Loading…
Loading…
10,896 results • Best match
C/o wing wall with slab culvert at RD 2/00 and C/o 900mm dia hume pipe culvert at RD 1/700) Under MMGSY
SH Construction of Retaining wall at RD 0/530 to 0/545 RHS and providing and laying GSB WMM SDBC in km 0/0 to 0/300
C/O 900mm dia hume pipe culvert at RD. 0/690 and 0/895 and P/L GSB at RD. 0/0 to 0/500
SH Formation cutting in Km 1/0 to 1/500
Providing and laying cement concrete pavement at Km. 0/633 to 0/888
F/C 2.75 to 5.00 mtr wide in Km. 0/00 to 0/250) Deposit work.
ROFD in km 0/0 to2/530, Hume pipe Culvert at RD 0/330 , 1/780 and C/oR/wall, B/wall in km 0/0 to1/070)
P/L 30mm thick bituminous concrete in KM 0/600 to 1/825
(SH- C/o B/Wall at RD 1/345 to 159, 2/730 to 2/756 R/wall at RD 1/446 to 1/455, 1/762 to 1/167)
formation cutting 5/7 meter single lane in km. 0/00 to 3/190, construction of R/wall, B/walls and box type culverts, wire crates walls for dumping structures at various Rds in between km. 0/00 to 0/510
ROFD in km 0/800 to 1/00, C/O R/wall at Rd 0/820 to 0/828 and 0/940 to 0/947 P/L cement concrete pavement at km 0/800 to 1/00) (Under OTMNP Head
P/L 25mm thick bituminous concrete in kms 2/0 to 3/0 and G-III with 20mm thick premix carpet in patches and U-shape drain at RD 2/250 to 2/350 and interlocking concrete paver block in kms 2/200 to 2/250.
SH C O V Shape at Km 0 405 to 0 600 and 0 605 to 0 880 and repair of pot hole km 0 00 to 0 105 0 210 to 0 760 PDNA
C/o, R/Walls at R.D. 2/043 to 2/048, 3/610 to 3/620, 3/962 to 3/971, 4/465 to 4/475, 4/545 to 4/540 and B/Walls at R.D. 3/610 to 3/620
P/L GSB, WMM from Km 0/00 to 0/405, cement concrete pavement at Rd 0/405 to 0/800 and C/O B/wall at Rd 0/155 to 0/165, R/wall at Rd 0/220 to 0/230, 0/260 to 0/274 and 0/550 to 0/560) (under MMGSY)
C/o, R/Wall at R.D. 1/631 to 1/643
SH Formation cutting ROFD construction RCC Slab Culvert PCC Edge Wall
SH P L WBM G II and PC with seal coat between k M 6 0 to 6 650
P/L G-II 2cm ,thick premix carpet with seal coat in km 0/0 to 3/210).SCSP
P/L Kharanja Soling at Rd 0/000 to 1/210 and C/O 900mm dia hume pipe culvert at rd 0/260 0/600 and 1/045
P/L GSB, WBM-III and 30 mm thick Bitumen concrete and Drain) under Rural Urban Mission
SH- Providing and Laying G- 11, G-111, and M/T work in km 0/00 to 0/700.
ROFD in km 0/610 to 0/675 and 0/855 to 1/00 , C/o Hume pipe culvert 900 mm dia along with wing wall at RD 0/780 and C/o edge wall at RD 0/543 to 0/598).
SH Preparation of Sub Grade and premix carpet in km 2/100 to 2/800
Providing and Laying of WBM, G-II in K.M. 1/00 to 2/00
SH Formation Cutting 5/7 mtr wide Road between Km 0/510 to 1/000
Providing and laying wearing grade-II and cement concrete pavement in Km. 0/0 to 0/200
(SH-Repair of pot holes by providing penetration for correction layer and 30mm thick bituminous concrete in km.1/250 to 1/700 and km.1/00 to 2/00)under AMP for the year 2022-23.
Repair of 900mm dia hume pipe culvert at RD. 1/585
SH Construction of 5/7 metre FC CD in km 0/495 to 1/085 and P/L GSB Wet Mix Macadam SDBC including V Shape Drain at km 0/685 to 1/085
ROFD between Km. 0/930 to 1/435). Under PDNA 2023
P/L G-II 2cm. thick premix carpet with seal coat in km. 0/0 to 3/210). Under SCSP
FC in km 0/450 to 0/555, C/O 4.00 mtr span RCC Slab Type Culvert at RD 0/570 2.00 mtr span RCC Slab Type Culvert at RD 0/390 0/690
Cement concrete pavement at RD 0/200 to 0/458
Head Formation cutting at RD 1/855 to 2/250
SH C/O R/Wall at RD 3/510 to 3/534 and HPC 900 mm dia at RD 4/100
SH C/O PCC Retaining wall at RD 0/240 to 0/255 and 0/690 to 0/700
SH Removal of formation defficiency and Cross drainage in Km 0/0 to 1/500
F/C, hume pipe culvert, R/Walls, M/T works and PCC drain in km. 0/0 to 0/600) Under SCSP
SH Construction of 900mm dia Hume pipe culvert at Rd 1/825 ,2/535,2/618 with wing wall both side and Providing Khuranja Stone Soling at Various Slushy reaches between Km 0/00 to 2/900
(SH- P/L soling, wearing and tarring in 0.500Km. Length at deferent RDs)
SH PL Bituminous macadam Bituminous concrete MSS
Formation cutting in km 0/00 to 0/500,C/O 3.00 mtr span RCC Slab type culvert at RD 0/270,P/L 900mm dia RCC Hume pipe Culvert at Rd 0/090 C/o R/wall at Rd 0/00 to 0/030 0/120 to 0/135
SH Improvement of Formatio Defficiancy between RD 0/610 to 1/030
SH- Formation cutting and wire crate for dumping sites
SH F C metr. Wide road Km. 0 0 to 0.345
ROFD in km 0/200 TO 0/305, P/L cement concrete pavement from RD 0/00 to Km 0/350 V-shape drain at various RD s in between km 0/00 to 0/350). (under PDNA
(SH- F/C 5/7mtr wide road at RD 0/0 to 1/0)
C/o 900mm dia. RCC Hume Pipe Culverts at RD 1/800, 2/035 and 3/500