Loading…
Loading…
10,892 results • Best match
SH F C 5 7 mtr wide road at Rd.,0.0 to 0.495
Construction of PCC Retaining wall and crate work Breast wall at various RDs
SH C/o 5/7 mtr wide formation cutting in KM 0/180 to 1/185
SH C/o R/wall in R.R. Masonary at Rd. 3/345 to 3/368
SH Improvement of Formation Defficiency between KM 1/225 to 1/495
SH Providing and laying 30 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 1/00 to 3/00 ) under AMP for FY 2023-24
P/L Interlocking paver block ISI marked and Const. of V-shape drain with edge wall at various reaches
SH-P/L WBM G-I,II, III and Tarring PCC V-shape drain in km. 0/00 to 01/300).
Removal of Formation deficiencies, Providing and laying M/T, HPC, Wing wall and PCC drain at various RD,s
C/O formation cutting, RCC slab culvert etc.
SH F/C 5/7 mtr wide road at RD 0/885 to 1/300
C/O RCC HP Culvert ,R/Wall in KM 0/00 TO 2/00
P/L GSB, WMM and 25mm thick Bituminous Concrete in Km 0/00 to 0/360 and 0/448 to 0/600
Formation cutting 2.75/5.00 mtrs wide road in K.M. 0/0 to 1/120
C/O Retaining wall at RD 0/182 to 0/195 and 0/205 to 0/225
SH Formation cutting km 0 0 to 1 200 and wire crate for Dumping site
Removal of formation deficiency km 0/0 o 0/795 and c/o 3 Nos H.P.Culvert at Various RDs alongwith wing wall
SH C O B Wall at RD. 1.405 to 1.427)
/O R/wall at various Rds, P/L 900mm dia RCC Hume Pipe Culvert at Rd 0/295, P/L GSB,WMM, Tarring in Km 0/00 to 0/810 V-Shape drain at 0/00 to 0/800) (under MMGSY)
Construction of PCC Retaining wall at R.D. 0/237 to 0/270
F C. 5 7 mtr wide road at RD0.810to 1.325)
(SH- Construction of 7.10 mtr. Span RCC Box cell (3x3) culvert at RD. 0/520). (Under MMGSY).
SH CO Rwall at RD 5150 to 5 180 4 105 to 4 135 0400 to 0430 PL
(SH- C/O Create wall at RD 0/160 to 0/200 and 0/920 to 1/00)
SH Construction of 900mm dia RCC Culvert and retaining wall
P/L C.C. Pavement in Km. 0/0 to 0/380) under Rural Urban Mission
SH Formation cutting 5/7 mtr wide in Km 0/0 to 0/225
Formation Cutting in Km. 0/0 to 8/450 and C/O R/Wall in Wire Crate for Dumping Site
Formation Cutting in K,m. 0/0 to 0/600
C/O R/Wall at various RDs and CD at RD. 0/720
ROFD , P/L GSB, G-II and 20 mm thick premix in Km 0/0 to 1/500
C/o 900mm dia Hume pipe culvert at RD 0/250 and P/L GSB, G-II and Metalling Tarring at RD 0/00 to 0/338
(SH- Formation Cutting 5/7 meter wide single lane in km. 0/00 to 0/510, C/o R/Walls, B/Walls and wire crate walls for dumping structure at various Rds in km. 0/00 to 0/510).
Providing and Fixing Chequred plate).
SH Providing and laying premix carpet and seal coat in km 0/0 to 0/650 and C/o V-Shape drain in km 0/0 to 0/500
Formation cutting 2.75/5.00 metre wide Jeepable standard km 0/0 to 2/250 and Providing crate work for dumping site
Formation cutting at R.D. 0/405 to 0/830 and Construction of Breast wall at R.D. 0/735 to 0/750
Construction of PCC Retaining wall in wire crate at R.D. 1/105 to 1/135
P/L GSB,WBM and 20mm thick premix carpet with seal coat at RD 0/180 to 0/218 and 0/375 to 0/820 and V-shape drain) Under MMGSY
SH FC 5 7 mtr wide road 1.0 to 1.735
Formation cutting in Km 0/0 to 1/450 and C/o wire crate for dumping sites).
SH- Providing CD works at various RDs in km 1/0 to 2/0
C/o formation cutting 5/7 mts. Wide road in km 0/0 to 2/510
SH Formation cutting 5.7 mtrs. wide in Km. 1.225 to 1.555
Construction of formation cutting 5 metre 7 metre wide km. 0.0 to 2.670 under SCSP
SH CO Cross drainage rigid pavement RWall PL GSB 2cm thick premix carpet and Vshape drain in actual RD 1405 to 2495 in continuity Under NABARD RIDF XXV
SH Providing and Laying Pot hole, Periodical maintenance at RD. 0.0 to 4.0
C/O 2.00mtr span RCC slab culvert at RD 1/680 and C/O Retaining walls at various RDs
SH Construction wire crates at RD 1/105 to 1/238
FORMATION CUTTING IN KM. 0/110 TO 0/155, R/WALL AT RD. 0/078 TO 0/090 AND P/L M/T IN KM. 0/00 TO 0/155) (UNDER M.M.G.S.Y).