mm dia RCC hume pipe culvert at RD 0493 under MMGSY
Construction of 900mm dia hume pipe culvert at R.D. 0/180 along with wing wall and PCC Retaining wall at various RDs
SH Providing tarring work in Km 0/0 to 0/650
ROFD 5/7 mtr. wide road in km 0/325 to 0/490, P/L 20mm thick premix carpet at RD 0/325 to 0/600 and V-shape drain at RD 0/680 to 0/900 0/950 to 0/990). (under MMGSY)
(SH- F/C 5/7 mtr at RD 1/165 to 1/500)
C/O R/wall at Rd. 0/045 to 0/047.20, 0/072.40 to 0/092.80 and 0/095.80 to 0/099.60) Under MMGSY
P/L GSB, interlocking concrete pavement etc.
Improvement of grade from K.M. 0/105 to 0/195 and construction of cross drainage work at R.D. 0/135 and 0/220) (MMGSY)
C/o R/Wall at R.D. 0/317 to 0/342
SH Improvement of Formation Deficiency between km 0/405 to 0/855
Providing R/wall at Rd 0/085 to 0/102.50 (BASP)
SH P.L Kharanja stone soling between Km. 0.180 to 0.420 and 0.510 to 0.630
Construction of crate work Retaining wall at R.D. 0/695 to 0/710
SH ROFD at Rd 1/795 to 2/000 and Hiring of Excavator Pocklane/L AND T for removal of slip, Shoulder Bearms and maintenance of road Surface etc.As and when required
Formation Cutting in Km. 0/0 to 0/600
SH PL 20mm thick premix carpet profile correction G-III in Km. 0.00 to 01.700.
C/o R/walls at various RDs and GSB ,WMM and P/L premix carpet with seal coat at RD.0/0 to 1/390
C/O interlocking Paver block from Km. 3/00 to 3/130 and C/O Wing Wall from RD.3/040 to 3/045) UNDER MNP
Formation cutting 2.75/5.00 metre wide jeep-able standard from R.D. 0/895 to 1/100
P/L CC work at RD. 0/00 to 0/065.50.
C/o R/wall and B/wall, Hume pipe culvert and Cement concrete pavement
SH Providing and laying WBM G.III and 25mm thick bituminous concrete surfacing in Km. 0.000 to 1.600
Construction of Retaining wall in wire crate at R.D. 1/135 to 1/160 and 1/180 to 1/190) (BASP)
Formation Cutting Metalling and Tarring and C/O Drain in Km. 0/0 to 0/100
Providing and Laying CC Pavement and R.Wall) SCDP
Construction of cement concrete pavement K.M. 0/0 to 1/040
SH Providing and fixing wire crates 0/710 to 0/850 and Hume Pipe Culvert at RD 0/450 under MMGSY
Construction of RCC slab culvert 3.0 metre span at RD 3/430,RCC H/pipe culvert 900mm dia alongwith wing wall at RD 3/020,3/185 and Construction of retaining wall at RD 2/940 to 2/950Under SCDP
SH Providing and Laying GSB Well graged and unlined surface drain at Rd. 0.0 to 1.500
SH C O 900 mm dia RCC Hume pipe culverts at Rd 3 200 3 584 3 790 3 960 4 170 4 300 4 680 and 4 920 and WBM Grade I in K M 3 0 to 5 0 and WBM Grade II in K M 3 0 4 0 and C O unlined surface Drains in K m 3 0 to 5 0 UNDER SCSP
C/O R/wall at Rd 0/530 to 0/550 , Wire crate R/wall at Rd 0/450 to 0/470 P/L cement concrete path from Km 0/500 to 0/550) (under PDNA Head)
Formation Cutting in km. 0/0 to 0/600
(SH C/O 4.00mtr span RCC slab culvert at RD.0/285 with approaches)
SH ROFD in Km. 0.000 to 1.570).
Removal of formation deficiency at various RDs
(SH-C/O R/wall at RD 0/050 to 0/087
C/O Protection work and RCC BOX Culverts at various RDs) (Under PDNA 2023