C/O 2.00 mtr span culvert at rd 0/425 C/O E/wall Cement conceret Pavement in km 0/425 to 0/530
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 1/0 to 3/0 including profile correction, drain and Grating). Under Annual Maintenance Plan for the year 2025-26.
SH Manufacturing and Erection of overhead signage system at Rd 7 765
C/O 900mm dia duble hume pipe culvert at RD. 1/285 and 1/280).(Deposit work).
C/o Causeway in (Riyalkar Khad) from KM 1/100 to 1/140
SH- M/T work portion at RD 0/500 to 1/00
SH C O R Wall at RD. 5.820 to 5.840
SH C O R Wall at Rd. 17.824 to 17.834
Formation cutting 2.75/5.00 metre wide road K.M. 0/0 to 2/300 and construction of wire crate for dumping site
5/7 meter wide Formation Cutting in km 2/0 to 4/480
SH Fromation Cutting 5/7 mtr wide road between Km 0/780 to 1/480
C/o R/wall in km. 0/610 to 0/620, B/wall in km. 1/870 to 1/900 and Providing and laying WBM G.II in km. 0/0 to 0/160
Providing and Laying 30 mm thick Bituminous concrete between in K.M. 0/00 to 0/500
SH CO RWalls Parapets Crash barrier on valley side and Vshape drain at various RDs Under Nabard RIDFXIII
M/T works at RD. 2/050 to 3/100
C/o, Wire crate B/Wall at various RDs
P/L 30 mm thick Bituminous Concrete in Km. 0/0 to 0/600
C/O R/Wall in km. 0/750 to 0/799 and Parapets.
(SH P/L GSB, WMM, Metalling and Tarring in km. 0/0 to 0/600)(Under OTMNP).
SH C/O B/Wall at RD 0/215 to 0/255 and B/Wall in wire crate at RD 0/970 to 0/985
C/o V-sghape Drain at RD 0/520 to 0/640, Hume Pipe Culvert at RD 0/585, 0/720 and R/wall at RD 0/695 to 0/720 and Providing and laying Soling and CC Pavement work in Km 0/520 to 0/720).
C/O V-Shape Drain at various Rds C/O U-Shape Drain at various Rds C/O Parapets at various Rds, Providing and Erecting W Metal Beam Crash Barrier at various
Construction of 2.00 meter span RCC slab culvert at RD 0/580.
SH Formation cutting at RD. 2/890 to 2/930
C/O Formation cutting, Retaining wall, Cross Drain and road side drain at RD 0/0 to 2/277
C/O Formation Cutting, Protection Work, Cross Drainage Work, V-Shape Drain, Metalling And Tarring, Crash Barrier Road Furniture and Dumping Structure in KM 0/000 to 13/691. (Road Portion) 600 mtr Road Portion
C/o 6.00 mtrs. Span R.C.C. Slab type culvert at RD. 0/155) Under Nabard)
C/o formation cutting at RD 0/00 to 0/500, P/L GSB in Km.0/00 to 0/500
C/O PCC R/Wall at Rd 0/165 to 0/180 0/316.30 to 0/331.30 and B/Wall at Rd0/400 to 0/410
SH- C/o slab culvert at various RDs
Repair of pot Holes in between Km 0/00 to 2/600 and 0/00 to 1/200 respectively
(SH-F/C 5/7mtr at RD 2/875 to 3/210)
C/o wing wall Slab Culvert at Rd 0/090 Under SDRF
C/o PCC, R/Wall at R.D. 3/010 to 3/020, 4/570 to 4/580 and 2/850 to 2/860
Providing and Laying and Rolling of Close-graded Mix seal surfacing 25mm thickness HP0404VR017 Km 0.0 to 1.0, 1.0 to 2.0 and 3.0 to 3.500
(Sub Head - Providing and laying Cement Concrete Pavement at km 0/090 to 0/150 and 1/450 to 1/550) under PDNA 2023.
C/O Breast wall at RD 0/333 to 0/406
Providing and Laying 2Cm thick Premix carpet and seal coat Km 0/700 to 2/00) (MNP)
SH C/O 900mm hume pipe culvert at RD 0/750 600mm dia at RD 0/545 Retaining wall at RD 0/780 to 0/810 construction of V-shape drain at RD 0/490 to 0/520 and 0/525 to 0/860 interlocking paver block 80mm thick at RD 0/543 to 0/550, 0/
SH Formation cutting 5/7 mtr wide in km 1/0 to 1/420
SH P L GSB WMM 2 5 cm thick premix carpet with seal coat in km 0 200 to 0 500
SH C O B Wall at Rd. 4. 870 to 4.930
C/O Breast wall and Retaining wall at various Rds and Hume pipe culverts 900mm dia with 3mtr. Both side wing wall at Rd.0/060,0/480,0/600 and 1/015
Providing and laying G - III, SS - I, and 25 mm Thick Bituminous concrete, in km 0/00 to 2/00) Village road ADDL. Km.(Under AMP 2023 - 2024)
Formation Cutting in Between km. 0/00 to 0/405 and Providing and Laying WBM G-I in km. 0/00 to 0/930 and Construction of Retaining Wall at Rd. 0/520 to 0/527.50) Under MMGSY
SH P/L Kharunja Stone Soling at Rd 5/665 to 5/965 , C/O B/wall at RD 7/065 to 7/125
C/O 5/7 mtr. Wide formation cutting km. 0/315 to 1/00)
ROFD in km 0/510 to 0/975, P/L 900mm dia RCC Hume Pipe Culvert at Rd 0/830, 0/935, 1/125 P/L Cement concrete Pavement at RD 0/090 to 0/120, 0/270 to 0/300 P/L GSB, WMM, V/U - shape Drain at RD 0/00 to 0/300). (Under MMGSY)
Formation Cutting 0/000 to 0/555 C/O Hume Pipe Culvert at Rd 0/490 and P/L Kharanja Stone Soling in Km 0/000 to 0/555
(SH- F/C 5/7 mtr wide road at RD 0/0 to 0/720)