Loading…
Loading…
10,897 results • Best match
(Sub Head - Providing and laying Kharanja soling and cement concrete pavement at Km. 0/120 to 0/170 under NDF Deposit SID-NDF/2019/859)
(SH- C/0 R/Wall at RD 0/0 to 0/030, 0/030 to 0/055,0/080 to 0/100 B/Wall 0/0 to 0/060, 0/150 to 0/170 P/L Kharanja Stone soling km 0/0 to 0/700)
Providing and Laying G-II for profile correction premix coat tack coat and 2cm thick carpet with seal coat in Km 0/0 to 0/300 and 0/800 to 1/0).
SH C/o R/wall from Rd 0/020 to 0/040 and 0/120 to 0/129
P/L G-I at km 3/615 to 3/815 and 3/913 to 4/125 and C.C. Pavement at km 4/075 to 4/125
P/L 30mm thick bituminous concrete in kms 0/0 to 0/500 I/c paver block, G-III in pot holes
P/L GSB drain in km 0/0 to 1/780 C/O R/Wall in km 1/960 to 1/985
Providing and Laying Premix carpet with primer coat and tack coat in Km.0/00 to 0/405
F.C. in km. 0/0 to 0/500 and C/O 6.00 mtrs. span RCC slab type culvert at Rd. 0/035) Under OTMNP Head
C/O R/Wall in . 2/350 to 2/360
SH ROFD Retaining walls and CD work in km 0/0 to 0/380
P/L soling G-I and wearing G-II in kms 0/0 to 0/080 and metalling tarring in kms 0/0 to 1/0
SH FC 57 mtr wide road at Rd.0.510 to 0.645
Formation cutting in km. 1/617 to 1/645 and 1/747 to 1/798 DMFT Deposit
C/O 5/7mtr. wide formation cutting at RD. 0/105 to 0/300
5/7 mtr. wide formation cutting in Km. 1/300 to 2/630) Under SCSP
Formation cutting 2.75/5.00 metre wide from K.M. 0/0 to 2/250 and construction of wire crate for dumping site
Metalling and Tarring, R/Wall in Wire Crate and C/O Road side drain in Km. 0/0 to 1/220
Construction of 3.00 mtr. Span RCC Slab Culvert at RD 2/300
C/o 900mm dia RCC hume pipe culvert at Rd.0/210 formation cutting at Rd 0/715 to 0/850)
SH C/O R/Wall at RD 0/792 to 0/800, B/Wall at RD 0/815 to 0/840 and unlined drain between km 0/00 to 1/200
Construction of 900mm dia hume pipe culvert along with both side wing walls at R.D. 2/202
PROVIDING AND LAYING G.S.B., W.M.M. AND TARRING IN KM. 1/0 TO 1/500) (UNDER O.T.M.N.P. HEAD).
Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/210
SH Formation cutting and earth filling at RD 3515 to 3875 Construction of 900 mm dia RCC hume pipe culvert at RD 3665 and 3800 Construction of Retaining wall at RD 3658 to 3663 3667 to 3675 RD 3830 to 3875 and Construction of Breast wall at RD
SH Improvement Passing Places Rwall CD work GSB WBM G-2 WBM G-3 Tarring work road side drain parapets and cement concrete pavement in Km 0.000 to 1.870
SH Repair of pot holes between Km. 0/0 to 3/690 at Various RD Under MMSRRY
Construction of Retaining wall at various RDs
SH- Formation cutting 2.75 to 5.00 mtr. wide Km 0-735 to 3-240 and construction of wire crate for dumping site
SH Construction of B/wall in Wire Crate at Rd 0/100 to 0/150 and R/Wall at Rd 0/200 to 0/225
Construction of Retaining wall in stone masonry at RD 0/450 to 0/457.50. D.C. Deposit Scheme ID-2024/65.
Removal of formation deficiency at RD 0/0 to 0/255) under Deposit VKV/2024/1738 (3)
SH F/C 5/7 mtr wide between RD 0/825 to 1/210
Construction of Retaining wall at RD 0/340 to 0/348. DC Deposit Scheme ID-SDP/2024/274.
SH Construction of R/ wall at Rd 4/510 to 4/527.50
SH Formation Cutting 5/7 mtr at RD 0/00 to 0/135
(SH- C/O R/wall with C.C. Pushta 1 5 10 with boulder apron at RD 18/000 to 18/020)
SH Formation Cutting 5/7 mtr at RD 0/135 to 0/360
(SH- C/O Hume pipe culvert 900mm dia at RD 2/415, 2/985 with both side approach and earth cutting work at RD 2/500to 2/900)
Providing R/wall at Rd 0/140 to 0/151 and Drain between at Rd 0/970 to 1/0 (UNDER PDNA-2023)
P/L GSB, WMM , MT works in Km 1/500 to 2/500
C/o R/wall at RD 5/00 to 5/010 and HPC at RD 5/060) Under MMGSY
C/O R/Wall at RD. 1/980 to 2/020
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 1/555
Providing and laying patch work in Km. 0/00 to 1/500) Deposit work
ROFD 5/7 mtr wide road at km. 0/315 to 0/570, P/L 900mm dia RCC Hume Pipe Culvert with Wing Wall at KM 0/960, R/Wall at RD 0/320 to 0/340, 0/940 to 0/960 and B/Wall at RD 0/560 to 0/600, P/L Cement Concrete Pavement at Km. 0/550 to 0/900).(Under MM
Removal of deficiency, P/L Metalling and tarring work, Retaining wall, Breast wall, crate work, HP culvert and 2.00 metre span RCC slab culvert
P/L 600mm dia RCC Hume pipe culvert at Rd 1/075 and U-shape drain at various Rds
C/o PCC R/Wall, P/L Cement Concrete pavement and U-shape drain
P/L 900mm dia RCC Hume pipe culvert with wing wall at Rd 1/920, 2/030,2/120, 2/450 2/990, P/L GSB and WMM in Km 2/400 to 3/00( (under MMGSY)