Loading…
Loading…
10,897 results • Best match
SH Construction of hume pipe culvert alongwith wing wall Rd at RD 2-190 2-390 2-930 3-120 and 3-405
Formation Cutting 5/7 mtrs wide road in Km 0/000 to 0/510 and C/O PCC R/Wall at Rd 0/000 to 0/012 and 0/240 to 0/253
Extension and paving of berms (Cement Concrete pavement)in Different reaches).
Providing and laying cement concrete pavement in Km. 0/0 to 0/100 under MMGSY
SH Providing and Laying stone aggregate 90 to 45 mm (WBM-I) at Km 2/245 to 3/500)
C/O PCC R/Wall at Rd 0/512 to 0/524
SH C/o R/wall from Rd 0/160 to 0/185 and 0/200 to 0/203
SH Providing and Laying Compacting Graded Stone aggregate wet Mix in k M 0 0 to 0 500
C/O PCC R/Wall at Rd 0/340 to0/350
SH Fromation Cutting 5/7 mtr wide road between RD 0/525 to 0/825
P/L GSB in Km 0/500 to 2/0, P/L G-II, G-III in Km 0/0 to 2/0
P/L Interlocking Concrete Block in Km 0/0 to 0/250
SH F C 5 7 mtrs. Wide road at Rd 1.980 to 2.640 and B.Wall at Rd 1.730 to 1.739 , 1.800 to 1.815 and R.Wall at RD 1.790 to 1.813 , 1.860 to 1.883
Formation cutting CD work interlock paver block providing and laying MT parapets and drain in km 0-765 to 1-330
SH-C/O R/wall in PCC 1 4 8 at RD 0/975 to 1/0 1/110 to 1/125
ROFD between km 0/285 to 0/930). Under PDNA 2023
SH Formation Cutting 5 7 mtr wide road at Rd 2/.25 to 2.705
P/L 80mm thick interlocking paver block at RD 0/550 TO 0/750and solid causeway at RD 0/595 to 0/610
P/L 25mm thick bituminous concrete in kms 0/0 to 1/0 and G-III with 20mm thick premix carpet in patches and C/O drain at RD 0/500 to 0/600.
Providing and laying G.S.B and wearing coat and tarring work in Km 1/100 to 1/500
(SH- winding of narrow reaches P/L GSB G-ll, G-lll Bituminous Macadam Bituminous Concrete at RD 0/0 to 1/0)
P/L Cement concrete pavement in km 1/600 to 2/400
C/O 900 mm Dia H/pipe culvert at RD 0/830 and Wing wall at RD 0/823 to 0/828 Both side
Removal of formation deficiency at various RD). ( Deposit work VKVMY MLALAD).
SH R/ Wall at RD 0.50 to 0.70
Construction of R/wall at Rd 0/110 to 0/121,C/O B/wall at Rd 0/00 to 0/050,C/O U-Shape drain in km 0/00 to 0/200at Various Rds and Providing and Laying of Interlocking Paver Block
C/o PCC and Wire crate R/Wall at R.D. 0/390 to 0/410
S.H CO RCC Slab Culvert and return wall at R.D. 0.500
C/O 4.00 Mtr span slab type culvert at RD 0/340 SCDP
Const. of retaining wall and breast wall at various reaches
(SH- F/C 5/7 mtr wide road at RD 0/515 to 0/645)
C/O R/wall at Rd 0/890 to 0/920 and Down Drain Bed at RD 0/050 to 0/110 and 0/480 to 0/510
SH F/C 5/7 mtr wide road at RD 0/855 to 1/435
Reconstruction of B/Wall and repair of pot holes at various RDs.
(SH-P/L Kharanja Stone Soling at RD 0/0 to 0/700)
P/L 30mm thick bituminous concrete in kms 0/0 to 0/950 I/c paver block, G-III in pot holes.
SH C/O R/Wall at RD 0/675 to 0/685
SH Balance work of Formation cutting 5 7mtr.wide road R and B Walls Dumping site C.D. works Essential soling Parapets road side drain and Logo sign boards in Km 0.000 to 6.685 HP09332
SH- C/O R/Wall at RD at 0/350 to 0/360 and 0/380 to 3/392
Providing laying GSB , WBM,20mm thick PC with seal coat work Km0/700 to 1/050 (Under OTMNP
SH P/L Cross Drainage work at RD 0/075
Providing and Laying of WBM, G-III and 20 mm M.S.S in K.M. 0/00 to 0/700
Providing and Laing G-II, G-III, between in K.M. 0/00 to 0/600
C/O Breast wall at RD 0/0 to 0/300 to 0/333 and removal of slips at various RDs between Km 0/0 to 0/400
Formation Cutting 5/7 mtrs wide Road from Km 0/225 to 0/315, P/L Soling in Km 0/00 to 0/315 and C/o R/Wall at RD 0/165 to 0/180 and 0/300 to 0/315
SH C/o F/C in 5/7 mtr. wide road at R.D. 0/300 to 0/600
C/o Hume pipe culvert with wing wall at RD 1/615 and R/wall ) Under SCSP
R.O.F.D. between km 0/0 to 2/0 to CD work in RDs 1/010, 1/140, 1/260 1/450, Side drain between km 0/0 to 1/700 and G-I in km 0/0 to 2/00) (Under SCSP)
P/L GSB,WMM and 20cm thick premix carpet with seal coat at RD. 0/00 to 0/250 ).(Under OTMNP).
Providing and Laying WBM G-II and Tarring work at Km 0/600 to 1/215) (MNP)