SH F/C 5/7 mtr wide road at RD 0/930 to 1/045
SH C/O R/Wall at RD 0/295 to 0/307
C/o 900mm dia R.C.C. Hume Pipe culvert between RD 0/00 to 1/00) (Under BASP)
Preparation of forest case constructed in violation of FCA-1980 Complete including
(Sub Head - Supplying and Stacking aggregate 20mm course sand boulders. Job No.1
P/L 20mm thick premix Carpet with seal coat in Km. 0/435 to 1/0(SCSP)
SH- P/A Tack Coat, Carpet and Seal Coat Km.0/0 to 1/0
S.H Widening of narrow reaches at R.D. 1.090 to 1.125,B Wall in R/R masonry at R.D. 1.255 to 1.267 and R Wall at R.D. 1.255 to 1.267
SH C O 600 mm dia RCC Hume pipe culvert at Rd 0 615 0 860 and 1 010 and P L WBM Grade I K M 1 600 to 2 100 and WBM Grade II k m 1 100 to 2 100 Under MNP
SH Construction of 5/7 metre wide road formation cutting 900mm dia RCC Hume Pipe Culvert, cement concrete pavement construction of V-Shape drain providing and laying parapets metaling tarring sign board and km stone in km 0/0 to 1/300
P/L GSB, MT, cement concrete pavement V-Shape drain in Km 0/00 to 0/950) (under MMGSY)
SH Construction of Hume Pipe Culvert 600mm at Rd 0/830 , 0/840
C/o 900mm dia hume pipe culvert at RD 1/700 with wing walls and P/L GSB,WMM and Tarring in Km. 1/910 to 2/120( Under MMGSY
C/O PCC R/Wall at Rd 0/350 to 0/415 PCC B/Wall at Rd.0/498 to 0/510 PCC V shape side drain and M/T in Km.0/350 to 0/510
SH Formation cutting, R.wall and B.wall and cross drainage works in Km. 0.000 to 0.800
Construction of B/wall in km. 0/960 to 0/980 and R/wall in km. 0/960 to 0/989)
P/L GSB at Rd 1/500 to 2/00 M/T in km 1/250 to 2/00 (Under SCSP Head)
Providing and laying 25 mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/000 to 1/000 ) Add. Kms. under AMP 2025-26- Village Road
SH Formation Cutting 5/7 mtr wide road at RD 0/900 to 1/690
P/L wet mix and 20mm thick premix carpet with seal in Km. 0/0 to 0/650).
Formation Cutting 5/7 mtr wide road in Km 0/000 to 1/405 and C/O PCC R/Wall at Rd 1/180 to 1/195 1/210 to 1/225
Providing and laying interlocking paver block at R.D.0/870 to 1/070 and construction of U-shape drain at R.D.1/00 to 1/320). Under Chief Minister Announcement work.
SH C/O 900 mm dia HPC at RD 0/630 and 600mm dia HPC at RD 1/050,P/L kharanja stone soling at various RDs B/Wall in wire create at RD 2/015 to 2/045 and Rofd between Km 0/910 to 1/010 and 1/705 to 2/00 Under SCDP
SH C/O B/wall in wire Crate at Rd 3/150 to 3/170 and ROFD at RD 3/250 to 3/300
Construction of P.C.C. R.wall, P.L 900mm dia Hume pipe, P.L GSB, Cement concrete pavement and Construction of V-shape drain in various RDs)
SH- P/A Tack Coat, Carpet and Seal coat Km.1/0 to 2/0
Construction of R/Wall from RD. 0/160 to 0/185 and 0/200 to 0/203)
SH- C/o U-shape drain at Km 0/000 to 0/100) (Under RRD Head)
F/C 5/7 mtrs wide in km. 0/00 to 1/180, C/o Dumping structures between km. 0/00 to 1/180)
Formation cutting in Km 0/0 to 2/100 and C/o wire crate for dumping site).
SH Formation Cutting 5/7 mtr wide road Km 0/00 to 0/135
Formation cutting and wire crate for dumping in Km 0/0 to 2/350
SH- Formation cutting 2.75/5.00 meter wide road in Km 0/0 to 2-910 and construction of wire crate for dumping site
C/O PCC B/wall at RD 0/690 to 0/710)
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work including five years routine maintenance
Formation cutting 5/7 mtr wide road in km 0/265 to 0/690 and Construction of wire crate for dumping site and R/Wall in km. 0/110 to 0/150
F/c 5/7 mtr wide in km. 0/345 to 0/630, C/o protection works between km. 0/00 to 0/630).
SH F/C 5/7 mtr wide road between Km 0/00 to 0315
C/o R/wall in wire crate at RD 0/560 to 0/590.
P/L Granular Sub-Base, WBM Grading-II, III and Premix Carpet Surfacing, C/o V-Shape Drain, Parapets and Road Side Edging, P/F W Metal Beam Crash Barrier and Road Furniture in Km 0/0 to 1/975
Formation cutting, C/o Edge wall with drain at RD 0/0 to 0/100, R/wall at RD 0/015 to 0/045, 0/045 to 0/065 and 0/075 to 0/100 and C/o 900mm dia hume pipe culvert at RD 0/065
Providing and Laying Cement Concrete Pavement at RD 0/0 to 0/110 and Construction of 900 mm dia Hume pipe culvert at RD 0/100 )
P/L 30mm thick bituminous concrete in kms 0/0 to 0/525 I/c paver block, G-III in pot holes.
Sh C/O wire crate at Rd 0/500 ti 1/00,HPC 900mm dia at RD 0/520, 0/560 and 0/84 and P/L GSB, G-II and Interlocking tiles at Rd 0/500 ti 0/800 ) (Under PDNA) (Lat 31.104372,long 76.75703)
Providing and laying GSB, WMM-II and 2 cm thick premix carpet with seal coat at RD. 0/0 to 0/500 (Under OTMNP)
(SH - C/O B/wall at RD 0/577 to 0/600 R/wall at RD 0/210 to 0/219)
ROFD, Hume Pipe Culvert, P/L GSB, G-II, G-III, M/T and P/L C.C. Pavement in slushy reaches)
SH Improvement/Upgradation of 5/7 mtr wide km 0/165 to 0/435
C/O B/wall at RD 0/180 TO 0/195 P/L CC Pavement in km 0/00 to 0/250