Loading…
Loading…
10,897 results • Best match
SH Formation cutting at RD. 0/300 to 0/495
P/L Gr-I, Gr-II in km 0/0 to 1/700 and un lined drain) Under MMGPY).
P/L 30mm thick bituminous concrete in km 0/0 to 1/0 I/c paver block, G-III in pot holes.
Co PCC RWall at RD 0.150 to 0.160 and 0.210 to 0.610 Both sides CO U Shape drain at RD. 0.0 to 0.160 Both side CO PL GSB GII GIII and 30 mm thick bituminous concrete at RD. 0.0 to 0.160 and 0.210 to 0.610
(SH Providing and Laying Mettaling and Tarring in Km 0/0 to 1/700
Providing and Laying 30 mm Bituminous concrete including profile correction in K.M. 0/00 to 1/500
(SH- F/C 5/7 mtr road km 1/270 to 1/765)
SH Providing and laying metalling/tarring causeway and V-Shape drain
P/L CC Drain From RD 1/200 to 1/450
F/C 5/7 mtr. wide road in between km. 1/900 to 4/0 and HPC 900mm dia at various R.Ds.
C/O R/wall from RD 1/563 to 1/585, solid causeway at RD 1/480 to 1/495, 80mm thick interlocking paver block at RD 1/395 to 1/480, 1/495 to 1/585 along with side drains at various reaches.
Providing and Laying WBM G-III, Providing premix carpet seal coat and C/o PCC Drain between Km 0/0 to 1/0
C/O hume pipe culvert with wing wall at RD. 1/170 with wing wall and R/Walls).(Under SCSP).
SH Formation Cutting 5/7 mtr wide Formation Cutting between km 0/645 to 0/850
Providing and Laying M/T in km. 0/000 tio 1/400
C/o, wire crate R/Wall at R.D. 0/585 to 0/600 and 1/035 to 1/050
SH Widening of narrow reaches at Rd. 4.300 to 4.825 and 5.450 to 5.670
SH Formation cutting retaining walls and Hume Pipe Culvert at RD in km 2/0 to 5/0
SH Providing and laying Premix Carpet with seal coat including correction layer Km 1/00 to 2/00
Providing and Laying of WBM G-II in K.M. 0/00 to 0/830
SH Formation cutting at RD. 0/495 to 0/645
SH F/C F/7 mtr wide between RD 0/600 to 0/870
SH F/C 5/7 mtr wide at RD 0/300 to 0/525
SH P/L paver block at RD. 0/465 to 0/675 and 0/890 to 0/930 C/O R/Wall at RD 0/570 to 0/630 LHS and B/Wall at RD, 0/570 to 0/625 RHS C/O V-Shape Drain at RD. 0/465 to 0/840and 0/870 to 0/890 and C/O Cross drain at RD 0/890 C/O Cement c
SH C/O 900mm dia Hume Pipe Culvert at RD 0/275 with wing walls and 2.00 metre Span RCC Slab culvert at RD 1/068 with wing walls and metalling tarring V-Shape drain at various RDs
Providing and Laying 30mm thick Bituminous Concrete alongwith providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 0/600) Under AMP 2026-27 Village Road
Construction of R/wall at RD 1/185 to 1/208 and 1/425 to 1/465) Under DMFT Deposit.
SH F/C 5/7 mtr wide road at RD 1/495 to 1/840
Providing and laying 25mm thick Mix seal surfacing, PCC drain and road marking in K.M. 0/0 to 0/750
Const. of V-shape drain and cement concrete pavement in kms. 8/600 to 8/950
Formation Cutting in 5/7 mtr. wide road in K.M. 1/000 to 1/140
5/7 mtr. Wide formation cutting in Km. 2/300 to 3/720)Under BASP
ROFD 5/7 mtrs. Wide in between km. 0/050 to 0/500, C/O edge wall at various Rds. ,P/L 900mm dia RCC hume pipe culvert at Rd. 0/160, P/L M/T in km. 0/150 to 0/350 and C.C. pavement at various rds. In between km. 0/0 to 0/150 and 0/350 to 0/500) Under
Formation cutting in Km 0/0 to 0/600 and C/o Wire crate for dumping sites at Rd 0/00 to 0/015 and 0/530 to 0/545).
P/L Soling and M/T in km. 0/270 to 0/770 Under OTMNP Head
Providing and laying GSB, Cement concrete pavement at RD. 1/500 to 1/750 ) ( DEPOSITE WORK
Formation Cutting, C.D. work, providing and laying metalling/tarring
SH widening of narrow reaches at Rd. 0.195 to 0.420
00 (SH C/o B/Wall at Rd. 0/930 to 1/00)
Metalling of road and Hume pipe culvert alongwith wing wall at Rd. 0/00 to 0/500
Providing and Laying WBM G-II for profile correction and 2cm thick premix carpet with seal coat in Km 0/0 to 1/0
(SH- P/L 25 MM thick B.C laying with Paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 1/00 to 2/00)
P/L Metaling and Tarring in Km. 0/0 to 1/0 C/O R/Wall and side Drain) (Under SCSP)
SH Improvement of curves at RD 0/090 to 0/180 Improvement of gradient at RD 0/465 to 0/570 Construction retaining walls and CD works etc
Construction of 900mm dia hume pipe culvert at R.D. 0/030 with PCC Wing wall, created Breast wall at R.D. 1/180 to 1/190 and PCC Retaining wall at various RDs
SH C/O B/Wall at RD 0/390 to 0/428
SH Construction of Edge wall at RD 1/680 to 1/780 and providing and laying GSB WMM and SDBC in km 0/0 to 1/0
P/L cement concrete pavement at RD 0/300 to 0/400, 0/405 to 0/600 Length 295 mtr.
P/L Cement concrete work in Km 0/0 to 0/200.
SH Providing and laying 80mm thick paver blocks at RD 0/455 to 0/615