Loading…
Loading…
10,896 results • Best match
SH 5 7 meter wide road at RD 1.900 to 2.090
SH Formation cutting 5/7 mtr wide in Km 1/495 to 1/885,C/O breast wall at RD 0/0 to 0/020 and C/O HPC at RD 0/495 and 0/975
SH CO Widening of 5.7 mtr. wide road Protection Rd. 0.750 to 0.915
C/O Retaining wall and Cement concrete pavement at RD 0.310 to 0.500 Under BASP
SH F/C 5/7 mtr wide road at RD 0/345 to 0/600
SH C O BWall at Rd. 5.090 to 5.120 and 5.130 to 5.165
Providing and laying wearing grade-3 AND Metalling and Tarring in Km. 0/00 to 0/800
SH PL GSB WMM 25mm thick BC in Km 0 050 to 0 700 and P L RCCP and V shape drain
Construction of rain shelter at RD 0/010)
C/o, B/Wall at R.D. 2/210 to 2/250 and R/R Damages on Gumma Jashla Reoghati Road in K.M. 0/00 to 29/500, R/Wall in K.M. 0/940 to 0/955
Formation cutting in km 0/600 to 0/990
SH F/C 5/7 mtr wide road at RD 0/285 to 0/490 and C/O R/Wall at RD 0/060 to 0/075
Providing and Laying 25mm thick Bituminous Concrete in Km. 0/00 to 0/650 along with Providing and laying Hot Applied Thermoplastic compound 2.50mm thick for edge line in between km. 0/00 to 0/650) Under AMP 2025-26.
Formation cutting, H-pipe culvert and soling.
CO ROFD PCC B Wall in Km 1 540 to 1 560 CO PCC R Wall at RD1 200 to 1 240 1 340 to 1 380 and 1 450 to 1 470
SH C/O retaining wall at RD 1/065 to 1/085 and C/O Hume pipe culvert at RD 0/810 under SCSP
SH ROFD Providing and laying GSB WMM 25mm thick BC Hume pipe culvert V-shape drain in Km 0/0 to 0/250
Bed cutting in km. 0/0 to 0/040, edge wall in km. 0/105 to 0/140, breast wall in km. 0/094 to 0/130 and parapets in km. 0/0 to 0/400
SH- Improvement of grade at RD 0/0 to 0/135) MMGSY
Providing and laying metalling and Tarring at RD 1/205 to 1/955
(SH- Providing and laying 30mm thick bituminous concrete between Km. 0/0 to 3/0 ) for the year 2021-22) State
SH C o R wall in stone masonry in CM1 6 at RD. 1. 960 to1.990)
C/o, B/Wall at R.D. 0/795 to 0/820
Formation Cutting at Rd 0/000 to 0/300 and C/O Wire crate R/Wall in dumping site at Rd 0/030 to 0/054
SH C/O approach slab in km. 0/070, both side R/ wall and Wearing coat ) under MNP
P/L Side slop C.C,Pavement at RD 1/200 to 1/950). (OTMNP)
P/L P.C.C. 1.5.10, P.C.C. 1.3.6 and 60mm thick interlocking paver blocks in km. 0/00 to 0/200.) DMFT
SH- Formation cutting in Km0/0 to 1/00 and wire crate for dumping sites
SH M/T in K.M. 0/0 to 3/00
P/L WMM, Bituminous concrete 30mm thick V-shape Drain in km 0/00 to 0/230 )
Construction of Brest wall and retaining wall at various RDs Breast wall RD 0.800 to 0.860, 2.030 to 2.049 1/840 to 1/855 and 2/102 to 2/125 and Retaining wall RDs 2/100 to 2/120 and 1/600 to 1/625 Under SCSP
Formation Cutting 5/7 mtr wide road in Km 0/600 to 1/000
R/wall behind house of Sh. Hajaru Ram in km. 3/945 to 3/972.75. G.P. Sewra Chandi. DMFT
(SH- F/C 5/7mtr wide road cross drainage, protection work, metalling and tarring, side drain, parapet km 0/0 to 9/950)
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 0/00 to 1/00
(SH- ROFD at Various Rds R/wall at RD 0/0 to 0/010, 0/135 to 0/150, 0/200 to 0/210, 0/405 to 0/420,0/560 to 0/570,0/710 to 0/725, 0/920 to 0/935 and B/wall at RD 0/433 to 0/445 and wing wall of hume pipe culvert both side at RD 0/493 and 0/915 and
Construction of 900 mm dia hume pipe culvert at various R.D. 0/265 and 0/750 along with wing walls
Formation cutting Metalling and tarring.
Formation cutting 2.75/5.00 metre wide jeepable standard road km 1/00 to 3/780 and construction of wire crate for dumping site
Construction of 900mm dia Hume pipe culvert at RD. 3/625
C/o Cement Concrete Pavement at RD 0/500 to 0/540, 0/710 to 0/835 and 0/960 to 1/155
P/L C.C Pavement and Protection wall in various RDs)
C o 5 7 mtr wide formation cutting at RD. 0.360 to 0.690
SH- Providing and Laying Tack coat, 25 mm thick Mix Seal surfacing including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 2/700 to 4/00 ,4/00 to 5/00 and 5/00 to 5/500)(year 2024-25
P/L cement concrete pavement at rd 0/080 to 0/310, V-shape drain at Rd 0/310 to 0/630, Edge wall at Rd 0/125 to 0/140 and M/T in km 0/310 to 0/630) (Under SCSP Head
F C. 5 7 mtr wide road km 0. 0 to 0.515)
SH Const of Retaining wall at Rd 0/165 to 0/222.50)
P/L GSB,WBM G-II in Km 0/0 to 1/800
P/L Soling and M/T in km. 0/0 to 1/0) Under OTMNP Head
C/o Embankment, GSB and Wearing at RD 1/570 to 2/0). MMGSY.