Loading…
Loading…
10,895 results • Best match
C/O Link road to village Gajwa km. 0/00 to 2/550 (SH Improvement of formation deficiencies from km. 1/310 to 1/405 and C/O RCC Hume Pipe Culvert at RD. 1/740,1/780 , 2/010 and 2/100 and C/O R/Wall from km. 0/380 to 0/397) Under MNP
AR and MO Link road Jadla Pratham to Nari Duki up to HP Boundary Km 000 to 8000 SH Repair of Pot Holes at RD 1367 to 2000 2000 to 2363 2412 to 2608 2694 to 3000 3000 to 4000 4000 to 5000 5000 to 6000 6000 to 7000 and 7000 to 7861 Under MMSRRY 2025
C/o link road kularu,Puhai,jeor Ballu in GP Panol SH Providing and laying cement concrete pavement at RD 0/00 to 0/176.50,R/wall at RD 0/450 to 0/465,B/wall at RD 0/310 to 0/360 and hume pipe culvet at RD 0/250 and at RD 0/450 SDP Deposit
Job 6 Construction of Link road Harizan Basti Jalgran to Mohalla Harizan Mohalla Sareda km 0-0 to 1-240 Sub Head P.L C.C. Pavement km. 0-100 to 0-225 and 0-945 to 1-230 and W-Matel Crash Barrier at RD 0-550 to 0-620 and 0-640 to 0-730 Under SCCP
Balance work for construction of link road from Sarkalti Hawan Oddi SH P/L Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at Rd 0/735 1/375,1/73, 1/810 1/885 1/960 2/2102/555 2/960 3/105 3/480 3/660 3/780 ans 3/870
Construction of link road from Gangtoli to Kunth Km 0/0 to 5/0 (SH-Formation Cutting 5/7 Mtrs. wide road , Cross- Drainage in Km 0/0 to 5/0 and essential Soling in Km. 0/0 to 3/500 ).(SW- Formation Cutting 5/7 Mtrs. wide road in Km 3/135 to 4/270)
C/o Link road from village Ratwa to kuna via Tholla Kulyari jarna Balaina km 0/00 to 6/500 (SH ROFD in essential reaches, C/O 900mm dia RCC hume pipe culvert at RD. 2/725 and 3/550 and C/O 1.50 mtr span Slab culvert at RD. 2/810 and C/O 4.00
Construction of link road from (NH-205) Gara to Mauru km 0/00 to 2/00 ( SH-C/O ROFD in km 0/00 to 1/075 and C/O R/wall at RDs 0/102 to 0/132 and C/o 900 mm dia Hume pipe culverts at RDs 0/480, 0/585, 0/650 and 1/075)
C/o link road from main road Balghar to village Kalehar Km. 0/0 to 0/750 (SH Formation cutting C/o R/wall at RD 0/220 to 0/265 900mm dia hume pipe culvert at RD 0/270 and P/L CC interlocking paver blocks at RD 0/0 to 0/310) under MMGSY
Periodical Renewal for the year 2024-25 on Link road Gagret Loharli Chururu (MDR-98), (SH. Providing and laying 25mm thick Bituminous Concrete with thermoplastic paints in Km. 5/0 to 6/0, 6/0 to 7/0, 7/0 to 8/0, 8/0 to 9/0 and 9/0 to 10/0) MDR-98
C/o link road from Lag to Harizan Basti, Rajput Basti, Ward No. 3 GP Baliana (SH Removal of Formation Deficiency, in Km 0/0 to 0/500, c/o Retaining wall at Rd. 0/250 to 0/285 solid causeway at Rd. 0/080. and 0/185 and CC pavement at Rd. 0/0 to 0/
Balance work for construction of link road from Sarkalti Hawan Oddi Km 0/000 to 3/975 SH Providing and laying Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at RD 0/735 1/375 1/735 1/810 1/885 1/960 2/210 2/555 2/960 3/105 3/48
Construction of link road from Chammb Bhujan road to Palangri village Kangoo Ka Johar Km. 0/0 to 1/425 (SH- Formation cutting in Km. 0/945 to 1/325, C/o R/wall at RD 10/030 to 10/045 and C/o 900mm dia hume pipe culvert at RD 0/900 and 1/098)
C/O M/T on Link road from Renuka Ji to Jataun Km. 0/00 to 3/900 (SH - P/L WBM G-1 G-ll, and M/T from Km. 2/00 to 3/00 alongwith road side drain from Km. 0/00 to 1/00 and 2/00 to 3/00 and Essential Parapets ) under MNP
Balance work for construction of link road from Sarkalti Hawan Oddi SH P/L Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at Rd 0/735 1/375,1/73, 1/810 1/885 1/960 2/2102/555 2/960 3/105 3/480 3/660 3/780 ans 3/870
C/o link road from Nalda Nallah to village Nalda Km.2/960 to 5/285 SH-Crated R/wall at RD.4/405 to 4/510 B/wall at RD. 4/405 to 4/495 Dry edge wall at RD. 4/645 to 4/745 and RCC slab culvert at various RDs 0/800 to 4/450.
Periodical Renewal for the year 2024-25 on Link road MawaKaholanJhikli to Gagret, (SH. Providing and laying 25mm thick Bituminous Concrete with thermoplastic paints in Km. 5/300 to 6/0, 6/0 to 7/0, 7/0 to 8/0, 8/0 to 9/0, 9/0 to 10/0 and 10/0 to11/0
C/O link road Tipari to Dhinguli via Chiya Khaltu Harabag Shantibag in GP Zar SH C/O Wire Crate R/Walla B/Walls at various Rds C/O PCC B/Wall at Rd.1/915 to 1/960 and P/L Kharanja Stone Soling in Km 0/0 to 0/500 and 0/870 to 1/500
R/R of rain damages on link road to Village Kot road in km 0/0 to 3/500 (SH C/O 900 mm dia NP-2 HPC at RD 0/710, R/wall at RD 0/715 to 0/745 and P/L Gr-I G-II at Rd / 0/680 to 0/750 2nd call
Restoration of rain damages on Kothi to Baddu road km 0/00 to 2/260 SH C/o Link road kothi to Kurnari construction of R/wall at RD 1/210to 1/225,B/Wall at RD 0/360 to 0/375and Providing and laying cment concrete pavement at km 0/130 to 0/270 at km 0/
Restoration of link road H B Paplah Km 0 00 to 4 225 SH CO R wall at RD 0 150 to 0 172 P L interlocking paver block at RD 0 500 to 0 620 and CC pavement at RD 0 120 to 0 220 and V Shape drain at Km 0 150 to 0 250 PDNA
R/R of Damages on link road from Jalath-I to Jalth-II in Km 0/00 to 0/900 C/o Up-gradation/Improvement of ROFD in Km 0/100 to 0/255 and R/wall at RD 0/030 to 0/043, 0/220 to 0/235, 0/357 to 0/372, 0/392 to 0/409
C/O link road from village Naiyan Basti Baliwal to Mohalla Rajputtan Km 0/00 to 1/600 G. P. Baliwal SH C/O CC pavement at RD 0/00 to 0/358 and 900 mm dia pipe culvert at RD 0/020 and C/O U shape drain at RD 0/00 to 0/045-RHS)- under MMSY
Restoration and reconstruction of link road Hira Nagar Dagrani Tobba to main road Dulehar via Ravi Dass Mandir Dulehar Upperla Km.0/00 to 2/00 SH C/O R/wall RD 0/720 to 0/736 LHS and edge wall RD 0/775 to 0/800 BHS and C/O CC pavement RD 0/635 to
Construction of road from NH-07 to Salamatpur Behrampur road km. 0/0 to 1/520. (SH- Providing and laying G-III and 20mm premix carpet in km 0/240 to 1/520). Under MNP
Balance work Construction of road from Royal Regency Hotel to Inder Nagar Top RD 0 00 to 0 300 SH C O R wall M S channel railing and stone soling in ward No 20
Formation and cutting in between Rd. 5/00 to 5/210
SH C/o 3 meters slab culvert at RD8/855 with wing walls under Himachal road improvement Scheme
Providing and Laying 80mm thick paver block
Prepration of structural Design of Foundation , Sub Structure and Super Structure 75.00 mtr Span (UNDER PMGSY)
Upgradation of Balyali to Takrer Road (T-05) PMGSY-III Batch-1 Package NO. HP08-543
km 0/0 to 11/400 including five year maintenance PMGSY-II (Batch I) 2019-20
SH Widening of road, Extension of curve, Cross Drainage work, Providing and laying GSB, WMM, 50mm thick Dense Graded Bitumen Macadam and 30 mm thick Bitumen concrete, PF Thire metall crash barrier and road furniture
REPAIR OF POT HOLES
SH Repair of patch work, painting wall, door and windows and Type V Qtr. No. 502 B/wall alongwith approach road for Colony in Polytechnic College Baru Hamirpur HP
site Dev, CO Harvesting Structure, Desliting tank, Sump Well, Pump House, delivery tank, Approach road and Fencing panel, S/E of P/Machinery and P/L of R/Main
(SH-Construction of building portion, Site development, Construction of approach road and boundary wall ,W.S and S.I, Construction of Rain water harvesting tank and septic tank including soak pit
Constrution of PSFS at Dharampur, Dsitrict Solan HP Sub Head Co V shape Road side Drain from 0/0 to 0/1235, Link Road from RD 0/0 to 0/220, Lane I Link, Road from RD 0/0 to 0/60 Lane 2
(SH- Green cover).
(SH- Construction of balance work of R/wall sitting Tiers and formation cutting of link road to Wrestling stadium)
Providing and laying Tack coat, Bituminous Concrete and Thermoplastic Paint in Km 0/0 to 0/750
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 0/0 to 0/750
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 2/400
Providing and laying Tack coat, Bituminous Concrete and Thermoplastic Paint in Km 0/750 to 2/0
Providing and laying Tack coat and Mix seal surfacing in Km. 1/00 to 3/00
Construction of Sultanpur Draman road Construction of Retaining wall at RD 0/750-770, 1/795-800, 2/390-410, 2/480-495 and 2/500-520
(SH- P/L 25mm thick Mix Seal Surfacing with paver finisher in km. 3/000 to 3/500)
Construction of road from Hara Tiyali Mandi road in Village Hara in G.P Hara under SDP Deposit work Balance work SH Providing and Laying Cement Concrete Pavement at RD. 0.138 to 0.223 and 0.266.50 to 0.281.50
Construction of road from Hanogi bridge to Sehanu Saloi GP Kholanal in Km 0/000 to 2/500 SH C/o R/Wall at RD 0/250 to 0/275 and 0/305 to 0/330
Construction of road from Cart Road to Bothwell in ward No 19 Sanjauli Chowk RD 0 0 to 0 40 (SH Cutting Excavation C C 1 3 6 and Providing and Fixing M S Channel Railing)