Loading…
Loading…
10,897 results • Best match
Formation cutting at Km 0/240 to 0/900) (SCSP)
P/L Cement concrete pavement in km 0/800 to 1/600
C/O R/wall at RD 0/270 to 0/280, 0/285 to 0/295,B/wall 0/405 to 0/435, 0/465 to 0/485, 0/845 to 0/880, 0/890 to 0/910, 0/795 to 0/810, 0/825 to 0/840, U-shape drain with edge wall at 0/348 to 0/405, 0/980 to1/015,earth filling at RD 0/345 to 0/435
C/O soild casueway at RD 1/400 ro 1/410 Length 10mtr, M/T in kms 0/450 to 0/510, 0/538 to 0/978 and CC pavement in kms 0/523 to 0/578 and RD 1/130 to 1/390
Construction of Flush/solid causeway at RD 0/0 to 0/035 OTMNP
C/O Hume pipe culvert at RD 0/450, P/L CC Pavement at various RDs and P/L M/T in km 0/150 to 0/600 and 0/750 1/00
(SH-F/C 5/7mtr at RD 1/420 to 1/900)
Formation Cutting in Km. 2/690 to 4/0
SH FC and PL soling in km 00 to 0300 Under OTMNP
SH C/O B/Wall at RD 0/800 to 0/820
Repair of Slab culvert at RD 3/00 PDNA 2023
Construction of 900mm dia hume pipe culvert, PCC Retaining wall and Breast wall in wire crate
C/o, R/Wall at R.D. 1/207 to 1/224 and 1/280 to 1/287 and C/o, Balance work of R/Wall at R.D. 1/145 to 1/175
P/L Kharanja Stone Soling in Km.0/000 to 1/345
Maintenance of WBM, P/L Tarring in K.M. 1/00 to 1/930
C/o, R/Wall at R.D. 4/900 to 4/910 and 7/695 to 7/710
FC 5.7 mtr wide road at Rd. 0.510 to 0.645
SH Formation cutting 5/7 mtr wide road at RD 0/915 to 1/075
Formation cutting and Cross drainage work in Km 0/0 to 0/500
Construction of C.D ,V-Shape drain and Providing and laying M/T of between Rd 0/400 to 0/800).Under MMGSY
Providing and laying GSBWMM Tarring at Km 0/780 to 1/093 and 1/118 to 1/500
Improvement of 5/7 mtr. wide formation cutting in Between at R.D. 0/885 to 0/930
SH C/O R/WALL AT RD 0/090 TO0/210) (UNDER DEMAND NO. 10 MAJOR HEAD- 3054 ROAD AND BRIDGES
5/7 mtr wide formation cutting in km 0/0 to 0/435 and R/Wall at RD. 0/00 to 0/030)
Formation Cutting at Rd 0/630 to 0/895 P/L Kharanja Stone Soling at Rd 0/0 to 0/500 and C/O Wire Crate R/Wall at Rd 0/000 to 0/024
SH- Formation cutting and providing wire crate for dumping sites at Rd 0-300 to 0-320 and 0-090 to 1-110
P/L Cement concrete pavement from RD 0/0 to 0/200) OTNP
P/L G-III, Prime coat, Tack coat, Premix carpet, Seal coat in Km. 1/200 mtr to 1/700 mtr
Improvement of 5/7 mtr. wide formation cutting between at R.D. 0/930 to 0/960
P/L 25mm thick bituminous concrete in kms 3/0 to 4/0 and G-III with 20mm thick premix carpet in patches and C/O drain at RD 3/100 to 3/200 and interlocking paver block at RD 3/520 to 3/570.
Providing and laying cement concrete pavement from Km. 2/750 to 2/850, Km. 2/900 to 3/0 and Km. 3/450 to 3/500
Construction of R.wall in PCC 1-5-10 at RD 0.0 to 0.019 and 0.075 to 0.090 and ROFD at RD 0.0 to 0.240 ) SDRF(SDF.2024.643)
SH C/O 900mm Dia Hume pipe culvert in Km. 0/600 (Under Head OTMNP)
SH F/C 5/7 mtr wide road at RD 0/210 to 0/300
C/O B/wall at RD 0/130 to 0/160).
SH- Providing and applying loosening GSB and G-III
const of cc pavement from RD 1/135 to 1/335
SH C/o 3.00 mtr span RCC slab culvert at RD 1/525.
C/O CC pavement, R/wall andHume pipe culvert at various RD
C/O approaches 3.00 mtr. Span at RD 9/230)
Improvement of 5/7 mtr. wide formation cutting Between at R.D. 0/765 to 0/870
C/O PCC. Breast Wall between km RD. 0/0 to 0/100
C/O HP culvert at RD 0/330 and 0/620 C/O R/wall at RD. 0/200 to 0/215 0/495 to 0/510 C/O wing wall at various RD C/O B/wall at RD 0/370 to 0/390 and C/O C.C. Cause way at RD. 0/465 to 0/515
SH F/C 5/7 mtr wide road km 0/00 to 0/645
C/o R/wall at RD 0/030 to 0/056 and P/L cement concrete pavement at RD 0/00 to 0/160
C/O Formation cutting at saRD 2/0 to 2/600 and 900mm dia HP culvert 0/260, 0/870, 1/020 and GSB at RD 1/0 to 2/0, G-II at RD 1/0 to 1/750, 2/0 to 2/250, P/L CCP at RD 1/750 to 2/0) OTMNP
SH C O side drain between KM 1 0 to 1 500
(SH-Construction of Retaining wall at km 0/273 to 0/300, Breast wall at km 0/270 to 0/285 and providing and laying Kharanja Stone Soling and Cement Concrete pavement at km 0/060 to 0/340 under PDNA 2023)
SH CO 900 mm dia Hume pipe culvert at RD 0.985 with 7.40 mtr left side ,8.60 mtr right side wing wall, RWall at RD 0/845 to 0/851 and P/L Sub base course GSB and G-II
(SH-F/C 5/7mtr wide road at RD 1/0 to 1/420)