Loading…
Loading…
10,897 results • Best match
SH F/C 5/7 mtr wide road at RD 0/075 to 0/540
SH Providing and laying metalling tarring km 0/0 to 0/640
SH- Construction of Formation cutting, Sub-Base, Metal Tarring, cross drainage work, Retaining wall, Breast wall, Parapets, Km stones, dumping site 0/0 to 2/055 including five year maintenance) Under NABARD RIDF -XXX
SH C O R Wall at Rd. 17.255 to 17.274
P/L correction layer spreading and compacting stone aggregate G-III in km. 0/0 to 2/0 and P/L tarring in km. 1/0 to 2/0
Formation cuttting in km 0/130 to 0/260 C.C. pavement at Rd 0/130 to 0/220 Under MMGY
(SH- P/L G-ll, G-lll tarring work V-shape drain, Parapets in km 0/0 to 0/570 and R/wall at RD 0/500 to 0/525, C/O 900 mm HPC dia at RD 0/140, 0/120 0/280)
Reconstruction of B/Wall and R/Wall at various RDs.
P/L Built up spray grout layer for pot holes for pot holes 30 mm thick bituminous concrete in km 0/0 to 1/0
SH Providing and laying Metalling Tarring km 0/0 to 1/0
(SH- P/L 25 MM thick B. C laying with Paver Finisher and Road Marking strips of hot applied Thermoplastic compound (Painting line) between Km 0/00 to 1/00)
Providing and laying 25mm thick Mix seal surfacing, plastic mix seal surfacing and road marking in K.M. 0/0 to 3/340
Formation cutting at RD 0/0 to 0/495 BASP
SH C/O B/wall at Rd 7/515 to 7/565,7/615 to 7/665 and 7/695 to 7/735
(SH- P/L 25 MM thick B.C laying with Paver Finisher and Road Marking strips of hot applied Thermoplastic compound (Painting line) Between Km 2/00 to 2/500)
C/o Hume pipe culvert with wing wall at RD 1/400 with wing wall and R/walls) Under SCSP
(SH-Providing And Laying 50mm thick penetration macadam in essential reaches and 30mm thick bituminous concrete in km 1/700 to 2/600).under Addl.Annual Maintenance plan (AMP)for the year (2021-22).
SH ROFD C O 900 mm dia RCC Hume pipe culverts at Rd 2 800 3 010 3 300 3 600 WBM Grade I In K M 2 700 to 3 700 WBM Grade II in K M 2 700 to 3 700 and c O unlined surface Drains 2 700 to 3 700 Under SCSP
SH C/o B/Wall at Rd.0/0 to 0/017.50, 0/020 to 0/037.50 and 0/050 to 0/157)
Cutting in earth work in between km. 0/0 to 0/500
P/L Soling, WMM, Cement Concrete Pavement C/O Edge wall in Km 0/870 to 1/180) (under MMGSY)
(SH-F/C 5/7 mtr wide road cutting at RD 1/375 to 1/495)
SH C/o B/wall at RD. 0/210 to 0/240 0/840 to 0/870 and 2/320 to 2/355
SH Improvement of formation deficency in Km 0/0 to 0/600 under SCSP
SH- C-O Edge wall at RD 0-050 to 0-095 G-I G-II and M-T at RD 0-0 to 0-600 under OTMNP
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets and road furniture including five year maintenance) under NABARD RIDF XXVII
P/L CC Pavement, G-II, G-III and 20mm pre mix carpet including seal coat
P/L C.C.Pavement at RD 0/260 to 0/400 and 1/350 to 1/510
SH- formation cutting 5/7 mtr. wide m/able standard road Km 0/0 to 2/00 and construction of crate for dumping site
Providing and laying 25mm thick MSS Type A in Km.0/000 to 0/660
SH Construction of retaining wall breast wall Providing and laying GSB in Km0/110 to 0/230
Construction of C.D. V Shape drain and Providing and laying M T of between Rd. 0/00 to 0/400
SH C/o B/Wall at Rd. 0/260 to 0/280, 0/500 to 0/520, 0/530 to 0/580 and R/ wall at Rd to 0/470 to0/485)
SH- Providing and laying soling, GSB, WBM-G-II, G-III and Tarring and Construction of V-shape drain in km. 0/00 to 1/700 ) under SCSP
(SH- C/O R/wall at RD 2/700 to 2/720)
SH F/C 5/7 mtr wide road at RD 0/00 to 0/555 Deposit under head VKV/2025/1
C/O R/wall at RD 0/050 to 0/070,0/240 to 0/272,edge wall at RD0/0 to 0/032 Both side parapets at RD 0/0 to0/170, interlocking paver block at RD 0/0 to 0/032,0/050 to 0/070,0/075 to0/110,0/135 to 0/150 and causeway at RD 0/070 to 0/075.
(Sub Head - Providing and laying Cement Concrete Pavement at km 0/760 to 0/920) under PDNA 2023.
C/O Formation Cutting in Km. 2/690 to 4/0
(SH- P/L GSB,G-lll,B/wall r/wall in wire crate, earthen shoulder and katcha drain)
F/C in 5/7 mtr. wide road in K.M. 1/200 to 1/290
Providing and laying soling grade-I in Km. 0/0 to 0/800, wearing and premix carpet with seal coat in Km. 0/0 to 1/0
Providing and laying interlocking paver block pavement at RD 0/400 to 0/556 ) Under MMGSY Head
SH CO V shape drain at Rd 0 050 to 0 250 and 0 450 to 0 550
SH Construction of 5/7 metre wide road Formation Cutting Retaining wall Providing and laying 900mm dia Hume Pipe Culvert at various RDs
SH Formation cutting at RD 2/900 to 3/900
P/L GSB, G-II, G-III, Primer Coat, Tack Coat, Premix Carpet and Seal Coat at RD 1/00 to 1/200, C/o R/Wall at RD 1/100 to 1/120 and Parapets at RD 1/00 to 1/200
P/L GSB and G-II in kms 0/0 to 0/280 and cement concrete pavement in kms. 0/0 to 0/280.
Formation cutting at RD 1.00 to 1.150
Preparation of forest case constructed in violation of FCA-1980 Complete including